§ 14801. Construction of sewer more than five feet from building
Where the ground is of sufficient solidity for a proper foundation, cylindrical terra-cotta pipe of the best quality, free from flaws, splits, or cracks, perfectly burned, and well glazed over the entire inner and outer surfaces, may be used, if laid on a smooth bottom, with a special groove cut in the bottom of the trench for each hub, in order to give the pipe a solid bearing on its entire length, and the soil well rammed on each side of the pipe. The spigot and hub ends shall be connected. The space between the hub and the pipe must be thoroughly filled with cement mortar, made of equal parts of the best American natural cement and bar sand, thoroughly mixed dry, and enough water afterwards added to give proper consistency. The mortar must be mixed in small quantities, and used as soon as made. The joints must be carefully wiped out and pointed, and all mortar that may be left inside removed, and the pipe left clean and smooth throughout, for which purpose a swab may be used. It must not be laid closer than five feet to any exterior wall of a building, or less than three and one-half feet below the surface of the ground, or when the sewer passes near a well, nor will it be allowed in bad or made ground.

Credits

1911, June 7, P.L. 680, § 13.
53 P.S. § 14801, PA ST 53 P.S. § 14801