Limitations on Locating Multiple Generation Facilities Under Electric Utility Tariffs for Remote Net Metering
PURSUANT TO THE PROVISIONS OF THE State Administrative Procedure Act, NOTICE is hereby given of the following proposed rule:
Proposed Action:
The Commission is considering limitations on the interconnection of multiple generation facilities at host and satellite locations under electric utility tariffs providing for remote net metering.
Statutory authority:
Public Service Law, sections 5(2), 66-j and 66-l
Subject:
Limitations on locating multiple generation facilities under electric utility tariffs for remote net metering.
Purpose:
Consider limitations on locating multiple generation facilities under electric utility tariffs for remote net metering.
Substance of proposed rule:
The Public Service Commission is considering, pursuant to a Notice Instituting Proceeding and Soliciting Comments issued May 11, 2015 in Case 15-E-0267, limitations on the interconnection of multiple generation facilities at host and satellite locations imposed under electric utility tariffs providing for remote net metering. These tariffs limit remote net metering to arrangements where credits are distributed from a single generator serving a single host meter, with the installation of generation at satellite locations prohibited. The Commission may grant or deny, in whole or in part, any relief proposed, and may resolve related matters.
Text of proposed rule and any required statements and analyses may be obtained by filing a Document Request Form (F-96) located on our website http://www.dps.ny.gov/f96dir.htm. For questions, contact:
Elaine Agresta, Public Service Commission, 3 Empire State Plaza, Albany, New York 12223-1350, (518) 486-2660, email: [email protected]
Data, views or arguments may be submitted to:
Kathleen H. Burgess, Public Service Commission, 3 Empire State Plaza, Albany, New York 12223-1350, (518) 474-6530, email: [email protected]
Public comment will be received until:
45 days after publication of this notice.
Regulatory Impact Statement, Regulatory Flexibility Analysis, Rural Area Flexibility Analysis and Job Impact Statement
Statements and analyses are not submitted with this notice because the proposed rule is within the definition contained in section 102(2)(a)(ii) of the State Administrative Procedure Act.
(15-E-0267SP1)