Home Table of Contents

§ 3306. Specifications for construction projects

Purdon's Pennsylvania Statutes and Consolidated StatutesTitle 52 P.S. Mines and Mining

Purdon's Pennsylvania Statutes and Consolidated Statutes
Title 52 P.S. Mines and Mining (Refs & Annos)
Chapter 28. Noncoal Surface Mining Conservation and Reclamation Act (Refs & Annos)
52 P.S. § 3306
§ 3306. Specifications for construction projects
It shall be the duty of the architects, engineers or other persons preparing specifications for construction projects, which specifications include the requirement that the construction contractor supply fill for the project, to include, within the specifications, a specific reference to this act and the regulations pertaining to this act adopted by the department. If such a reference is omitted from the specifications and reclamation and planting of the land from which the fill was removed by the construction contractor is required under this act, any contract based on the specifications may be amended, at the option of the construction contractor, to allow a reasonable price for the reclamation and planting of the land affected in accordance with a plan acceptable to the secretary.

Credits

1984, Dec. 19, P.L. 1093, No. 219, § 6, effective in 60 days.
52 P.S. § 3306, PA ST 52 P.S. § 3306
Current through Act 10 of the 2024 Regular Session. Some statute sections may be more current, see credits for details.