Costs of Interconnecting a Net Metered Farm Waste Generator

NY-ADR

9/9/09 N.Y. St. Reg. PSC-36-09-00007-P
NEW YORK STATE REGISTER
VOLUME XXXI, ISSUE 36
September 09, 2009
RULE MAKING ACTIVITIES
PUBLIC SERVICE COMMISSION
PROPOSED RULE MAKING
NO HEARING(S) SCHEDULED
 
I.D No. PSC-36-09-00007-P
Costs of Interconnecting a Net Metered Farm Waste Generator
PURSUANT TO THE PROVISIONS OF THE State Administrative Procedure Act, NOTICE is hereby given of the following proposed rule:
Proposed Action:
The Commission is considering a complaint from the Boxler Dairy Farm asking for a determination of the costs Niagara Mohawk Power Corporation d/b/a National Grid may collect for interconnecting a net metered farm waste generator.
Statutory authority:
Public Service Law, section 66-j
Subject:
Costs of interconnecting a net metered farm waste generator.
Purpose:
To determine the costs of interconnecting a net metered farm waste generator.
Substance of proposed rule:
The Public Service Commission is considering a complaint from the Boxler Dairy Farm (the Farm) asking for a determination that the costs Niagara Mohawk Power Corporation d/b/a National Grid (National Grid) may collect for interconnecting a 500 kW net metered farm waste generator to be installed at the Farm's location will be limited to no more than $5,000, instead of the approximately $141,000 National Grid proposes to collect. The Commission may adopt, reject or modify, in whole or in part, the relief proposed.
Text of proposed rule and any required statements and analyses may be obtained by filing a Document Request Form (F-96) located on our website http://www.dps.state.ny.us/f96dir.htm. For questions, contact:
Leann Ayer, Public Service Commission, 3 Empire State Plaza, Albany, New York 12223-1350, (518) 486-2655, email: [email protected]
Data, views or arguments may be submitted to:
Jaclyn A. Brilling, Secretary, Public Service Commission, 3 Empire State Plaza, Albany, New York 12223-1350, (518) 474-6530, email: [email protected]
Public comment will be received until:
45 days after publication of this notice.
Regulatory Impact Statement, Regulatory Flexibility Analysis, Rural Area Flexibility Analysis and Job Impact Statement
Statements and analyses are not submitted with this notice because the proposed rule is within the definition contained in section 102(2)(a)(ii) of the State Administrative Procedure Act.
(09-E-0608SP1)
End of Document