§ 680.5. Watershed storm water plans and contents
Purdon's Pennsylvania Statutes and Consolidated StatutesTitle 32 P.S. Forests, Waters and State Parks
32 P.S. § 680.5
§ 680.5. Watershed storm water plans and contents
(a) Within two years following the promulgation of guidelines by the department pursuant to section 14,1 each county shall prepare and adopt a watershed storm water management plan for each watershed located in the county as designated by the department, in consultation with the municipalities located within each watershed, and shall periodically review and revise such plan at least every five years. The department may, for good cause shown, grant an extension of time to any county for the preparation and adoption of a watershed storm water management plan.
(9) a designation of those areas to be served by storm water collection and control facilities within a ten-year period, an estimate of the design capacity and costs of such facilities, a schedule and proposed methods of financing the development, construction and operation of such facilities, and an identification of the existing or proposed institutional arrangements to implement and operate the facilities;
(1) contain such provisions as are reasonably necessary to manage storm water such that development or activities in each municipality within the watershed do not adversely affect health, safety and property in other municipalities within the watershed and in basins to which the watershed is tributary; and
Credits
1978, Oct. 4, P.L. 864, No. 167, § 5, imd. effective.
Footnotes
32 P.S. § 680.14.
32 P.S. § 680.5, PA ST 32 P.S. § 680.5