OFFICE FOR THE AGING
Agency I.D No. AGE-44-18-00005
Subject Matter: Nutrition Program
Purpose of Action:The purpose of this rule is to update the regulations governing the Nutrition Program
Issue Date, Action
10-31-18 Proposed
Top
DEPARTMENT OF AGRICULTURE AND MARKETS
Agency I.D No. AAM-34-18-00001
Subject Matter: Importation of cervids susceptible to Chronic Wasting Disease ("CWD").
Purpose of Action:To help control the spread of CWD into the State's cervid population.
Issue Date, Action
08-22-18 Emergency/Proposed
Issue Date, Action
10-31-18 Emergency
Issue Date, Action
12-26-18 Emergency
Issue Date, Action
01-30-19 Finalized
Agency I.D No. AAM-40-18-00021
Subject Matter: Shell Eggs; Acidified Foods
Purpose of Action:To continue regulatory powers in connection with acidified foods and shell eggs used in foods for human consumption
Issue Date, Action
10-03-18 Emergency/Proposed
Issue Date, Action
12-12-18 Emergency
Issue Date, Action
02-27-19 Emergency
Issue Date, Action
03-06-19 Finalized
Agency I.D No. AAM-41-18-00001
Subject Matter: Spotted Lanternfly ("SL")
Purpose of Action:To prevent SL-infested articles originating in or moving through areas in other states where SL is present from entering NYS
Issue Date, Action
10-10-18 Emergency/Proposed
Issue Date, Action
12-26-18 Emergency
Issue Date, Action
01-23-19 Finalized
Agency I.D No. AAM-43-18-00002
Subject Matter: Certification of Industrial Hemp Seed
Purpose of Action:To establish standards for certification of industrial hemp seed
Issue Date, Action
10-24-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. AAM-49-18-00001
Subject Matter: Licensing of malt operators and processors
Purpose of Action:To exempt malt operators and processors producing under a certain volume from licensing requirements and fees
Issue Date, Action
12-05-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. AAM-10-19-00002
Subject Matter: National Institute of Standards and Technology ("NIST") Handbook 44
Purpose of Action:To incorporate NIST Handbook 44 (2019 edition)
Issue Date, Action
03-06-19 Proposed
Issue Date, Action
06-19-19 Finalized
Agency I.D No. AAM-17-19-00001
Subject Matter: Farm wineries, breweries, and distilleries; hops processors; and cideries
Purpose of Action:To update references to regulations and to exempt small hops processors from food processing licensing requirements
Issue Date, Action
04-24-19 Proposed
Agency I.D No. AAM-18-19-00001
Subject Matter: Incorporation by reference of the 2017 edition of the Grade A Pasteurized Milk Ordinance ("PMO").
Purpose of Action:To require certain producers, processors and manufacturers of milk and milk products to comply with the 2017 edition of the PMO.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. AAM-21-19-00002
Subject Matter: Control of the European Cherry Fruit Fly
Purpose of Action:To help control the spread of the European Cherry Fruit Fly (ECFF), which renders cherries unmarketable if they are infested.
Issue Date, Action
05-22-19 Emergency/Proposed
Top
OFFICE OF ALCOHOLISM AND SUBSTANCE ABUSE SERVICES
Agency I.D No. ASA-12-18-00001
Subject Matter: Problem Gambling Treatment and Recovery Services
Purpose of Action:Repeals existing gambling regulation; replaces with substantially updated provisions
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
10-17-18 Revised
Issue Date, Action
03-20-19 Finalized
Agency I.D No. ASA-21-18-00025
Subject Matter: Credentialing of Addictions Professionals
Purpose of Action:Repeal obsolete rules; update process of credentialing addictions professionals
Issue Date, Action
05-23-18 Proposed
Issue Date, Action
10-17-18 Revised
Issue Date, Action
06-12-19 Expired
Agency I.D No. ASA-21-18-00026
Subject Matter: Appeals, Hearings and Rulings
Purpose of Action:Protect patient confidentiality, update due process provisions, technical amendments.
Issue Date, Action
05-23-18 Proposed
Issue Date, Action
06-12-19 Expired
Agency I.D No. ASA-51-18-00019
Subject Matter: General provisions
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Revised
Issue Date, Action
05-29-19 Finalized
Agency I.D No. ASA-51-18-00020
Subject Matter: Substance Use Disorder Withdrawal and Stabilization Services
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. ASA-51-18-00021
Subject Matter: Substance Use Disorder Residential Rehabilitation Services for Youth
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. ASA-51-18-00022
Subject Matter: Substance Use Disorder Inpatient Rehabilitation
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. ASA-51-18-00023
Subject Matter: Patient Rights
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. ASA-51-18-00024
Subject Matter: General Service Standards for Substance Use Disorder Outpatient Programs
Purpose of Action:Update provisions consistent with treatment developments; definitions; technical gender language
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Top
DEPARTMENT OF AUDIT AND CONTROL
Agency I.D No. AAC-06-18-00002
Subject Matter: Update provisions relating to Employer Reporting; Service Credit Determination for certain members; and Notice of Hearings
Purpose of Action:To update language necessitated by the modernization and redesign of the retirement system's benefit administration system
Issue Date, Action
02-07-18 Proposed
Issue Date, Action
02-13-19 Revised
Issue Date, Action
04-24-19 Finalized
Agency I.D No. AAC-50-18-00001
Subject Matter: Reporting of Miscellaneous Abandoned property
Purpose of Action:To update and clarify requirements relating to the reporting of miscellaneous abandoned property
Issue Date, Action
12-12-18 Proposed
Issue Date, Action
04-17-19 Finalized
Agency I.D No. AAC-07-19-00017
Subject Matter: Reporting requirements for service credit involving public safety overtime
Purpose of Action:To allow certain special duty assignments to qualify as public safety overtime and be considered allowable service
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
05-29-19 Finalized
Top
OFFICE OF CHILDREN AND FAMILY SERVICES
Agency I.D No. CFS-51-18-00010
Subject Matter: Residential and non-residential services to victims of domestic violence
Purpose of Action:To conform the existing regulations to comply with state and federal laws regarding services to victims of domestic violence
Issue Date, Action
12-19-18 Proposed
Agency I.D No. CFS-19-19-00006
Subject Matter: Procedures for addressing children absent without consent from foster care, conditional releases and searches
Purpose of Action:To put into place procedures for children absent without consent from foster care, conditional releases and searches
Issue Date, Action
05-08-19 Emergency/Proposed
Agency I.D No. CFS-19-19-00009
Subject Matter: Child Care Market Rates
Purpose of Action:To adjust child care market rates in accordance with the results of the most recent cost of care market survey
Issue Date, Action
05-08-19 Emergency/Proposed
Agency I.D No. CFS-20-19-00001
Subject Matter: To eliminate requirement that victims of domestic violence apply for public assistance to pay for cost of shelter and services
Purpose of Action:To eliminate requirement that victims of domestic violence apply for public assistance to pay for cost of shelter and services
Issue Date, Action
05-15-19 Emergency/Proposed
Top
DEPARTMENT OF CIVIL SERVICE
Agency I.D No. CVS-12-18-00012
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a subheading and a position in the non-competitive class
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
04-10-19 Expired
Agency I.D No. CVS-12-18-00025
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
04-10-19 Expired
Agency I.D No. CVS-12-18-00030
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
04-10-19 Expired
Agency I.D No. CVS-12-18-00035
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
04-10-19 Expired
Agency I.D No. CVS-21-18-00022
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class and to delete a position from the non-competitive class
Issue Date, Action
05-23-18 Proposed
Issue Date, Action
06-12-19 Expired
Agency I.D No. CVS-33-18-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
08-15-18 Proposed
Agency I.D No. CVS-33-18-00013
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a subheading and a position in the non-competitive class
Issue Date, Action
08-15-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-41-18-00006
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00008
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00009
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00010
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00011
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-41-18-00012
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete a position from and classify a position in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00013
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00014
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00015
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00016
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00017
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00018
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00019
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete from and classify positions in the exempt and non-competitive classes
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-41-18-00020
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete from and classify positions in the exempt and non-competitive classes
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. CVS-46-18-00006
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00008
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00009
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00010
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the non-competitive class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00011
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt and non-competitive classes
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-46-18-00012
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the non-competitive class
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. CVS-51-18-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00005
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00006
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the non-competitive class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00008
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-51-18-00009
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete a position from and classify positions in the non-competitive class
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CVS-02-19-00001
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete a position from and classify a position in the exempt class
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. CVS-02-19-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the labor class
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. CVS-02-19-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. CVS-02-19-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. CVS-02-19-00005
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. CVS-06-19-00001
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
02-06-19 Proposed
Agency I.D No. CVS-06-19-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete a position from and classify a position in the non-competitive class
Issue Date, Action
02-06-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. CVS-06-19-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the non-competitive class
Issue Date, Action
02-06-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. CVS-06-19-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
02-06-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. CVS-13-19-00001
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
03-27-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. CVS-13-19-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class
Issue Date, Action
03-27-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. CVS-13-19-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
03-27-19 Proposed
Agency I.D No. CVS-13-19-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
03-27-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. CVS-13-19-00005
Subject Matter: Jurisdictional Classification
Purpose of Action:To add a subheading and to classify a position in the non-competitive class
Issue Date, Action
03-27-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. CVS-14-19-00003
Subject Matter: Supplemental military leave benefits
Purpose of Action:To extend the availability of supplemental military leave benefits for certain New York State employees until December 31, 2019
Issue Date, Action
04-03-19 Proposed
Agency I.D No. CVS-15-19-00001
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-15-19-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete a position from and classify a position in the non-competitive class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-15-19-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the non-competitive class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-15-19-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class and to delete a position from the non-competitive class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-15-19-00005
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the non-competitive class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-15-19-00006
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt class
Issue Date, Action
04-10-19 Proposed
Agency I.D No. CVS-18-19-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class
Issue Date, Action
05-01-19 Proposed
Agency I.D No. CVS-18-19-00008
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from the non-competitive class
Issue Date, Action
05-01-19 Proposed
Agency I.D No. CVS-25-19-00001
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt and non-competitive classes.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00002
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the exempt class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00003
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify a position in the exempt class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00004
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00005
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify a position in the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00006
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00007
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify a position in the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00008
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00009
Subject Matter: Jurisdictional Classification
Purpose of Action:To delete positions from and classify positions in the exempt and non-competitive classes.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. CVS-25-19-00010
Subject Matter: Jurisdictional Classification
Purpose of Action:To classify positions in the non-competitive class.
Issue Date, Action
06-19-19 Proposed
Top
STATE COMMISSION OF CORRECTION
Agency I.D No. CMC-42-18-00001
Subject Matter: Necessary age for admission to an adult lockup
Purpose of Action:To ensure that individuals under 17 years old are not admitted to an adult lockup
Issue Date, Action
10-17-18 Emergency/Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. CMC-05-19-00004
Subject Matter: Inmate confinement and deprivation
Purpose of Action:Require local correctional facilities to record, review and report inmate cell confinement and essential service deprivation
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
06-05-19 Finalized
Top
Agency I.D No. CCS-05-19-00006
Subject Matter: Standard Conditions of Release Parole Revocation Dispositions
Purpose of Action:Establish standard conditions of release and provide a workable structure for applying appropriate parole revocation penalties
Issue Date, Action
01-30-19 Proposed
Agency I.D No. CCS-21-19-00014
Subject Matter: Adolescent Offender Facilities
Purpose of Action:To reclassify two existing correctional facilities to adolescent offender facilities.
Issue Date, Action
05-22-19 Proposed
Top
DIVISION OF CRIMINAL JUSTICE SERVICES
Agency I.D No. CJS-32-18-00004
Subject Matter: New Rule 359: Role of Probation in Youth Part of Superior Court
Purpose of Action:Update job specifications and required knowledge, skills, and abilities for probation professionals employed by localities.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
12-19-18 Finalized
Agency I.D No. CJS-32-18-00005
Subject Matter: Case Record Management
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-32-18-00006
Subject Matter: Investigations and Reports
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-32-18-00007
Subject Matter: Probation Supervision
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-32-18-00008
Subject Matter: Graduated Sanctions and Violations of Probation, retitled to: Graduated Responses
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-32-18-00009
Subject Matter: Preliminary Procedure for Article 3 JD Intake, retitled to: Probation Services for Article 3 Juvenile Delinquency(JD)
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-32-18-00010
Subject Matter: New Rule 359: Role of Probation in Youth Part of Superior Court
Purpose of Action:Update existing Rule to reflect services which will be performed by Probation departments as a result of Raise the Age law.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. CJS-20-19-00003
Subject Matter: Certified Instructors and Course Directors
Purpose of Action:Establish/maintain effective procedures governing certified instructors and course directors who deliver MPTC-approved courses
Issue Date, Action
05-15-19 Proposed
Agency I.D No. CJS-21-19-00004
Subject Matter: Changes the accrediting authority to the ANSI-ASQ National Accreditation Board.
Purpose of Action:To change the accrediting authority to the ANSI-ASQ National Accreditation Board.
Issue Date, Action
05-22-19 Proposed
Top
DEPARTMENT OF ECONOMIC DEVELOPMENT
Agency I.D No. EDV-44-18-00001
Subject Matter: Empire Zones reform
Purpose of Action:Allow Dept to continue implementing Zones reforms and adopt changes that would enhance program's strategic focus
Issue Date, Action
10-31-18 Emergency
Agency I.D No. EDV-44-18-00002
Subject Matter: START-UP NY Program.
Purpose of Action:Establish procedures for the implementation and execution of START-UP NY.
Issue Date, Action
10-31-18 Emergency
Agency I.D No. EDV-05-19-00001
Subject Matter: START-UP NY Program.
Purpose of Action:Establish procedures for the implementation and execution of START-UP NY.
Issue Date, Action
01-30-19 Emergency
Agency I.D No. EDV-05-19-00002
Subject Matter: Empire Zones reform
Purpose of Action:Allow Dept to continue implementing Zones reforms and adopt changes that would enhance program's strategic focus
Issue Date, Action
01-30-19 Emergency
Agency I.D No. EDV-17-19-00003
Subject Matter: START-UP NY Program.
Purpose of Action:Establish procedures for the implementation and execution of START-UP NY.
Issue Date, Action
04-24-19 Emergency
Agency I.D No. EDV-17-19-00004
Subject Matter: Empire Zones reform
Purpose of Action:Allow Dept to continue implementing Zones reforms and adopt changes that would enhance program's strategic focus
Issue Date, Action
04-24-19 Emergency
Top
EDUCATION DEPARTMENT
Agency I.D No. EDU-13-18-00027
Subject Matter: Teacher Certification in Health Education
Purpose of Action:Creation of a Transitional K Certificate for Certain New York State Licensed Health Professionals to Teach Health Education
Issue Date, Action
03-28-18 Proposed
Issue Date, Action
04-17-19 Expired
Agency I.D No. EDU-19-18-00006
Subject Matter: The implementation of New York’s approved ESSA plan to comply with the provisions of the Every Student Succeeds Act
Purpose of Action:To implement New York’s approved ESSA plan and to comply with the provisions of the Every Student Succeeds Act
Issue Date, Action
05-09-18 Proposed
Issue Date, Action
07-18-18 Emergency/Revised
Issue Date, Action
10-03-18 Emergency/Revised
Issue Date, Action
11-21-18 Emergency
Issue Date, Action
12-26-18 Revised
Issue Date, Action
01-02-19 Emergency
Issue Date, Action
02-27-19 Emergency
Issue Date, Action
04-24-19 Finalized
Issue Date, Action
04-24-19 Emergency
Agency I.D No. EDU-40-18-00007
Subject Matter: Certificate progression pathway
Purpose of Action:Initial Certificate Requirements for Individuals Who Have a Graduate Degree and Two Years of Postsecondary Teaching Experience
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
01-30-19 Finalized
Agency I.D No. EDU-40-18-00008
Subject Matter: P-20 Principal Preparation Pilot Program
Purpose of Action:To establish the requirements for the P-20 Principal Preparation Pilot Program
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
01-30-19 Finalized
Agency I.D No. EDU-40-18-00009
Subject Matter: Students with Disabilities
Purpose of Action:To conform the Commissioner's regulations to Chapters 422, 428 and 429 of the Laws of 2017
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
04-24-19 Finalized
Agency I.D No. EDU-40-18-00010
Subject Matter: Professional development plans and other related requirements for school districts and BOCES
Purpose of Action:To improve the quality of teaching and learning for teachers and leaders for professional growth
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
01-30-19 Revised
Issue Date, Action
06-26-19 Revised
Agency I.D No. EDU-40-18-00011
Subject Matter: School Breakfast Programs
Purpose of Action:To initiate, maintain, or expand school breakfast programs iand make technical amendments to conform to federal requirements
Issue Date, Action
10-03-18 Emergency/Proposed
Issue Date, Action
12-26-18 Emergency
Issue Date, Action
01-30-19 Finalized
Agency I.D No. EDU-40-18-00012
Subject Matter: Prohibition against meal shaming
Purpose of Action:Requires certain schools to develop a plan to prohibit against meal shaming or treating pupils with unpaid meal fees differently
Issue Date, Action
10-03-18 Emergency/Proposed
Issue Date, Action
12-26-18 Emergency
Issue Date, Action
01-30-19 Finalized
Agency I.D No. EDU-44-18-00006
Subject Matter: Limited extensions and program requirements for certain career and technical education teachers
Purpose of Action:Creation of an extension for holders of the Career and Technical Education Certificate to Teach Grades 5 and 6
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. EDU-44-18-00007
Subject Matter: Alternative pathways for certificate for certain teachers who hold Students with Disabilities certificate
Purpose of Action:Establishes limited extensions and statements of continued eligibility pathways for teachers who hold certain teaching certificates for Students with Disabilities in grades 7-12
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. EDU-47-18-00010
Subject Matter: English Language Learner Grade Span Waiver Requirement
Purpose of Action:To provide a one-year renewable waiver to expand the allowable grade span for ENL and BE classes to three contiguous grades
Issue Date, Action
11-21-18 Emergency/Proposed
Issue Date, Action
01-30-19 Emergency
Issue Date, Action
02-27-19 Finalized
Agency I.D No. EDU-52-18-00004
Subject Matter: Student teaching requirements for teacher certification and the registration of teacher preparation programs.
Purpose of Action:To revise the student teaching requirements for teacher certification and the registration of teacher preparation programs.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
04-24-19 Finalized
Agency I.D No. EDU-52-18-00005
Subject Matter: Annual professional performance reviews.
Purpose of Action:To extend the transition period for an additional year (until 2019-2020).
Issue Date, Action
12-26-18 Proposed
Agency I.D No. EDU-05-19-00007
Subject Matter: Transitional H Pathway for School District Business Leader Certifications
Purpose of Action:To Expand the Type of Eligible Experiences for the Transitional H Pathway for School District Business Leader Certification
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
05-22-19 Finalized
Agency I.D No. EDU-05-19-00008
Subject Matter: Protecting Personally Identifiable Information
Purpose of Action:To implement the provisions of Education Law section 2-d
Issue Date, Action
01-30-19 Proposed
Agency I.D No. EDU-05-19-00016
Subject Matter: The administration of certain vaccines by pharmacy interns
Purpose of Action:To implement the provisions of Chapter 359 of the Laws of 2018
Issue Date, Action
01-30-19 Emergency/Proposed
Issue Date, Action
05-01-19 Emergency
Issue Date, Action
05-22-19 Finalized
Agency I.D No. EDU-05-19-00017
Subject Matter: Assessments and Student Official Transcripts and Permanent Records
Purpose of Action:To continue the effectiveness of Part AA, Subpart B of Ch.56 L.2014 as amended by Section 35 of Part CCC of Ch. 56 L.2018
Issue Date, Action
01-30-19 Emergency/Proposed
Issue Date, Action
04-24-19 Emergency/Revised
Agency I.D No. EDU-13-19-00009
Subject Matter: The Execution by Registered Professional Nurses of Non-Patient Specific Orders to Administer Immunizations
Purpose of Action:To conform the regulation to current immunization standards
Issue Date, Action
03-27-19 Emergency/Proposed
Issue Date, Action
06-19-19 Emergency/Revised
Agency I.D No. EDU-17-19-00005
Subject Matter: Extension of the Educational Technology Specialist Content Specialty Test Safety Net
Purpose of Action:Safety net enables candidates to take either the revised Educational Technology Specialist CST or the predecessor CST
Issue Date, Action
04-24-19 Emergency/Proposed
Agency I.D No. EDU-17-19-00006
Subject Matter: Registration requirements for school counselor programs and certification requirements for school counselors
Purpose of Action:To amend requirements for registered school counselor programs and the certification requirements for school counselors
Issue Date, Action
04-24-19 Proposed
Agency I.D No. EDU-17-19-00007
Subject Matter: Extension of the edTPA Safety Net for Candidates Who Receive a Failing Score on the Library Specialist edTPA
Purpose of Action:The safety net enables candidates to be held harmless during the handbook revision process
Issue Date, Action
04-24-19 Proposed
Agency I.D No. EDU-17-19-00008
Subject Matter: To require study in language acquisition and literacy development of English language learners in certain teacher preparation
Purpose of Action:To ensure that newly certified teachers enter the workforce fully prepared to serve our ELL population
Issue Date, Action
04-24-19 Proposed
Agency I.D No. EDU-21-19-00007
Subject Matter: The Certification of Manufacturers and Wholesalers for Export Purposes
Purpose of Action:To clarify who may issue free sale certificates to New York State registered manufacturers or wholesalers
Issue Date, Action
05-22-19 Emergency/Proposed
Agency I.D No. EDU-21-19-00008
Subject Matter: Continuing Teacher and Leader Education (CTLE) for Educators in nonpublic schools.
Purpose of Action:To make technical amendments to the CTLE regulations for educators employed in nonpublic schools.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. EDU-21-19-00009
Subject Matter: Creation of safety nets for the science Content Specialty Tests (CSTs)
Purpose of Action:Allow candidates to be held harmless during a one-year transition period from the predecessor CSTs to the revised CST's
Issue Date, Action
05-22-19 Proposed
Agency I.D No. EDU-21-19-00010
Subject Matter: Conditional initial certificate requirements.
Purpose of Action:Provides that candidates may be eligible for an Initial certificate even after their conditional initial certificate expires.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. EDU-21-19-00011
Subject Matter: Educational Broadcast Councils and Radio Stations
Purpose of Action:Reduce costs incurred by each Council and Radio Station for redundant annual certified audits & to streamline reporting process
Issue Date, Action
05-22-19 Proposed
Agency I.D No. EDU-21-19-00012
Subject Matter: Requirements for Transitional D Programs that Lead to School District Leader Certification
Purpose of Action:Certificate enables the candidates to work in a school dist. /BOCES as a school dist. leader while they complete their requireme
Issue Date, Action
05-22-19 Proposed
Agency I.D No. EDU-25-19-00014
Subject Matter: Eligibility Requirements for the Endorsement Pathway for Certification as an Educator in the Classroom Teaching Service
Purpose of Action:To provide candidates with more flexibility to be eligible for the endorsement pathway
Issue Date, Action
06-19-19 Emergency/Proposed
Agency I.D No. EDU-25-19-00015
Subject Matter: Statement of continued eligibility for certain teachers of students with disabilities
Purpose of Action:Extends the deadline to apply for a statement of continued eligibility for certain teachers of students with disabilities
Issue Date, Action
06-19-19 Emergency/Proposed
Agency I.D No. EDU-26-19-00001
Subject Matter: Reports of child abuse in an educational setting
Purpose of Action:To implement the provisions of Chapter 363 of the Laws of 2018 relating to reports of child abuse in an educational setting
Issue Date, Action
06-26-19 Proposed
Top
STATE BOARD OF ELECTIONS
Agency I.D No. SBE-07-19-00020
Subject Matter: Political Campaign Contribution Limits
Purpose of Action:Adjust contribution limits to reflect the consumer price index
Issue Date, Action
02-13-19 Emergency/Proposed
Issue Date, Action
05-22-19 Finalized
Agency I.D No. SBE-14-19-00005
Subject Matter: Pre-registering voters who are 16 and 17-years-old
Purpose of Action:To permit persons who are 16 or or 17-years-old to per-register to vote
Issue Date, Action
04-03-19 Proposed
Agency I.D No. SBE-14-19-00006
Subject Matter: Establishing a process for transferring a voter's registration and enrollment from one county to another
Purpose of Action:To establish a process where a voter who moves from one county to another can transfer their voter registration
Issue Date, Action
04-03-19 Emergency/Proposed
Agency I.D No. SBE-22-19-00001
Subject Matter: Audit Status for Early Voting
Purpose of Action:Establishes Process for Auditing Early Voting Machines and Systems
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. SBE-22-19-00002
Subject Matter: Related to the Minimum Required Voting Machines and Privacy Booths needed for Early Voting Polling Sites
Purpose of Action:Establishes the Minimum Required Voting Machines and Privacy Booths needed for Early Voting Polling Sites
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. SBE-22-19-00003
Subject Matter: Process for Early Voting
Purpose of Action:Establishing Process for Early Voting
Issue Date, Action
05-29-19 Emergency/Proposed
Top
DEPARTMENT OF ENVIRONMENTAL CONSERVATION
Agency I.D No. ENV-06-17-00001
Subject Matter: Amendments to 6 NYCRR Part 617 (which implement the State Environmental Quality Review Act [Article 8 of the ECL])
Purpose of Action:The purpose of the rule making is to streamline the SEQR process without sacrificing meaningful environmental review
Issue Date, Action
02-08-17 Proposed
Issue Date, Action
04-04-18 Revised
Issue Date, Action
07-18-18 Finalized
Agency I.D No. ENV-12-18-00043
Subject Matter: BEACH Act Standards and Reclassification Rule
Purpose of Action:To comply with the federal BEACH Act of 2000 (P.L. 106-284) and protect coastal recreation waters for recreation
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
02-27-19 Revised
Issue Date, Action
06-26-19 Finalized
Agency I.D No. ENV-20-18-00006
Subject Matter: CO2 Emissions Standards for Major Electric Generating Facilities
Purpose of Action:To establish CO2 emissions standards for existing major electric generating facilities
Issue Date, Action
05-16-18 Proposed
Issue Date, Action
05-29-19 Finalized
Agency I.D No. ENV-20-18-00007
Subject Matter: Repeal and replace 6 NYCRR Parts 243, 244 and 245 and amend 6 NYCRR Part 200
Purpose of Action:Parts 243, 244 and 245 set forth the process the Department will use to allocate allowances under EPA's CSAPR Trading Programs
Issue Date, Action
05-16-18 Proposed
Issue Date, Action
12-19-18 Finalized
Agency I.D No. ENV-48-18-00002
Subject Matter: Jonah crab management
Purpose of Action:To implement required management measures of the Atlantic States Marine Fisheries Commission Jonah Crab Fishery Management Plan
Issue Date, Action
11-28-18 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. ENV-49-18-00002
Subject Matter: Northern Catskill Riparian Areas
Purpose of Action:To correct a mistake in the description of the Kaaterskill Falls Riparian Area
Issue Date, Action
12-05-18 Proposed
Issue Date, Action
03-20-19 Finalized
Agency I.D No. ENV-02-19-00007
Subject Matter: Low emission vehicle greenhouse gas standards
Purpose of Action:Clarification of the deemed to comply provision
Issue Date, Action
01-09-19 Emergency/Proposed
Issue Date, Action
04-24-19 Finalized
Agency I.D No. ENV-07-19-00018
Subject Matter: Management of Striped Bass
Purpose of Action:To revise regulations concerning commercial striped bass fishing season
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. ENV-08-19-00004
Subject Matter: Governor Mario M. Cuomo Bridge
Purpose of Action:Replacing references to the Governor Malcolm Wilson Tappan Zee Bridge with references to the Governor Mario M. Cuomo Bridge
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. ENV-09-19-00015
Subject Matter: Set nitrogen oxide (NOx) emission rate limits for simple cycle and regenerative combustion turbines
Purpose of Action:Reduction of nitrogen oxide (NOx) emissions from simple cycle and regenerative combustion turbines
Issue Date, Action
02-27-19 Proposed
Agency I.D No. ENV-10-19-00003
Subject Matter: Regulate volatile organic compounds (VOCs) in architectural and industrial maintenance (AIM) coatings
Purpose of Action:To set new and lower VOC limits for certain coating categories. Update categories and methods
Issue Date, Action
03-06-19 Proposed
Agency I.D No. ENV-12-19-00002
Subject Matter: Air emissions regulation of cleaning solutions containing volatile organic compounds.
Purpose of Action:Update existing regulation with latest emission control requirements and add requirements recently issued by EPA.
Issue Date, Action
03-20-19 Proposed
Agency I.D No. ENV-12-19-00003
Subject Matter: Revised Part 208 will incorporate the new federal emission guideline for MSW landfills pursuant to 40 CFR Part 60, Subpart Cf.
Purpose of Action:Part 208 controls landfill gas emissions by requiring a gas collection and control system.
Issue Date, Action
03-20-19 Proposed
Agency I.D No. ENV-18-19-00006
Subject Matter: Regulations governing commercial fishing and harvest of scup.
Purpose of Action:To revise regulations concerning the commercial harvest of scup in New York State waters.
Issue Date, Action
05-01-19 Emergency/Proposed
Agency I.D No. ENV-24-19-00002
Subject Matter: Hazardous Waste Management Regulations (FedReg5)
Purpose of Action:To amend regulations pertaining to hazardous waste management
Issue Date, Action
06-12-19 Proposed
Top
Agency I.D No. DFS-17-16-00003
Subject Matter: Plan of Conversion by Commercial Travelers Mutual Insurance Company
Purpose of Action:To convert a mutual accident and health insurance company to a stock accident and health insurance company
Issue Date, Action
04-27-16 Proposed
Agency I.D No. DFS-52-17-00020
Subject Matter: Suitability in Life Insurance and Annuity Transactions
Purpose of Action:Establish suitability standards for life insurance and clarify that a transaction must be in the best interest of the consumer.
Issue Date, Action
12-27-17 Proposed
Issue Date, Action
05-16-18 Revised
Issue Date, Action
08-01-18 Finalized
Agency I.D No. DFS-23-18-00001
Subject Matter: Minimum Standards for Form, Content, and Sale of Health Insurance, Including Standards for Full and Fair Disclosure
Purpose of Action:To require coverage for maternal screening and referrals
Issue Date, Action
06-06-18 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. DFS-25-18-00006
Subject Matter: Plan of Conversion by Medical Liabilty Mutual Insurance Company
Purpose of Action:To convert a mutual property and casualty insurance company to a stock property and casualty insurance company
Issue Date, Action
06-20-18 Proposed
Agency I.D No. DFS-26-18-00002
Subject Matter: Charges for Professional Health Services
Purpose of Action:To delay the effective date of the Workers' Compensation fee schedule increases for no-fault reimbursement
Issue Date, Action
06-27-18 Emergency/Proposed
Issue Date, Action
02-20-19 Withdrawn
Agency I.D No. DFS-30-18-00007
Subject Matter: Minimum Standards for Form, Content, and Sale of Health Insurance, Including Standards for Full and Fair Disclosure
Purpose of Action:To clarify requirements regarding coverage and disclosure of information for contraceptives
Issue Date, Action
07-25-18 Proposed
Agency I.D No. DFS-36-18-00003
Subject Matter: Professional Bail Agents; Managing General Agents; et al
Purpose of Action:To provide greater protection to consumers, and raise the standards of integrity in the bail business.
Issue Date, Action
09-05-18 Proposed
Agency I.D No. DFS-42-18-00003
Subject Matter: Valuation of Life Insurance Reserves; Recognition of the 2001 CSO Mortality Table and the 2017 CSO Mortality Table, et al
Purpose of Action:To recognize mortality improvement for applicable policies issued prior to 1/1/2019 if optionally elected
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. DFS-43-18-00003
Subject Matter: Registration and Financial Responsibility Requirements for Mortgage Loan Servicers
Purpose of Action:To require that persons or entities which service mortgage loans on residential real property on or after July 1, 2009 be registered with the Superintendent of Financial Services (formerly the Superintendent of Banks)
Issue Date, Action
10-24-18 Emergency
Agency I.D No. DFS-44-18-00004
Subject Matter: The business conduct of mortgage loan servicers.
Purpose of Action:To implement the purpose and provisions of the Mortgage Lending Reform Law of 2008 with respect to mortgage loan servicers.
Issue Date, Action
10-31-18 Emergency
Agency I.D No. DFS-46-18-00014
Subject Matter: Regulations Implementing the Comprehensive Motor Vehicle Insurance Reparations Act-Claims for Personal Injury Protection Benefit
Purpose of Action:To give insurer option to void assignment of benefits when insurer issues denial for EIP's failure to attend IME or EUO
Issue Date, Action
11-14-18 Proposed
Agency I.D No. DFS-48-18-00001
Subject Matter: Assessment of entities regulated by the Banking Division of the Department of Financial Services
Purpose of Action:To implement Section 17 of the Banking Law and Section 206 of the Financial Services Law and sets forth the basis for allocating all costs and expenses attributable to the operation of the Banking Division of the Department of Financial Services
Issue Date, Action
11-28-18 Emergency
Agency I.D No. DFS-52-18-00001
Subject Matter: Principle-Based Reserving
Purpose of Action:To allow principal-based reserving for certain individual and group life insurance policies and annuity contracts
Issue Date, Action
12-26-18 Emergency/Proposed
Issue Date, Action
03-27-19 Emergency
Issue Date, Action
05-15-19 Finalized
Agency I.D No. DFS-02-19-00008
Subject Matter: Paid Family Leave Risk Adjustment Fund
Purpose of Action:Establishment of the Paid Family Leave Risk Adjustment Fund
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. DFS-04-19-00001
Subject Matter: Registration and Financial Responsibility Requirements for Mortgage Loan Servicers
Purpose of Action:To require that persons or entities which service mortgage loans on residential real property on of after July 1, 2009 be registered with the Superintendent of Financial Services
Issue Date, Action
01-23-19 Emergency
Agency I.D No. DFS-05-19-00003
Subject Matter: The business conduct of mortgage loan servicers.
Purpose of Action:To implement the purpose and provisions of the Mortgage Lending Reform Law of 2008 with respect to mortgage loan servicers.
Issue Date, Action
01-30-19 Emergency
Agency I.D No. DFS-08-19-00002
Subject Matter: Assessment of entities regulated by the Banking Division of the Department of Financial Services
Purpose of Action:To implement Section 17 of the Banking Law and Section 206 of the Financial Services Law and sets forth the basis for allocating all costs and expenses attributable to the operation of the Banking Division of the Department of Financial Services
Issue Date, Action
02-20-19 Emergency
Agency I.D No. DFS-08-19-00003
Subject Matter: Charges for Professional Health Services
Purpose of Action:To delay the effective date of the Workers' Compensation fee schedule increases for no-fault reimbursement
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
02-27-19 Emergency
Issue Date, Action
05-29-19 Emergency
Agency I.D No. DFS-16-19-00009
Subject Matter: Registration and Financial Responsibility Requirements for Mortgage Loan Servicers
Purpose of Action:To implement the registration requirement of chapter 472, Laws of 2008 and inform servicers of registration process details
Issue Date, Action
04-17-19 Emergency/Proposed
Agency I.D No. DFS-18-19-00003
Subject Matter: The business conduct of mortgage loan servicers.
Purpose of Action:To implement the purpose and provisions of the Mortgage Lending Reform Law of 2008 with respect to mortgage loan servicers.
Issue Date, Action
05-01-19 Emergency
Agency I.D No. DFS-18-19-00005
Subject Matter: Servicing Mortgage Loans: Business Conduct Rules
Purpose of Action:Sets standards governing the servicing of residential home mortgage loans.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. DFS-20-19-00002
Subject Matter: Electronic Filings and Submissions
Purpose of Action:To require certain filings or submissions to be made electronically
Issue Date, Action
05-15-19 Proposed
Agency I.D No. DFS-20-19-00004
Subject Matter: Valuation of Individual and Group Accident and Health Insurance Reserves
Purpose of Action:To adopt the 2016 Cancer Claim Cost Valuation Tables
Issue Date, Action
05-15-19 Proposed
Agency I.D No. DFS-20-19-00005
Subject Matter: SECURITY AT AUTOMATED TELLER FACILITIES
Purpose of Action:To update the regulation to ensure the removal of obsolete language from the reporting requirements under Part 301
Issue Date, Action
05-15-19 Proposed
Agency I.D No. DFS-21-19-00001
Subject Matter: Assessment of entities regulated by the Banking Division of the Department of Financial Services
Purpose of Action:See Attachment #8
Issue Date, Action
05-22-19 Emergency
Agency I.D No. DFS-21-19-00005
Subject Matter: Continuing Care Retirement Communities
Purpose of Action:Amend rules related to permitted investments, financial transactions, reporting requirements and add new optional contract type.
Issue Date, Action
05-22-19 Proposed
Top
Agency I.D No. SGC-09-18-00005
Subject Matter: The licensing and registration of gaming facility employees and vendors
Purpose of Action:To govern the licensing and registration of gaming facility employees and vendors
Issue Date, Action
02-28-18 Proposed
Issue Date, Action
01-16-19 Revised
Issue Date, Action
06-19-19 Expired
Agency I.D No. SGC-17-18-00002
Subject Matter: Regulation of courier services that purchase and claim certain Lottery tickets and prizes as agents for customers
Purpose of Action:To license courier services to facilitate the sale of Lottery tickets to generate more revenue for education
Issue Date, Action
04-25-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. SGC-38-18-00002
Subject Matter: Heads Up Hold 'Em poker.
Purpose of Action:To set forth the practices and procedures for the operation of Heads Up Hold 'Em poker as a casino table game.
Issue Date, Action
09-19-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. SGC-38-18-00003
Subject Matter: Casino fees and payments.
Purpose of Action:Implementation of rules governing procedures for submission of fees and payments by gaming facilities to the Gaming Commission.
Issue Date, Action
09-19-18 Proposed
Issue Date, Action
01-16-19 Revised
Issue Date, Action
04-10-19 Finalized
Agency I.D No. SGC-39-18-00003
Subject Matter: Heads Up Hold 'Em poker.
Purpose of Action:To set forth the practices and procedures for the operation of Heads Up Hold 'Em poker as a casino table game.
Issue Date, Action
09-26-18 Proposed
Agency I.D No. SGC-40-18-00006
Subject Matter: Amendment of multiple medication violation (MMV) penalty enhancement rule.
Purpose of Action:To enable the Commission to enhance the integrity and safety of thoroughbred pari-mutuel racing.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. SGC-42-18-00015
Subject Matter: Permit greater purse-to-price ratio in Thoroughbred claiming races
Purpose of Action:To advance the best interests of Thoroughbred racing and protect the safety of the race horses
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. SGC-47-18-00009
Subject Matter: Self-exclusion and casino advertising
Purpose of Action:To centralize Commission self-exclusion policies and make self-exclusion universal throughout the various forms of gaming
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. SGC-01-19-00002
Subject Matter: Treatment of thoroughbred horses with ultrasound or electro/medical equipment before a race
Purpose of Action:To enhance the safety and integrity of pari-mutuel racing
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. SGC-01-19-00017
Subject Matter: Safety helmet and vest requirements
Purpose of Action:To enhance the safety and integrity of pari-mutuel racing
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. SGC-01-19-00018
Subject Matter: Standards for backstretch housing and related facilities
Purpose of Action:To create minimum standards for housing and related facilities offered to backstretch workers by racing associations
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. SGC-12-19-00007
Subject Matter: Sports wagering at gaming facilities
Purpose of Action:To regulate and control sports wagering as directed by statute
Issue Date, Action
03-20-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. SGC-13-19-00023
Subject Matter: Cash 4 Life multi-jurisdiction lottery game
Purpose of Action:To provide for daily Cash 4 Life drawings to raise additional revenue for education
Issue Date, Action
03-27-19 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. SGC-17-19-00009
Subject Matter: Pick-six jackpot wager for Thoroughbred racing
Purpose of Action:To improve Thoroughbred pari-mutuel wagering and generate reasonable revenue for the support of government
Issue Date, Action
04-24-19 Proposed
Top
OFFICE OF GENERAL SERVICES
Agency I.D No. GNS-46-18-00001
Subject Matter: Service-Disabled Veteran-Owned Business Enterprises
Purpose of Action:To establish standards, procedures and criteria with respect to the Service-Disabled Veteran-Owned Business Enterprise program
Issue Date, Action
11-14-18 Proposed
Issue Date, Action
03-27-19 Finalized
Top
DEPARTMENT OF HEALTH
Agency I.D No. HLT-14-94-00006
Subject Matter: Payment methodology for HIV/AIDS outpatient services
Purpose of Action:To expand the current payment to incorporate pricing for services
Issue Date, Action
04-06-94 Proposed
Issue Date, Action
09-14-94 Continued
Agency I.D No. HLT-04-18-00010
Subject Matter: Emergency Medical Services (EMS) Initial Certification Eligibility Requirements
Purpose of Action:To reduce the EMS certification eligibility minimum age from 18 to 17 years of age
Issue Date, Action
01-24-18 Proposed
Issue Date, Action
10-17-18 Revised
Issue Date, Action
01-09-19 Finalized
Agency I.D No. HLT-07-18-00002
Subject Matter: Medicaid Reimbursement of Nursing Facility Reserved Bed Days for Hospitalizations
Purpose of Action:To make changes relating to reserved bed payments made by Medicaid to nursing facilities
Issue Date, Action
02-14-18 Proposed
Issue Date, Action
01-30-19 Revised
Issue Date, Action
05-29-19 Finalized
Agency I.D No. HLT-25-18-00008
Subject Matter: Inpatient Psychiatric Services
Purpose of Action:To enhance reimbursement mechanisms for inpatient psychiatric services
Issue Date, Action
06-20-18 Proposed
Issue Date, Action
01-30-19 Finalized
Agency I.D No. HLT-30-18-00008
Subject Matter: Voluntary Foster Care Agency Health Facility Licensure
Purpose of Action:To license Voluntary Foster Care Agencies to provide limited health-related services
Issue Date, Action
07-25-18 Proposed
Issue Date, Action
02-20-19 Finalized
Agency I.D No. HLT-31-18-00004
Subject Matter: Newborn Screening for Phenylketonuria and Other Diseases
Purpose of Action:To support timely collection and submission of specimens for the detection of diseases in newborn infants in New York State
Issue Date, Action
08-01-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. HLT-31-18-00005
Subject Matter: Medical Use of Marihuana
Purpose of Action:To add additional serious conditions for which patients may be certified to use medical marihuana
Issue Date, Action
08-01-18 Emergency/Proposed
Issue Date, Action
10-31-18 Emergency
Issue Date, Action
12-26-18 Emergency
Issue Date, Action
02-20-19 Emergency
Issue Date, Action
04-03-19 Revised
Issue Date, Action
04-24-19 Emergency
Issue Date, Action
06-19-19 Emergency
Agency I.D No. HLT-33-18-00017
Subject Matter: Patients' Bill of Rights
Purpose of Action:Require general hospitals and diagnostic and treatment centers to update their statements of patient rights.
Issue Date, Action
08-15-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. HLT-34-18-00006
Subject Matter: Statewide Planning and Research Cooperative System (SPARCS)
Purpose of Action:To revise the SPARCS regulation related to data intake.
Issue Date, Action
08-22-18 Proposed
Issue Date, Action
01-30-19 Finalized
Agency I.D No. HLT-34-18-00007
Subject Matter: New York State Medicaid Infertility Treatment
Purpose of Action:To authorize Medicaid coverage of infertility benefits.
Issue Date, Action
08-22-18 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. HLT-37-18-00008
Subject Matter: Update Standards for Adult Homes and Standards for Enriched Housing Programs
Purpose of Action:To prohibit residential providers from excluding an applicant based solely on the individual’s status as a wheelchair user.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
12-12-18 Emergency
Issue Date, Action
02-06-19 Emergency
Issue Date, Action
04-03-19 Emergency
Issue Date, Action
05-15-19 Finalized
Agency I.D No. HLT-42-18-00006
Subject Matter: Durable Medical Equipment; Medical/Surgical Supplies; Orthotic and Prosthetic Appliances; Orthopedic Footwear
Purpose of Action:To amend the Department’s regulation governing Medicaid coverage of orthopedic footwear and compression and support stockings
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. HLT-42-18-00007
Subject Matter: Stroke Services
Purpose of Action:NYS criteria for stroke ctr. designation as part of an accrediting process for cert. by nationally recognized accredit. agencies
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
03-20-19 Finalized
Agency I.D No. HLT-42-18-00008
Subject Matter: Office-Based Surgery Practice Reports
Purpose of Action:Requires accredited Office-Based Surgery practices to submit adverse event & practice information which includes procedural data
Issue Date, Action
10-17-18 Proposed
Agency I.D No. HLT-46-18-00015
Subject Matter: Controlled Substances
Purpose of Action:To reclassify cannabidiol (CBD) from a Schedule I controlled substance to a Schedule V controlled substance.
Issue Date, Action
11-14-18 Emergency
Agency I.D No. HLT-47-18-00002
Subject Matter: Food Service Establishments
Purpose of Action:To restrict the use of liquid Nitrogen and Dry Ice in food preparation
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
03-20-19 Finalized
Agency I.D No. HLT-51-18-00001
Subject Matter: HIV Uninsured Care Programs
Purpose of Action:To amend the HIV Uninsured Care Programs to align program eligibility elements with other health care access programs
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
04-24-19 Finalized
Agency I.D No. HLT-51-18-00015
Subject Matter: Hospital Policies for Human Trafficking Victims
Purpose of Action:To establish policies and procedures for the identification, assessment, treatment, and referral of human trafficking victims
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. HLT-51-18-00016
Subject Matter: Nursing Home Weekly Bed Census Survey
Purpose of Action:To require nursing homes to electronically submit weekly bed census data to the DOH through the Health Commerce System
Issue Date, Action
12-19-18 Proposed
Agency I.D No. HLT-51-18-00017
Subject Matter: Clinical Laboratory Directors
Purpose of Action:Recognize additional accrediting boards for qualification of clinical laboratory directors to obtain a cert. of qualification
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. HLT-51-18-00018
Subject Matter: New requirements for Annual Registration of Licensed Home Care Services Agencies
Purpose of Action:To amend the regulations for licensed home care services agencies for the annual registration requirements of the agency
Issue Date, Action
12-19-18 Proposed
Agency I.D No. HLT-05-19-00005
Subject Matter: Midwifery Birth Center Services
Purpose of Action:To set the standards for all birth centers to follow the structure of Article 28 requirements
Issue Date, Action
01-30-19 Proposed
Agency I.D No. HLT-07-19-00006
Subject Matter: Controlled Substances
Purpose of Action:To reclassify cannabidiol (CBD) from a Schedule I controlled substance to a Schedule V controlled substance
Issue Date, Action
02-13-19 Emergency/Proposed
Issue Date, Action
04-17-19 Emergency
Issue Date, Action
05-22-19 Finalized
Agency I.D No. HLT-09-19-00004
Subject Matter: Cardiac Catheterization Laboratory Centers
Purpose of Action:To amend existing Certificate of Need requirements for the approval and operation of Cardiac Catheterization Laboratory Centers.
Issue Date, Action
02-27-19 Proposed
Agency I.D No. HLT-10-19-00004
Subject Matter: Body Scanners in Local Correctional Facilities
Purpose of Action:Establish operational requirements for local correctional facs. that use body scanning imaging equipment for security purposes
Issue Date, Action
03-06-19 Emergency/Proposed
Issue Date, Action
06-05-19 Emergency
Agency I.D No. HLT-14-19-00001
Subject Matter: Managed Care Organizations (MCOs)
Purpose of Action:To amend contingent reserve requirements for MCOs
Issue Date, Action
04-03-19 Proposed
Agency I.D No. HLT-17-19-00002
Subject Matter: Medical Use of Marihuana
Purpose of Action:To clarify requirements for laboratories seeking approval to test medical marihuana products in New York State
Issue Date, Action
04-24-19 Emergency/Proposed
Agency I.D No. HLT-18-19-00016
Subject Matter: Blood Lead Level
Purpose of Action:To improve the current understanding of lead poisoning risks to children and pregnant women
Issue Date, Action
05-01-19 Proposed
Agency I.D No. HLT-20-19-00006
Subject Matter: Schroon Lake Water District
Purpose of Action:The regulation is no longer needed since Horseshoe Pond no longer serves as the public drinking water source
Issue Date, Action
05-15-19 Proposed
Agency I.D No. HLT-22-19-00015
Subject Matter: Residents’ Rights
Purpose of Action:Require nursing homes provide info. about home and community based services & comm. transition progs. to residents upon admission
Issue Date, Action
05-29-19 Proposed
Agency I.D No. HLT-25-19-00013
Subject Matter: Registered Nurses in the Emergency Department
Purpose of Action:To remove a barrier to new graduate nurse recruitment in the emergency department
Issue Date, Action
06-19-19 Proposed
Top
HIGHER EDUCATION SERVICES CORPORATION
Agency I.D No. ESC-46-18-00002
Subject Matter: New York State Science, Technology, Engineering and Mathematics Incentive Program.
Purpose of Action:To implement the New York State Science, Technology, Engineering and Mathematics Incentive Program.
Issue Date, Action
11-14-18 Emergency
Agency I.D No. ESC-46-18-00003
Subject Matter: The Enhanced Tuition Awards program.
Purpose of Action:To implement the Enhanced Tuition Awards program.
Issue Date, Action
11-14-18 Emergency
Agency I.D No. ESC-46-18-00004
Subject Matter: Excelsior Scholarship.
Purpose of Action:To implement the Excelsior Scholarship.
Issue Date, Action
11-14-18 Emergency
Agency I.D No. ESC-49-18-00003
Subject Matter: The New York State Achievement and Investment in Merit Scholarship (NY-AIMS).
Purpose of Action:To implement The New York State Achievement and Investment in Merit Scholarship (NY-AIMS).
Issue Date, Action
12-05-18 Emergency
Agency I.D No. ESC-49-18-00004
Subject Matter: New York State Get on Your Feet Loan Forgiveness Program.
Purpose of Action:To implement the New York State Get on Your Feet Loan Forgiveness Program.
Issue Date, Action
12-05-18 Emergency
Agency I.D No. ESC-49-18-00005
Subject Matter: The New York State Teacher Loan Forgiveness Program.
Purpose of Action:To implement The New York State Teacher Loan Forgiveness Program.
Issue Date, Action
12-05-18 Emergency
Agency I.D No. ESC-52-18-00002
Subject Matter: New York State Masters-in-Education Teacher Incentive Scholarship Program.
Purpose of Action:To implement the New York State Masters-in-Education Teacher Incentive Scholarship Program.
Issue Date, Action
12-26-18 Emergency
Agency I.D No. ESC-52-18-00003
Subject Matter: NYS Part-time Scholarship (PTS) Award Program.
Purpose of Action:To implement the NYS Part-time Scholarship (PTS) Award Program.
Issue Date, Action
12-26-18 Emergency
Agency I.D No. ESC-07-19-00001
Subject Matter: NYS Child Welfare Worker Incentive Scholarship Program.
Purpose of Action:To implement the NYS Child Welfare Worker Incentive Scholarship Program.
Issue Date, Action
02-13-19 Emergency
Agency I.D No. ESC-07-19-00002
Subject Matter: The Enhanced Tuition Awards program.
Purpose of Action:To implement the Enhanced Tuition Awards program.
Issue Date, Action
02-13-19 Emergency
Agency I.D No. ESC-07-19-00003
Subject Matter: Excelsior Scholarship.
Purpose of Action:To implement the Excelsior Scholarship.
Issue Date, Action
02-13-19 Emergency
Agency I.D No. ESC-07-19-00004
Subject Matter: NYS Child Welfare Worker Loan Forgiveness Incentive Program.
Purpose of Action:To implement the NYS Child Welfare Worker Loan Forgiveness Incentive Program.
Issue Date, Action
02-13-19 Emergency
Agency I.D No. ESC-07-19-00005
Subject Matter: New York State Science, Technology, Engineering and Mathematics Incentive Program.
Purpose of Action:To implement the New York State Science, Technology, Engineering and Mathematics Incentive Program.
Issue Date, Action
02-13-19 Emergency
Agency I.D No. ESC-09-19-00001
Subject Matter: The New York State Achievement and Investment in Merit Scholarship (NY-AIMS).
Purpose of Action:To implement The New York State Achievement and Investment in Merit Scholarship (NY-AIMS).
Issue Date, Action
02-27-19 Emergency
Agency I.D No. ESC-09-19-00002
Subject Matter: The New York State Teacher Loan Forgiveness Program.
Purpose of Action:To implement The New York State Teacher Loan Forgiveness Program.
Issue Date, Action
02-27-19 Emergency
Agency I.D No. ESC-09-19-00003
Subject Matter: New York State Get on Your Feet Loan Forgiveness Program.
Purpose of Action:To implement the New York State Get on Your Feet Loan Forgiveness Program.
Issue Date, Action
02-27-19 Emergency
Agency I.D No. ESC-13-19-00006
Subject Matter: NYS Part-time Scholarship (PTS) Award Program.
Purpose of Action:To implement the NYS Part-time Scholarship (PTS) Award Program.
Issue Date, Action
03-27-19 Emergency
Agency I.D No. ESC-13-19-00007
Subject Matter: New York State Masters-in-Education Teacher Incentive Scholarship Program.
Purpose of Action:To implement the New York State Masters-in-Education Teacher Incentive Scholarship Program.
Issue Date, Action
03-27-19 Emergency
Agency I.D No. ESC-19-19-00001
Subject Matter: New York State Science, Technology, Engineering and Mathematics Incentive Program
Purpose of Action:To implement the New York State Science, Technology, Engineering and Mathematics Incentive Program
Issue Date, Action
05-08-19 Emergency
Agency I.D No. ESC-19-19-00002
Subject Matter: NYS Child Welfare Worker Loan Forgiveness Incentive Program.
Purpose of Action:To implement the NYS Child Welfare Worker Loan Forgiveness Incentive Program.
Issue Date, Action
05-08-19 Emergency
Agency I.D No. ESC-19-19-00003
Subject Matter: NYS Child Welfare Worker Incentive Scholarship Program.
Purpose of Action:To implement the NYS Child Welfare Worker Incentive Scholarship Program.
Issue Date, Action
05-08-19 Emergency
Agency I.D No. ESC-19-19-00004
Subject Matter: The Enhanced Tuition Awards program
Purpose of Action:To implement the Enhanced Tuition Awards program
Issue Date, Action
05-08-19 Emergency
Agency I.D No. ESC-19-19-00005
Subject Matter: Excelsior Scholarship.
Purpose of Action:To implement the Excelsior Scholarship.
Issue Date, Action
05-08-19 Emergency
Agency I.D No. ESC-22-19-00004
Subject Matter: The New York State Teacher Loan Forgiveness Program
Purpose of Action:To implement The New York State Teacher Loan Forgiveness Program
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. ESC-22-19-00005
Subject Matter: New York State Masters-in-Education Teacher Incentive Scholarship Program
Purpose of Action:To implement the New York State Masters-in-Education Teacher Incentive Scholarship Program
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. ESC-22-19-00006
Subject Matter: New York State Get on Your Feet Loan Forgiveness Program
Purpose of Action:To implement the New York State Get on Your Feet Loan Forgiveness Program
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. ESC-22-19-00007
Subject Matter: NYS Part-time Scholarship (PTS) Award Program
Purpose of Action:To implement the NYS Part-time Scholarship (PTS) Award Program
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. ESC-22-19-00008
Subject Matter: The New York State Achievement and Investment in Merit Scholarship (NY-AIMS)
Purpose of Action:To implement The New York State Achievement and Investment in Merit Scholarship (NY-AIMS)
Issue Date, Action
05-29-19 Emergency/Proposed
Agency I.D No. ESC-25-19-00012
Subject Matter: Eligibility criteria for student financial aid award programs under article 14 of the Education Law
Purpose of Action:To implement the eligibility criteria for student financial aid award programs under article 14 of the Education Law
Issue Date, Action
06-19-19 Emergency/Proposed
Top
DIVISION OF HOUSING AND COMMUNITY RENEWAL
Agency I.D No. HCR-21-19-00019
Subject Matter: Low-Income Housing Qualified Allocation Plan
Purpose of Action:To amend definitions, threshold criteria and application scoring for the allocation o flow-income housing tax credits.
Issue Date, Action
05-22-19 Proposed
Top
HOUSING FINANCE AGENCY
Agency I.D No. HFA-21-19-00020
Subject Matter: Low-Income Housing Qualified Allocation Plan
Purpose of Action:To amend definitions, threshold criteria and application scoring for the allocation of low-income housing tax credits
Issue Date, Action
05-22-19 Proposed
Top
Agency I.D No. JPE-34-17-00003
Subject Matter: Comprehensive lobbying regulations
Purpose of Action:To set forth comprehensive lobbying regulations that implement the provisions of the Lobbying Act
Issue Date, Action
08-23-17 Proposed
Issue Date, Action
02-14-18 Revised
Issue Date, Action
05-09-18 Finalized
Agency I.D No. JPE-34-17-00004
Subject Matter: Source of funding reporting.
Purpose of Action:To make consistent with the new comprehensive lobbying regulations at Part 943 and clarify exemption procedures.
Issue Date, Action
08-23-17 Proposed
Issue Date, Action
05-09-18 Finalized
Top
STATE COMMISSION ON JUDICIAL CONDUCT
Agency I.D No. JDC-08-19-00006
Subject Matter: Counsel for witnesses at hearings
Purpose of Action:To codify the practice that a witness may have legal counsel present during a commission hearing
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
05-08-19 Finalized
Top
DEPARTMENT OF LABOR
Agency I.D No. LAB-47-17-00011
Subject Matter: Employee Scheduling (Call-In Pay)
Purpose of Action:To strengthen existing call-in pay protections involving employee scheduling
Issue Date, Action
11-22-17 Proposed
Issue Date, Action
12-12-18 Revised
Issue Date, Action
03-13-19 Expired
Agency I.D No. LAB-17-18-00005
Subject Matter: Hours Worked, 24-Hour Shifts
Purpose of Action:To clarify that hours worked may exclude meal periods and sleep times for employees who work shifts of 24 hours or more
Issue Date, Action
04-25-18 Proposed
Issue Date, Action
04-25-18 Emergency
Issue Date, Action
06-20-18 Emergency
Issue Date, Action
08-15-18 Emergency
Issue Date, Action
10-10-18 Emergency
Top
DEPARTMENT OF LAW
Agency I.D No. LAW-41-18-00021
Subject Matter: Arbitration program regulations for defective farm equipment
Purpose of Action:To set forth the procedures for the operation of an alternative arbitration mechanism for defective farm equipment disputes
Issue Date, Action
10-10-18 Proposed
Top
STATE LIQUOR AUTHORITY
Agency I.D No. LQR-07-18-00011
Subject Matter: Municipal notification requirements for Temporary Beer and Wine Permit as well as Catering Permit applications for large events
Purpose of Action:To establish municipal notification for Temporary Beer and Wine Permit as well as Catering Permit applications for large events
Issue Date, Action
02-14-18 Proposed
Issue Date, Action
05-08-19 Expired
Agency I.D No. LQR-02-19-00006
Subject Matter: Delinquent (C.O.D.) list procedures
Purpose of Action:To modernize outdated delinquent (C.O.D.) list procedures and provide for electronic notification for same
Issue Date, Action
01-09-19 Proposed
Top
LONG ISLAND POWER AUTHORITY
Agency I.D No. LPA-08-01-00003
Subject Matter: Pole attachments and related matters
Purpose of Action:To approve revisions to the authority's tariff
Issue Date, Action
02-21-01 Proposed
Agency I.D No. LPA-41-02-00005
Subject Matter: Tariff for electric service
Purpose of Action:To revise the tariff for electric service
Issue Date, Action
10-09-02 Proposed
Agency I.D No. LPA-04-06-00007
Subject Matter: Tariff for electric service
Purpose of Action:To adopt provisions of a ratepayer protection plan
Issue Date, Action
01-25-06 Proposed
Agency I.D No. LPA-03-10-00004
Subject Matter: Residential late payment charges
Purpose of Action:To extend the application of late payment charges to residential customers
Issue Date, Action
01-20-10 Proposed
Agency I.D No. LPA-15-18-00013
Subject Matter: Outdoor area lighting
Purpose of Action:To add an option and pricing for efficient LED lamps to the Authority's outdoor area lighting
Issue Date, Action
04-11-18 Proposed
Agency I.D No. LPA-33-18-00018
Subject Matter: The net energy metering and related provisions of the Authority's Tariff for Electric Service.
Purpose of Action:To conform the Tariff to orders issued in the Value of Distributed Energy Resources proceeding of the New York DPS.
Issue Date, Action
08-15-18 Proposed
Agency I.D No. LPA-37-18-00009
Subject Matter: The Authority's transmission and distribution property taxes as reflected in the Adjustments section of the Authority's Tariff.
Purpose of Action:To update the Tariff to implement an annual adjustment to recover payments in lieu of T&D property taxes.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00010
Subject Matter: The Authority's annual budget, as reflected in the rates and charges in the Tariff for Electric Service.
Purpose of Action:To update the Tariff to implement the Authority's annual budget and corresponding rate adjustments.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00011
Subject Matter: The terms and conditions of the Authority's Tariff for Electric Service regarding customer contacts by telephone.
Purpose of Action:To implement Federal Communications Commission guidance regarding customer contacts via mobile electronic devices.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00012
Subject Matter: The small generator interconnection procedures in the Authority's Tariff for Electric Service
Purpose of Action:To update the small generator interconnection procedures consistent with Public Service Commission guidance
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00013
Subject Matter: The net energy metering provisions of the Authority's Tariff for Electric Service
Purpose of Action:To implement PSC guidance increasing eligibility for value stack compensation to larger projects
Issue Date, Action
09-12-18 Proposed
Agency I.D No. LPA-37-18-00014
Subject Matter: The Authority's Tariff for Electric Service, Service Classification No. 7 Outdoor Area Lighting
Purpose of Action:To implement an option for high efficiency LED light bulbs and fixtures for Outdoor Area Lighting
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00015
Subject Matter: Uniform Business Practices for Distributed Energy Resource Suppliers in the Authority's Tariff for Electric Service.
Purpose of Action:To update the Tariff to implement Uniform Business Practices for Distributed Energy Resource Suppliers.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00016
Subject Matter: The metering provisions of the Authority's Tariff for Electric Service
Purpose of Action:To implement a customer option to decline installation of a smart meter and associated fees
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-16-19 Finalized
Agency I.D No. LPA-37-18-00017
Subject Matter: The treatment of electric vehicle charging in the Authority's Tariff for Electric Service.
Purpose of Action:To effectuate the outcome of the Public Service Commission's proceeding on electric vehicle supply equipment.
Issue Date, Action
09-12-18 Proposed
Agency I.D No. LPA-37-18-00018
Subject Matter: The treatment of energy storage in the Authority's Tariff for Electric Service.
Purpose of Action:To effectuate the outcome of the Public Service Commission's proceeding on the NY Energy Storage Roadmap.
Issue Date, Action
09-12-18 Proposed
Agency I.D No. LPA-09-19-00014
Subject Matter: The Commercial System Relief Program and Distribution Load Relief Program in the Authority's Tariff for Electric Service.
Purpose of Action:To update the Tariff to allow incentives for a behind-the-meter battery storage program from PSEG Long Island's Utility 2.0 Plan
Issue Date, Action
02-27-19 Proposed
Issue Date, Action
06-12-19 Finalized
Top
OFFICE OF MENTAL HEALTH
Agency I.D No. OMH-43-18-00001
Subject Matter: Operation of Crisis Residences in New York State
Purpose of Action:To revise and update the categories of Crisis Residences to match what is currently operation in New York
Issue Date, Action
10-24-18 Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. OMH-04-19-00002
Subject Matter: Expansion of Telemental Health (Telepsychiatry) services to additional OMH licensed settings and programs
Purpose of Action:To implement Public Health Law section 2999-dd and address current shortages in psychiatrists and nurse practitioners in psych.
Issue Date, Action
01-23-19 Proposed
Agency I.D No. OMH-08-19-00005
Subject Matter: Establish standards for providers who wish to become licensed Children's Mental Health Rehabilitation programs
Purpose of Action:The Children's Mental Health Rehabilitation Program (CMHRS) is a vehicle for implementing the new State Plan services
Issue Date, Action
02-20-19 Proposed
Top
METROPOLITAN TRANSPORTATION AUTHORITY
Agency I.D No. MTA-23-19-00006
Subject Matter: Debarment of contractors
Purpose of Action:To comply with Public Authorities Law, section 1279-h, which requires the MTA to establish a debarment process for contractors
Issue Date, Action
06-05-19 Emergency/Proposed
Top
DEPARTMENT OF MOTOR VEHICLES
Agency I.D No. MTV-42-18-00004
Subject Matter: FOIL - denials to access of records
Purpose of Action:To permit the Commissioner to designate another person to hear FOIL appeals other than the Chair of the Appeals Board
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. MTV-25-19-00011
Subject Matter: Alcohol & Drug Rehabilitation Programs - Restricted Use License eligibility provision
Purpose of Action:Conforms regulation with statute
Issue Date, Action
06-19-19 Proposed
Top
NIAGARA FALLS WATER BOARD
Agency I.D No. NFW-04-13-00004
Subject Matter: Adoption of Rates, Fees and Charges
Purpose of Action:To pay for the increased costs necessary to operate, maintain and manage the system, and to achieve covenants with bondholders
Issue Date, Action
01-23-13 Emergency/Proposed
Agency I.D No. NFW-13-14-00006
Subject Matter: Adoption of Rates, Fees and Charges
Purpose of Action:To pay for increased costs necessary to operate, maintain and manage the system and to achieve covenants with the bondholders
Issue Date, Action
04-02-14 Emergency/Proposed
Agency I.D No. NFW-01-19-00019
Subject Matter: Adoption of Rates, Fees, and Charges
Purpose of Action:To pay for increased costs necessary to operate, maintain, and manage the system, and to meet covenants with the bondholders
Issue Date, Action
01-02-19 Emergency/Proposed
Top
NIAGARA FRONTIER TRANSPORTATION AUTHORITY
Agency I.D No. NFT-01-19-00001
Subject Matter: Procurement Guidelines of the Niagara Frontier Transportation Authority and Niagara Frontier Transit Metro System, Inc.
Purpose of Action:To amend Procurement Guidelines to reflect changes in law, clarifying provisions and change in signing authority level
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. NFT-18-19-00004
Subject Matter: Procurement Guidelines of the Niagara Frontier Transportation Authority and Niagara Frontier Transit Metro System, Inc.
Purpose of Action:To amend Procurement Guidelines to reflect changes in law, clarifying provisions and change in signing authority.
Issue Date, Action
05-01-19 Proposed
Top
OGDENSBURG BRIDGE AND PORT AUTHORITY
Agency I.D No. OBA-33-18-00019
Subject Matter: Increase in Bridge Toll Structure
Purpose of Action:To increase bridge toll revenue in order to become financially self-supporting. Our bridge operations are resulting in deficit.
Issue Date, Action
08-15-18 Proposed
Agency I.D No. OBA-07-19-00019
Subject Matter: Increase in Bridge Toll Structure
Purpose of Action:To increase bridge toll revenue in order to become financially self-supporting. Our bridge operations are resulting in deficit
Issue Date, Action
02-13-19 Proposed
Top
OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION
Agency I.D No. PKR-48-18-00006
Subject Matter: The regulation of pets in OPRHP facilities
Purpose of Action:To adopt one statewide pet regulation that replaces regional regulations that are inconsistent with each other
Issue Date, Action
11-28-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PKR-07-19-00007
Subject Matter: Ice Fishing in Shaver Pond, Grafton Lake State Park, Saratoga Capital Region
Purpose of Action:To remove the prohibition on ice fishing in Shaver Pond at Grafton Lakes State Park
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
05-08-19 Finalized
Top
Agency I.D No. PDD-07-18-00001
Subject Matter: Enrollment in Medicare Prescription Drug Plans and Fully Integrated Duals Advantage Plans for IDD
Purpose of Action:To allow individuals to be enrolled in a FIDA-IDD plan when individuals are unable to enroll themselves
Issue Date, Action
02-14-18 Emergency/Proposed
Issue Date, Action
05-09-18 Emergency
Issue Date, Action
07-11-18 Emergency/Revised
Issue Date, Action
09-05-18 Emergency
Issue Date, Action
03-06-19 Expired
Agency I.D No. PDD-45-18-00001
Subject Matter: Telehealth
Purpose of Action:To authorize telehealth as a new modality for the delivery of clinical services
Issue Date, Action
11-07-18 Emergency/Proposed
Issue Date, Action
01-30-19 Withdrawn
Agency I.D No. PDD-11-19-00001
Subject Matter: Home and Community Based Services
Purpose of Action:Establishes a regulatory framework for delivery and support of HCBS in a way that encourages and supports the service recipient
Issue Date, Action
03-13-19 Proposed
Issue Date, Action
05-29-19 Finalized
Agency I.D No. PDD-13-19-00008
Subject Matter: Enrollment in Medicare Prescription Drug Plans and Fully Integrated Duals Advantage Plans for IDD
Purpose of Action:To allow individuals to be enrolled in a FIDA-IDD plan when individuals are unable to enroll themselves
Issue Date, Action
03-27-19 Emergency/Proposed
Issue Date, Action
06-26-19 Finalized
Agency I.D No. PDD-18-19-00002
Subject Matter: Transportation of female patients at OPWDD facilities
Purpose of Action:Repeal as statutory language has been revised and on longer is reflective in this regulation
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PDD-20-19-00007
Subject Matter: Site Based Prevocational Services
Purpose of Action:To make technical corrections
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PDD-22-19-00010
Subject Matter: Person Centered Planning: Care Management and Home and Community Based Services
Purpose of Action:To ensure consistency with person-centered planning regulations
Issue Date, Action
05-29-19 Proposed
Agency I.D No. PDD-23-19-00002
Subject Matter: Enrollment in Medicare Prescription Drug Plans and Fully Integrated Duals Advantage Plans for IDD
Purpose of Action:To allow individuals to be enrolled in a FIDA-IDD plan when individuals are unable to enroll themselves
Issue Date, Action
06-05-19 Emergency/Proposed
Top
POWER AUTHORITY OF THE STATE OF NEW YORK
Agency I.D No. PAS-01-10-00010
Subject Matter: Rates for the sale of power and energy
Purpose of Action:Update ECSB Programs customers' service tariffs to streamline them/include additional required information
Issue Date, Action
01-06-10 Proposed
Agency I.D No. PAS-42-18-00005
Subject Matter: Rates for the Sale of Power and Energy
Purpose of Action:To align rates and costs
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
02-20-19 Finalized
Top
PUBLIC SERVICE COMMISSION
Agency I.D No. PSC-09-99-00012
Subject Matter: Transfer of books and records by Citizens Utilities Company
Purpose of Action:To relocate Ogden Telephone Company's books and records out-of-state
Issue Date, Action
03-03-99 Proposed
Agency I.D No. PSC-15-99-00011
Subject Matter: Electronic tariff by Woodcliff Park Corp.
Purpose of Action:To replace the company's current tariff with an electronic tariff
Issue Date, Action
04-14-99 Proposed
Agency I.D No. PSC-12-00-00001
Subject Matter: Winter bundled sales service election date by Central Hudson Gas & Electric Corporation
Purpose of Action:To revise the date
Issue Date, Action
03-22-00 Proposed
Agency I.D No. PSC-44-01-00005
Subject Matter: Annual reconciliation of gas costs by Corning Natural Gas Corporation
Purpose of Action:To authorize the company to include certain gas costs
Issue Date, Action
10-31-01 Proposed
Agency I.D No. PSC-07-02-00032
Subject Matter: Uniform business practices
Purpose of Action:To consider modification
Issue Date, Action
02-13-02 Proposed
Agency I.D No. PSC-36-03-00010
Subject Matter: Performance assurance plan by Verizon New York
Purpose of Action:To consider changes
Issue Date, Action
09-10-03 Proposed
Agency I.D No. PSC-40-03-00015
Subject Matter: Receipt of payment of bills by St. Lawrence Gas Company
Purpose of Action:To revise the process
Issue Date, Action
10-08-03 Proposed
Agency I.D No. PSC-41-03-00010
Subject Matter: Annual reconciliation of gas expenses and gas cost recoveries
Purpose of Action:To consider filings of various LDCs and municipalities
Issue Date, Action
10-15-03 Proposed
Agency I.D No. PSC-41-03-00011
Subject Matter: Annual reconciliation of gas expenses and gas cost recoveries
Purpose of Action:To consider filings of various LDCs and municipalities
Issue Date, Action
10-15-03 Proposed
Agency I.D No. PSC-44-03-00009
Subject Matter: Retail access data between jurisdictional utilities
Purpose of Action:To accommodate changes in retail access market structure or commission mandates
Issue Date, Action
11-05-03 Proposed
Agency I.D No. PSC-02-04-00008
Subject Matter: Delivery rates for Con Edison's customers in New York City and Westchester County by the City of New York
Purpose of Action:To rehear the Nov. 25, 2003 order
Issue Date, Action
01-14-04 Proposed
Agency I.D No. PSC-06-04-00009
Subject Matter: Transfer of ownership interest by SCS Energy LLC and AE Investors LLC
Purpose of Action:To transfer interest in Steinway Creek Electric Generating Company LLC to AE Investors LLC
Issue Date, Action
02-11-04 Proposed
Agency I.D No. PSC-10-04-00005
Subject Matter: Temporary protective order
Purpose of Action:To consider adopting a protective order
Issue Date, Action
03-10-04 Proposed
Agency I.D No. PSC-10-04-00008
Subject Matter: Interconnection agreement between Verizon New York Inc. and VIC-RMTS-DC, L.L.C. d/b/a Verizon Avenue
Purpose of Action:To amend the agreement
Issue Date, Action
03-10-04 Proposed
Agency I.D No. PSC-14-04-00008
Subject Matter: Submetering of natural gas service to industrial and commercial customers by Hamburg Fairgrounds
Purpose of Action:To submeter gas service to commercial customers located at the Buffalo Speedway
Issue Date, Action
04-07-04 Proposed
Agency I.D No. PSC-15-04-00022
Subject Matter: Submetering of electricity by Glenn Gardens Associates, L.P.
Purpose of Action:To permit submetering at 175 W. 87th St., New York, NY
Issue Date, Action
04-14-04 Proposed
Agency I.D No. PSC-21-04-00013
Subject Matter: Verizon performance assurance plan by Metropolitan Telecommunications
Purpose of Action:To clarify the appropriate performance level
Issue Date, Action
05-26-04 Proposed
Agency I.D No. PSC-22-04-00010
Subject Matter: Approval of new types of electricity meters by Powell Power Electric Company
Purpose of Action:To permit the use of the PE-1250 electronic meter
Issue Date, Action
06-02-04 Proposed
Agency I.D No. PSC-22-04-00013
Subject Matter: Major gas rate increase by Consolidated Edison Company of New York, Inc.
Purpose of Action:To increase annual gas revenues
Issue Date, Action
06-02-04 Proposed
Agency I.D No. PSC-22-04-00016
Subject Matter: Master metering of water by South Liberty Corporation
Purpose of Action:To waive the requirement for installation of separate water meters
Issue Date, Action
06-02-04 Proposed
Agency I.D No. PSC-25-04-00012
Subject Matter: Interconnection agreement between Frontier Communications of Ausable Valley, Inc., et al. and Sprint Communications Company, L.P.
Purpose of Action:To amend the agreement
Issue Date, Action
06-23-04 Proposed
Agency I.D No. PSC-27-04-00008
Subject Matter: Interconnection agreement between Verizon New York Inc. and various Verizon wireless affiliates
Purpose of Action:To amend the agreement
Issue Date, Action
07-07-04 Proposed
Agency I.D No. PSC-27-04-00009
Subject Matter: Interconnection agreement between Verizon New York Inc. and various Verizon wireless affiliates
Purpose of Action:To amend the agreement
Issue Date, Action
07-07-04 Proposed
Agency I.D No. PSC-28-04-00006
Subject Matter: Approval of loans by Dunkirk & Fredonia Telephone Company and Cassadaga Telephone Corporation
Purpose of Action:To authorize participation in the parent corporation's line of credit
Issue Date, Action
07-14-04 Proposed
Agency I.D No. PSC-31-04-00023
Subject Matter: Distributed generation service by Consolidated Edison Company of New York, Inc.
Purpose of Action:To provide an application form
Issue Date, Action
08-04-04 Proposed
Agency I.D No. PSC-34-04-00031
Subject Matter: Flat rate residential service by Emerald Green Lake Louise Marie Water Company, Inc.
Purpose of Action:To set appropriate level of permanent rates
Issue Date, Action
08-25-04 Proposed
Agency I.D No. PSC-35-04-00017
Subject Matter: Application form for distributed generation by Orange and Rockland Utilities, Inc.
Purpose of Action:To establish a new supplementary application form for customers
Issue Date, Action
09-01-04 Proposed
Agency I.D No. PSC-43-04-00016
Subject Matter: Accounts recievable by Rochester Gas and Electric Corporation
Purpose of Action:To include in its tariff provisions for the purchase of ESCO accounts recievable
Issue Date, Action
10-27-04 Proposed
Agency I.D No. PSC-46-04-00012
Subject Matter: Service application form by Consolidated Edison Company of New York, Inc.
Purpose of Action:To revise the form and make housekeeping changes
Issue Date, Action
11-17-04 Proposed
Agency I.D No. PSC-46-04-00013
Subject Matter: Rules and guidelines governing installation of metering equipment
Purpose of Action:To establish uniform statewide business practices
Issue Date, Action
11-17-04 Proposed
Agency I.D No. PSC-02-05-00006
Subject Matter: Violation of the July 22, 2004 order by Dutchess Estates Water Company, Inc.
Purpose of Action:To consider imposing remedial actions against the company and its owners, officers and directors
Issue Date, Action
01-12-05 Proposed
Agency I.D No. PSC-09-05-00009
Subject Matter: Submetering of natural gas service by Hamlet on Olde Oyster Bay
Purpose of Action:To consider submetering of natural gas to a commercial customer
Issue Date, Action
03-02-05 Proposed
Agency I.D No. PSC-14-05-00006
Subject Matter: Request for deferred accounting authorization by Freeport Electric Inc.
Purpose of Action:To defer expenses beyond the end of the fiscal year
Issue Date, Action
04-06-05 Proposed
Agency I.D No. PSC-18-05-00009
Subject Matter: Marketer Assignment Program by Consolidated Edison Company of New York, Inc.
Purpose of Action:To implement the program
Issue Date, Action
05-04-05 Proposed
Agency I.D No. PSC-20-05-00028
Subject Matter: Delivery point aggregation fee by Allied Frozen Storage, Inc.
Purpose of Action:To review the calculation of the fee
Issue Date, Action
05-18-05 Proposed
Agency I.D No. PSC-25-05-00011
Subject Matter: Metering, balancing and cashout provisions by Central Hudson Gas & Electric Corporation
Purpose of Action:To establish provisions for gas customers taking service under Service Classification Nos. 8, 9 and 11
Issue Date, Action
06-22-05 Proposed
Agency I.D No. PSC-27-05-00018
Subject Matter: Annual reconciliation of gas costs by New York State Electric & Gas Corporation
Purpose of Action:To consider the manner in which the gas cost incentive mechanism has been applied
Issue Date, Action
07-06-05 Proposed
Agency I.D No. PSC-41-05-00013
Subject Matter: Annual reconciliation of gas expenses and gas cost recoveries by local distribution companies and municipalities
Purpose of Action:To consider the filings
Issue Date, Action
10-12-05 Proposed
Agency I.D No. PSC-45-05-00011
Subject Matter: Treatment of lost and unaccounted gas costs by Corning Natural Gas Corporation
Purpose of Action:To defer certain costs
Issue Date, Action
11-09-05 Proposed
Agency I.D No. PSC-46-05-00015
Subject Matter: Sale of real and personal property by the Brooklyn Union Gas Company d/b/a KeySpan Energy Delivery New York and Steel Arrow, LLC
Purpose of Action:To consider the sale
Issue Date, Action
11-16-05 Proposed
Agency I.D No. PSC-47-05-00009
Subject Matter: Transferral of gas supplies by Corning Natural Gas Corporation
Purpose of Action:To approve the transfer
Issue Date, Action
11-23-05 Proposed
Agency I.D No. PSC-50-05-00008
Subject Matter: Long-term debt by Saratoga Glen Hollow Water Supply Corp.
Purpose of Action:To obtain long-term debt
Issue Date, Action
12-14-05 Proposed
Agency I.D No. PSC-04-06-00024
Subject Matter: Transfer of ownership interests by Mirant NY-Gen LLC and Orange and Rockland Utilities, Inc.
Purpose of Action:To approve of the transfer
Issue Date, Action
01-25-06 Proposed
Agency I.D No. PSC-06-06-00015
Subject Matter: Gas curtailment policies and procedures
Purpose of Action:To examine the manner and extent to which gas curtailment policies and procedures should be modified and/or established
Issue Date, Action
02-08-06 Proposed
Agency I.D No. PSC-07-06-00009
Subject Matter: Modification of the current Environmental Disclosure Program
Purpose of Action:To include an attributes accounting system
Issue Date, Action
02-15-06 Proposed
Agency I.D No. PSC-22-06-00019
Subject Matter: Hourly pricing by National Grid
Purpose of Action:To assess the impacts
Issue Date, Action
05-31-06 Proposed
Agency I.D No. PSC-22-06-00020
Subject Matter: Hourly pricing by New York State Electric & Gas Corporation
Purpose of Action:To assess the impacts
Issue Date, Action
05-31-06 Proposed
Agency I.D No. PSC-22-06-00021
Subject Matter: Hourly pricing by Rochester Gas & Electric Corporation
Purpose of Action:To assess the impacts
Issue Date, Action
05-31-06 Proposed
Agency I.D No. PSC-22-06-00022
Subject Matter: Hourly pricing by Consolidated Edison Company of New York, Inc.
Purpose of Action:To assess the impacts
Issue Date, Action
05-31-06 Proposed
Agency I.D No. PSC-22-06-00023
Subject Matter: Hourly pricing by Orange and Rockland Utilities, Inc.
Purpose of Action:To assess the impacts
Issue Date, Action
05-31-06 Proposed
Agency I.D No. PSC-24-06-00005
Subject Matter: Supplemental home energy assistance benefits
Purpose of Action:To extend the deadline to Central Hudson's low-income customers
Issue Date, Action
06-14-06 Emergency/Proposed
Agency I.D No. PSC-25-06-00017
Subject Matter: Purchased power adjustment by Massena Electric Department
Purpose of Action:To revise the method of calculating the purchased power adjustment and update the factor of adjustment
Issue Date, Action
06-21-06 Proposed
Agency I.D No. PSC-34-06-00009
Subject Matter: Inter-carrier telephone service quality standards and metrics by the Carrier Working Group
Purpose of Action:To incorporate appropriate modifications
Issue Date, Action
08-23-06 Proposed
Agency I.D No. PSC-37-06-00015
Subject Matter: Procedures for estimation of customer bills by Rochester Gas and Electric Corporation
Purpose of Action:To consider estimation procedures
Issue Date, Action
09-13-06 Proposed
Agency I.D No. PSC-37-06-00017
Subject Matter: Procedures for estimation of customer bills by Rochester Gas and Electric Corporation
Purpose of Action:To consider estimation procedures
Issue Date, Action
09-13-06 Proposed
Agency I.D No. PSC-43-06-00014
Subject Matter: Electric delivery services by Strategic Power Management, Inc.
Purpose of Action:To determine the proper mechanism for the rate-recovery of costs
Issue Date, Action
10-25-06 Proposed
Agency I.D No. PSC-04-07-00012
Subject Matter: Petition for rehearing by Orange and Rockland Utilities, Inc.
Purpose of Action:To clarify the order
Issue Date, Action
01-24-07 Proposed
Agency I.D No. PSC-06-07-00015
Subject Matter: Meter reading and billing practices by Central Hudson Gas & Electric Corporation
Purpose of Action:To continue current meter reading and billing practices for electric service
Issue Date, Action
02-07-07 Proposed
Agency I.D No. PSC-06-07-00020
Subject Matter: Meter reading and billing practices by Central Hudson Gas & Electric Corporation
Purpose of Action:To continue current meter reading and billing practices for gas service
Issue Date, Action
02-07-07 Proposed
Agency I.D No. PSC-11-07-00010
Subject Matter: Investigation of the electric power outages by the Consolidated Edison Company of New York, Inc.
Purpose of Action:To implement the recommendations in the staff's investigation
Issue Date, Action
03-14-07 Proposed
Agency I.D No. PSC-11-07-00011
Subject Matter: Storm-related power outages by Consolidated Edison Company of New York, Inc.
Purpose of Action:To modify the company's response to power outages, the timing for any such changes and other related matters
Issue Date, Action
03-14-07 Proposed
Agency I.D No. PSC-17-07-00008
Subject Matter: Interconnection agreement between Verizon New York Inc. and BridgeCom International, Inc.
Purpose of Action:To amend the agreement
Issue Date, Action
04-25-07 Proposed
Agency I.D No. PSC-18-07-00010
Subject Matter: Existing electric generating stations by Independent Power Producers of New York, Inc.
Purpose of Action:To repower and upgrade existing electric generating stations owned by Rochester Gas and Electric Corporation
Issue Date, Action
05-02-07 Proposed
Agency I.D No. PSC-20-07-00016
Subject Matter: Tariff revisions and making rates permanent by New York State Electric & Gas Corporation
Purpose of Action:To seek rehearing
Issue Date, Action
05-16-07 Proposed
Agency I.D No. PSC-21-07-00007
Subject Matter: Natural Gas Supply and Acquisition Plan by Corning Natural Gas Corporation
Purpose of Action:To revise the rates, charges, rules and regulations for gas service
Issue Date, Action
05-23-07 Proposed
Agency I.D No. PSC-22-07-00015
Subject Matter: Demand Side Management Program by Consolidated Edison Company of New York, Inc.
Purpose of Action:To recover incremental program costs and lost revenue
Issue Date, Action
05-30-07 Proposed
Agency I.D No. PSC-23-07-00022
Subject Matter: Supplier, transportation, balancing and aggregation service by National Fuel Gas Distribution Corporation
Purpose of Action:To explicitly state in the company's tariff that the threshold level of elective upstream transmission capacity is a maximum of 112,600 Dth/day of marketer-provided upstream capacity
Issue Date, Action
06-06-07 Proposed
Agency I.D No. PSC-24-07-00012
Subject Matter: Gas Efficiency Program by the City of New York
Purpose of Action:To consider rehearing a decision establishing a Gas Efficiency Program
Issue Date, Action
06-13-07 Proposed
Agency I.D No. PSC-39-07-00017
Subject Matter: Gas bill issuance charge by New York State Electric & Gas Corporation
Purpose of Action:To create a gas bill issuance charge unbundled from delivery rates
Issue Date, Action
09-26-07 Proposed
Agency I.D No. PSC-41-07-00009
Subject Matter: Submetering of electricity rehearing
Purpose of Action:To seek reversal
Issue Date, Action
10-10-07 Proposed
Agency I.D No. PSC-42-07-00012
Subject Matter: Energy efficiency program by Orange and Rockland Utilities, Inc.
Purpose of Action:To consider any energy efficiency program for Orange and Rockland Utilities, Inc.'s electric service
Issue Date, Action
10-17-07 Proposed
Agency I.D No. PSC-42-07-00013
Subject Matter: Revenue decoupling by Orange and Rockland Utilities, Inc.
Purpose of Action:To consider a revenue decoupling mechanism for Orange and Rockland Utilities, Inc.
Issue Date, Action
10-17-07 Proposed
Agency I.D No. PSC-45-07-00005
Subject Matter: Customer incentive programs by Orange and Rockland Utilities, Inc.
Purpose of Action:To establish a tariff provision
Issue Date, Action
11-07-07 Proposed
Agency I.D No. PSC-02-08-00006
Subject Matter: Additional central office codes in the 315 area code region
Purpose of Action:To consider options for making additional codes
Issue Date, Action
01-09-08 Proposed
Agency I.D No. PSC-03-08-00006
Subject Matter: Rehearing of the accounting determinations
Purpose of Action:To grant or deny a petition for rehearing of the accounting determinations
Issue Date, Action
01-16-08 Proposed
Agency I.D No. PSC-04-08-00010
Subject Matter: Granting of easement rights on utility property by Central Hudson Gas & Electric Corporation
Purpose of Action:To grant easement rights to Millennium Pipeline Company, L.L.C.
Issue Date, Action
01-23-08 Proposed
Agency I.D No. PSC-04-08-00012
Subject Matter: Marketing practices of energy service companies by the Consumer Protection Board and New York City Department of Consumer Affairs
Purpose of Action:To consider modifying the commission's regulation over marketing practices of energy service companies
Issue Date, Action
01-23-08 Proposed
Agency I.D No. PSC-08-08-00016
Subject Matter: Transfer of ownership by Entergy Nuclear Fitzpatrick LLC, et al.
Purpose of Action:To consider the transfer
Issue Date, Action
02-20-08 Proposed
Agency I.D No. PSC-12-08-00019
Subject Matter: Extend the provisions of the existing electric rate plan by Rochester Gas and Electric Corporation
Purpose of Action:To consider the request
Issue Date, Action
03-19-08 Proposed
Agency I.D No. PSC-12-08-00021
Subject Matter: Extend the provisions of the existing gas rate plan by Rochester Gas and Electric Corporation
Purpose of Action:To consider the request
Issue Date, Action
03-19-08 Proposed
Agency I.D No. PSC-13-08-00011
Subject Matter: Waiver of commission policy and NYSEG tariff by Turner Engineering, PC
Purpose of Action:To grant or deny Turner's petition
Issue Date, Action
03-26-08 Proposed
Agency I.D No. PSC-13-08-00012
Subject Matter: Voltage drops by New York State Electric & Gas Corporation
Purpose of Action:To grant or deny the petition
Issue Date, Action
03-26-08 Proposed
Agency I.D No. PSC-23-08-00008
Subject Matter: Petition requesting rehearing and clarification of the commission's April 25, 2008 order denying petition of public utility law project
Purpose of Action:To consider whether to grant or deny, in whole or in part, the May 7, 2008 Public Utility Law Project (PULP) petition for rehearing and clarification of the commission's April 25, 2008 order denying petition of Public Utility Law Project
Issue Date, Action
06-04-08 Proposed
Agency I.D No. PSC-25-08-00007
Subject Matter: Policies and procedures regarding the selection of regulatory proposals to meet reliability needs
Purpose of Action:To establish policies and procedures regarding the selection of regulatory proposals to meet reliability needs
Issue Date, Action
06-18-08 Proposed
Agency I.D No. PSC-25-08-00008
Subject Matter: Report on Callable Load Opportunities
Purpose of Action:Rider U report assessing callable load opportunities in New York City and Westchester County during the next 10 years
Issue Date, Action
06-18-08 Proposed
Agency I.D No. PSC-28-08-00004
Subject Matter: Con Edison's procedure for providing customers access to their account information
Purpose of Action:To consider Con Edison's implementation plan and timetable for providing customers access to their account information
Issue Date, Action
07-09-08 Proposed
Agency I.D No. PSC-31-08-00025
Subject Matter: Recovery of reasonable DRS costs from the cost mitigation reserve (CMR)
Purpose of Action:To authorize recovery of the DRS costs from the CMR
Issue Date, Action
07-30-08 Proposed
Agency I.D No. PSC-32-08-00009
Subject Matter: The ESCO referral program for KEDNY to be implemented by October 1, 2008
Purpose of Action:To approve, reject or modify, in whole or in part, KEDNY's recommended ESCO referral program
Issue Date, Action
08-06-08 Proposed
Agency I.D No. PSC-33-08-00008
Subject Matter: Noble Allegany's request for lightened regulation
Purpose of Action:To consider Noble Allegany's request for lightened regulation as an electric corporation
Issue Date, Action
08-13-08 Proposed
Agency I.D No. PSC-36-08-00019
Subject Matter: Land Transfer in the Borough of Manhattan, New York
Purpose of Action:To consider petition for transfer of real property to NYPH
Issue Date, Action
09-03-08 Proposed
Agency I.D No. PSC-39-08-00010
Subject Matter: RG&E's economic development plan and tariffs
Purpose of Action:Consideration of the approval of RG&E's economic development plan and tariffs
Issue Date, Action
09-24-08 Proposed
Agency I.D No. PSC-40-08-00010
Subject Matter: Loans from regulated company to its parent
Purpose of Action:To determine if the cash management program resulting in loans to the parent should be approved
Issue Date, Action
10-01-08 Proposed
Agency I.D No. PSC-41-08-00009
Subject Matter: Transfer of control of cable TV franchise
Purpose of Action:To determine if the transfer of control of Margaretville's cable TV subsidiary should be approved
Issue Date, Action
10-08-08 Proposed
Agency I.D No. PSC-43-08-00014
Subject Matter: Annual Reconcilliation of Gas Expenses and Gas Cost Recoveries
Purpose of Action:The filings of various LDCs and municipalities regarding their Annual Reconciliation of Gas Expenses and Gas Cost Recoveries
Issue Date, Action
10-22-08 Proposed
Agency I.D No. PSC-46-08-00008
Subject Matter: Property transfer in the Village of Avon, New York
Purpose of Action:To consider a petition for the transfer of street lighting and attached equipment to the Village of Avon, New York
Issue Date, Action
11-12-08 Proposed
Agency I.D No. PSC-46-08-00010
Subject Matter: A transfer of indirect ownership interests in nuclear generation facilities
Purpose of Action:Consideration of approval of a transfer of indirect ownership interests in nuclear generation facilities
Issue Date, Action
11-12-08 Proposed
Agency I.D No. PSC-46-08-00014
Subject Matter: The attachment of cellular antennae to an electric transmission tower
Purpose of Action:To approve, reject or modify the request for permission to attach cellular antennae to an electric transmission tower
Issue Date, Action
11-12-08 Proposed
Agency I.D No. PSC-48-08-00005
Subject Matter: A National Grid high efficiency gas heating equipment rebate program
Purpose of Action:To expand eligibility to customers converting from oil to natural gas
Issue Date, Action
11-26-08 Proposed
Agency I.D No. PSC-48-08-00008
Subject Matter: Petition for the master metering and submetering of electricity
Purpose of Action:To consider the request of Bay City Metering, to master meter & submeter electricity at 345 E. 81st St., New York, New York
Issue Date, Action
11-26-08 Proposed
Agency I.D No. PSC-48-08-00009
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of PCV/ST to submeter electricity at Peter Cooper Village & Stuyvesant Town, New York, New York
Issue Date, Action
11-26-08 Proposed
Agency I.D No. PSC-50-08-00018
Subject Matter: Market Supply Charge
Purpose of Action:A study on the implementation of a revised Market Supply Charge
Issue Date, Action
12-10-08 Proposed
Agency I.D No. PSC-51-08-00006
Subject Matter: Commission's October 27, 2008 Order on Future of Retail Access Programs in Case 07-M-0458
Purpose of Action:To consider a Petition for rehearing of the Commission's October 27, 2008 Order in Case 07-M-0458
Issue Date, Action
12-17-08 Proposed
Agency I.D No. PSC-51-08-00007
Subject Matter: Commission's October 27, 2008 Order in Cases 98-M-1343, 07-M-1514 and 08-G-0078
Purpose of Action:To consider Petitions for rehearing of the Commission's October 27, 2008 Order in Cases 98-M-1343, 07-M-1514 and 08-G-0078
Issue Date, Action
12-17-08 Proposed
Agency I.D No. PSC-53-08-00011
Subject Matter: Use of deferred Rural Telephone Bank funds
Purpose of Action:To determine if the purchase of a softswitch by Hancock is an appropriate use of deferred Rural Telephone Bank funds
Issue Date, Action
12-31-08 Proposed
Agency I.D No. PSC-53-08-00012
Subject Matter: Transfer of permanent and temporary easements at 549-555 North Little Tor Road, New City, NY
Purpose of Action:Transfer of permanent and temporary easements at 549-555 North Little Tor Road, New City, NY
Issue Date, Action
12-31-08 Proposed
Agency I.D No. PSC-53-08-00013
Subject Matter: To transfer common stock and ownership
Purpose of Action:To consider transfer of common stock and ownership
Issue Date, Action
12-31-08 Proposed
Agency I.D No. PSC-01-09-00015
Subject Matter: FCC decision to redefine service area of Citizens/Frontier
Purpose of Action:Review and consider FCC proposed redefinition of Citizens/Frontier service area
Issue Date, Action
01-07-09 Proposed
Agency I.D No. PSC-02-09-00010
Subject Matter: Competitive classification of independent local exchange company, and regulatory relief appropriate thereto
Purpose of Action:To determine if Chazy & Westport Telephone Corporation more appropriately belongs in scenario 1 rather than scenario 2
Issue Date, Action
01-14-09 Proposed
Agency I.D No. PSC-05-09-00008
Subject Matter: Revenue allocation, rate design, performance metrics, and other non-revenue requirement issues
Purpose of Action:To consider any remaining non-revenue requirement issues related to the Company's May 9, 2008 tariff filing
Issue Date, Action
02-04-09 Proposed
Agency I.D No. PSC-05-09-00009
Subject Matter: Numerous decisions involving the steam system including cost allocation, energy efficiency and capital projects
Purpose of Action:To consider the long term impacts on steam rates and on public policy of various options concerning the steam system
Issue Date, Action
02-04-09 Proposed
Agency I.D No. PSC-06-09-00007
Subject Matter: Interconnection of the networks between Frontier Comm. and WVT Communications for local exchange service and exchange access
Purpose of Action:To review the terms and conditions of the negotiated agreement between Frontier Comm. and WVT Comm.
Issue Date, Action
02-11-09 Proposed
Agency I.D No. PSC-07-09-00015
Subject Matter: Transfer certain utility assets located in the Town of Montgomery from plant held for future use to non-utility property
Purpose of Action:To consider the request to transfer certain utility assets located in the Town of Montgomery to non-utility assets
Issue Date, Action
02-18-09 Proposed
Agency I.D No. PSC-07-09-00017
Subject Matter: Request for authorization to defer the incremental costs incurred in the restoration work resulting from the ice storm
Purpose of Action:To allow the company to defer the incremental costs incurred in the restoration work resulting from the ice storm
Issue Date, Action
02-18-09 Proposed
Agency I.D No. PSC-07-09-00018
Subject Matter: Whether to permit the submetering of natural gas service to an industrial and commercial customer at Cooper Union, New York, NY
Purpose of Action:To consider the request of Cooper Union, to submeter natural gas at 41 Cooper Square, New York, New York
Issue Date, Action
02-18-09 Proposed
Agency I.D No. PSC-12-09-00010
Subject Matter: Charges for commodity
Purpose of Action:To charge customers for commodity costs
Issue Date, Action
03-25-09 Proposed
Agency I.D No. PSC-12-09-00012
Subject Matter: Charges for commodity
Purpose of Action:To charge customers for commodity costs
Issue Date, Action
03-25-09 Proposed
Agency I.D No. PSC-13-09-00008
Subject Matter: Options for making additional central office codes available in the 718/347 numbering plan area
Purpose of Action:To consider options for making additional central office codes available in the 718/347 numbering plan area
Issue Date, Action
04-01-09 Proposed
Agency I.D No. PSC-14-09-00014
Subject Matter: The regulation of revenue requirements for municipal utilities by the Public Service Commission
Purpose of Action:To determine whether the regulation of revenue requirements for municipal utilities should be modified
Issue Date, Action
04-08-09 Proposed
Agency I.D No. PSC-16-09-00010
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of AMPS on behalf of Park Imperial to submeter electricity at 230 W. 56th Street, in New York, New York
Issue Date, Action
04-22-09 Proposed
Agency I.D No. PSC-16-09-00020
Subject Matter: Whether SUNY's core accounts should be exempt from the mandatory assignment of local distribution company (LDC) capacity
Purpose of Action:Whether SUNY's core accounts should be exempt from the mandatory assignment of local distribution company (LDC) capacity
Issue Date, Action
04-22-09 Proposed
Agency I.D No. PSC-17-09-00010
Subject Matter: Whether to permit the use of Elster REX2 solid state electric meter for use in residential and commerical accounts
Purpose of Action:To permit electric utilities in New York State to use the Elster REX2
Issue Date, Action
04-29-09 Proposed
Agency I.D No. PSC-17-09-00011
Subject Matter: Whether Brooklyn Navy Yard Cogeneration Partners, L.P. should be reimbursed by Con Edison for past and future use taxes
Purpose of Action:Whether Brooklyn Navy Yard Cogeneration Partners, L.P. should be reimbursed by Con Edison for past and future use taxes
Issue Date, Action
04-29-09 Proposed
Agency I.D No. PSC-17-09-00012
Subject Matter: Petition for the submetering of gas at commercial property
Purpose of Action:To consider the request of Turner Construction, to submeter natural gas at 550 Short Ave., & 10 South St., Governors Island, NY
Issue Date, Action
04-29-09 Proposed
Agency I.D No. PSC-17-09-00014
Subject Matter: Benefit-cost framework for evaluating AMI programs prepared by the DPS Staff
Purpose of Action:To consider a benefit-cost framework for evaluating AMI programs prepared by the DPS Staff
Issue Date, Action
04-29-09 Proposed
Agency I.D No. PSC-17-09-00015
Subject Matter: The construction of a tower for wireless antennas on land owned by National Grid
Purpose of Action:To approve, reject or modify the petition to build a tower for wireless antennas in the Town of Onondaga
Issue Date, Action
04-29-09 Proposed
Agency I.D No. PSC-18-09-00012
Subject Matter: Petition for rehearing of Order approving the submetering of electricity
Purpose of Action:To consider the request of Frank Signore to rehear petition to submeter electricity at One City Place in White Plains, New York
Issue Date, Action
05-06-09 Proposed
Agency I.D No. PSC-18-09-00013
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of Living Opportunities of DePaul to submeter electricity at E. Main St. located in Batavia, New York
Issue Date, Action
05-06-09 Proposed
Agency I.D No. PSC-18-09-00017
Subject Matter: Approval of an arrangement for attachment of wireless antennas to the utility's transmission facilities in the City of Yonkers
Purpose of Action:To approve, reject or modify the petition for the existing wireless antenna attachment to the utility's transmission tower
Issue Date, Action
05-06-09 Proposed
Agency I.D No. PSC-20-09-00016
Subject Matter: The recovery of, and accounting for, costs associated with the Companies' advanced metering infrastructure (AMI) pilots etc
Purpose of Action:To consider a filing of the Companies as to the recovery of, and accounting for, costs associated with it's AMI pilots etc
Issue Date, Action
05-20-09 Proposed
Agency I.D No. PSC-20-09-00017
Subject Matter: The recovery of, and accounting for, costs associated with CHG&E's AMI pilot program
Purpose of Action:To consider a filing of CHG&E as to the recovery of, and accounting for, costs associated with it's AMI pilot program
Issue Date, Action
05-20-09 Proposed
Agency I.D No. PSC-22-09-00011
Subject Matter: Cost allocation for Consolidated Edison's East River Repowering Project
Purpose of Action:To determine whether any changes are warranted in the cost allocation of Consolidated Edison's East River Repowering Project
Issue Date, Action
06-03-09 Proposed
Agency I.D No. PSC-25-09-00005
Subject Matter: Whether to grant, deny, or modify, in whole or in part, the petition
Purpose of Action:Whether to grant, deny, or modify, in whole or in part, the petition
Issue Date, Action
06-24-09 Proposed
Agency I.D No. PSC-25-09-00006
Subject Matter: Electric utility implementation plans for proposed web based SIR application process and project status database
Purpose of Action:To determine if the proposed web based SIR systems are adequate and meet requirements needed for implementation
Issue Date, Action
06-24-09 Proposed
Agency I.D No. PSC-25-09-00007
Subject Matter: Electric rates for Consolidated Edison Company of New York, Inc
Purpose of Action:Consider a Petition for Rehearing filed by Consolidated Edison Company of New York, Inc
Issue Date, Action
06-24-09 Proposed
Agency I.D No. PSC-27-09-00011
Subject Matter: Interconnection of the networks between Vernon and tw telecom of new york I.p. for local exchange service and exchange access.
Purpose of Action:To review the terms and conditions of the negotiated agreement between Vernon and tw telecom of new york I.p.
Issue Date, Action
07-08-09 Proposed
Agency I.D No. PSC-27-09-00014
Subject Matter: Billing and payment for energy efficiency measures through utility bill
Purpose of Action:To promote energy conservation
Issue Date, Action
07-08-09 Proposed
Agency I.D No. PSC-27-09-00015
Subject Matter: Interconnection of the networks between Oriskany and tw telecom of new york l.p. for local exchange service and exchange access
Purpose of Action:To review the terms and conditions of the negotiated agreement between Oriskany and tw telecom of new york l.p
Issue Date, Action
07-08-09 Proposed
Agency I.D No. PSC-29-09-00011
Subject Matter: Consideration of utility compliance filings
Purpose of Action:Consideration of utility compliance filings
Issue Date, Action
07-22-09 Proposed
Agency I.D No. PSC-32-09-00009
Subject Matter: Cost allocation for Consolidated Edison's East River Repowering Project
Purpose of Action:To determine whether any changes are warranted in the cost allocation of Consolidated Edison's East River Repowering Project
Issue Date, Action
08-12-09 Proposed
Agency I.D No. PSC-34-09-00016
Subject Matter: Recommendations made in the Management Audit Final Report
Purpose of Action:To consider whether to take action or recommendations contained in the Management Audit Final Report
Issue Date, Action
08-26-09 Proposed
Agency I.D No. PSC-34-09-00017
Subject Matter: To consider the transfer of control of Plattsburgh Cablevision, Inc. d/b/a Charter Communications to CH Communications, LLC
Purpose of Action:To allow the Plattsburgh Cablevision, Inc. to distribute its equity interest in CH Communications, LLC
Issue Date, Action
08-26-09 Proposed
Agency I.D No. PSC-36-09-00008
Subject Matter: The increase in the non-bypassable charge implemented by RG&E on June 1, 2009
Purpose of Action:Considering exemptions from the increase in the non-bypassable charge implemented by RG&E on June 1, 2009
Issue Date, Action
09-09-09 Proposed
Agency I.D No. PSC-37-09-00015
Subject Matter: Sale of customer-generated steam to the Con Edison steam system
Purpose of Action:To establish a mechanism for sale of customer-generated steam to the Con Edison steam system
Issue Date, Action
09-16-09 Proposed
Agency I.D No. PSC-37-09-00016
Subject Matter: Applicability of electronic signatures to Deferred Payment Agreements
Purpose of Action:To determine whether electronic signatures can be accepted for Deferred Payment Agreements
Issue Date, Action
09-16-09 Proposed
Agency I.D No. PSC-39-09-00015
Subject Matter: Modifications to the $5 Bill Credit Program
Purpose of Action:Consideration of petition of National Grid to modify the Low Income $5 Bill Credit Program
Issue Date, Action
09-30-09 Proposed
Agency I.D No. PSC-39-09-00018
Subject Matter: The offset of deferral balances with Positive Benefit Adjustments
Purpose of Action:To consider a petition to offset deferral balances with Positive Benefit Adjustments
Issue Date, Action
09-30-09 Proposed
Agency I.D No. PSC-40-09-00013
Subject Matter: Uniform System of Accounts - request for deferral and amortization of costs
Purpose of Action:To consider a petition to defer and amortize costs
Issue Date, Action
10-07-09 Proposed
Agency I.D No. PSC-51-09-00029
Subject Matter: Rules and guidelines for the exchange of retail access data between jurisdictional utilities and eligible ESCOs
Purpose of Action:To revise the uniform Electronic Data Interchange Standards and business practices to incorporate a contest period
Issue Date, Action
12-23-09 Proposed
Agency I.D No. PSC-51-09-00030
Subject Matter: Waiver or modification of Capital Expenditure condition of merger
Purpose of Action:To allow the companies to expend less funds for capital improvement than required by the merger
Issue Date, Action
12-23-09 Proposed
Agency I.D No. PSC-52-09-00006
Subject Matter: ACE's petition for rehearing for an order regarding generator-specific energy deliverability study methodology
Purpose of Action:To consider whether to change the Order Prescribing Study Methodology
Issue Date, Action
12-30-09 Proposed
Agency I.D No. PSC-52-09-00008
Subject Matter: Approval for the New York Independent System Operator, Inc. to incur indebtedness and borrow up to $50,000,000
Purpose of Action:To finance the renovation and construction of the New York Independent System Operator, Inc.'s power control center facilities
Issue Date, Action
12-30-09 Proposed
Agency I.D No. PSC-05-10-00008
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of University Residences - Rochester, LLC to submeter electricity at 220 John Street, Henrietta, NY
Issue Date, Action
02-03-10 Proposed
Agency I.D No. PSC-05-10-00015
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 243 West End Avenue Owners Corp. to submeter electricity at 243 West End Avenue, New York, NY
Issue Date, Action
02-03-10 Proposed
Agency I.D No. PSC-06-10-00022
Subject Matter: The Commission's Order of December 17, 2009 related to redevelopment of Consolidated Edison's Hudson Avenue generating facility
Purpose of Action:To reconsider the Commission's Order of December 17, 2009 related to redevelopment of the Hudson Avenue generating facility
Issue Date, Action
02-10-10 Proposed
Agency I.D No. PSC-07-10-00009
Subject Matter: Petition to revise the Uniform Business Practices
Purpose of Action:To consider the RESA petition to allow rescission of a customer request to return to full utility service
Issue Date, Action
02-17-10 Proposed
Agency I.D No. PSC-08-10-00007
Subject Matter: Whether to grant, deny, or modify, in whole or in part, the rehearing petition filed in Case 06-E-0847
Purpose of Action:Whether to grant, deny, or modify, in whole or in part, the rehearing petition filed in Case 06-E-0847
Issue Date, Action
02-24-10 Proposed
Agency I.D No. PSC-08-10-00009
Subject Matter: Consolidated Edison of New York, Inc. energy efficiency programs
Purpose of Action:To modify approved energy efficiency programs
Issue Date, Action
02-24-10 Proposed
Agency I.D No. PSC-12-10-00015
Subject Matter: Recommendations made by Staff intended to enhance the safety of Con Edison's gas operations
Purpose of Action:To require that Con Edison implement the Staff recommendations intended to enhance the safety of Con Edison's gas operations
Issue Date, Action
03-24-10 Proposed
Agency I.D No. PSC-14-10-00010
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 61 Jane Street Owners Corporation to submeter Electricity at 61 Jane Street, Manhattan, NY
Issue Date, Action
04-07-10 Proposed
Agency I.D No. PSC-16-10-00005
Subject Matter: To consider adopting and expanding mobile stray voltage testing requirements
Purpose of Action:Adopt additional mobile stray voltage testing requirements
Issue Date, Action
04-21-10 Proposed
Agency I.D No. PSC-16-10-00007
Subject Matter: Interconnection of the networks between TDS Telecom and PAETEC Communications for local exchange service and exchange access
Purpose of Action:To review the terms and conditions of the negotiated agreement between TDS Telecom and PAETEC Communications
Issue Date, Action
04-21-10 Proposed
Agency I.D No. PSC-16-10-00015
Subject Matter: Interconnection of the networks between Frontier and Choice One Communications for local exchange service and exchange access
Purpose of Action:To review the terms and conditions of the negotiated agreement between Frontier and Choice One Communications
Issue Date, Action
04-21-10 Proposed
Agency I.D No. PSC-18-10-00009
Subject Matter: Electric utility transmission right-of-way management practices
Purpose of Action:To consider electric utility transmission right-of-way management practices
Issue Date, Action
05-05-10 Proposed
Agency I.D No. PSC-19-10-00022
Subject Matter: Whether National Grid should be permitted to transfer a parcel of property located at 1 Eddy Street, Fort Edward, New York
Purpose of Action:To decide whether to approve National Grid's request to transfer a parcel of vacant property in Fort Edward, New York
Issue Date, Action
05-12-10 Proposed
Agency I.D No. PSC-22-10-00006
Subject Matter: Requirement that Noble demonstrate that its affiliated electric corporations operating in New York are providing safe service
Purpose of Action:Consider requiring that Noble demonstrate that its affiliated electric corporations in New York are providing safe service
Issue Date, Action
06-02-10 Proposed
Agency I.D No. PSC-22-10-00008
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 48-52 Franklin Street to submeter electricity at 50 Franklin Street, New York, New York
Issue Date, Action
06-02-10 Proposed
Agency I.D No. PSC-24-10-00009
Subject Matter: Verizon New York Inc. tariff regulations relating to voice messaging service
Purpose of Action:To remove tariff regulations relating to retail voice messaging service from Verizon New York Inc.'s tariff
Issue Date, Action
06-16-10 Proposed
Agency I.D No. PSC-25-10-00012
Subject Matter: Reassignment of the 2-1-1 abbreviated dialing code
Purpose of Action:Consideration of petition to reassign the 2-1-1 abbreviated dialing code
Issue Date, Action
06-23-10 Proposed
Agency I.D No. PSC-27-10-00016
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 9271 Group, LLC to submeter electricity at 960 Busti Avenue, Buffalo, New York
Issue Date, Action
07-07-10 Proposed
Agency I.D No. PSC-34-10-00003
Subject Matter: The modification of Central Hudson Gas & Electric Corporation's Enhanced Powerful Opportunities Program
Purpose of Action:The modification of Central Hudson Gas & Electric Corporation's Enhanced Powerful Opportunities Program
Issue Date, Action
08-25-10 Proposed
Agency I.D No. PSC-34-10-00005
Subject Matter: Approval of a contract for $250,000 in tank repairs that may be a financing
Purpose of Action:To decide whether to approve a contract between the parties that may be a financing of $250,000 for tank repairs
Issue Date, Action
08-25-10 Proposed
Agency I.D No. PSC-34-10-00006
Subject Matter: The modification of Central Hudson Gas & Electric Corporation's Enhanced Powerful Opportunities Program
Purpose of Action:The modification of Central Hudson Gas & Electric Corporation's Enhanced Powerful Opportunities Program
Issue Date, Action
08-25-10 Proposed
Agency I.D No. PSC-36-10-00010
Subject Matter: Central Hudson's procedures, terms and conditions for an economic development plan
Purpose of Action:Consideration of Central Hudson's procedures, terms and conditions for an economic development plan
Issue Date, Action
09-08-10 Proposed
Agency I.D No. PSC-40-10-00014
Subject Matter: Disposition of a state sales tax refund
Purpose of Action:To determine how much of a state sales tax refund should be retained by National Grid
Issue Date, Action
10-06-10 Proposed
Agency I.D No. PSC-40-10-00021
Subject Matter: Whether to permit the submetering of natural gas service to a commercial customer at Quaker Crossing Mall
Purpose of Action:To permit the submetering of natural gas service to a commercial customer at Quaker Crossing Mall
Issue Date, Action
10-06-10 Proposed
Agency I.D No. PSC-41-10-00018
Subject Matter: Amount of hourly interval data provided to Hourly Pricing customers who have not installed a phone line to read meter
Purpose of Action:Allow Central Hudson to provide less than a years worth of interval data and charge for manual meter reading for some customers
Issue Date, Action
10-13-10 Proposed
Agency I.D No. PSC-41-10-00022
Subject Matter: Request for waiver of the individual living unit metering requirements at 5742 Route 5, Vernon, NY
Purpose of Action:Request for waiver of the individual living unit metering requirements at 5742 Route 5, Vernon, NY
Issue Date, Action
10-13-10 Proposed
Agency I.D No. PSC-42-10-00011
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 4858 Group, LLC to submeter electricity at 456 Main Street, Buffalo, New York
Issue Date, Action
10-20-10 Proposed
Agency I.D No. PSC-43-10-00016
Subject Matter: Utility Access to Ducts, Conduit Facilities and Utility Poles
Purpose of Action:To review the complaint from Optical Communications Group
Issue Date, Action
10-27-10 Proposed
Agency I.D No. PSC-44-10-00003
Subject Matter: Third and fourth stage gas rate increase by Corning Natural Gas Corporation
Purpose of Action:To consider Corning Natural Gas Corporation's request for a third and fourth stage gas rate increase
Issue Date, Action
11-03-10 Proposed
Agency I.D No. PSC-51-10-00018
Subject Matter: Commission proceeding concerning three-phase electric service by all major electric utilities
Purpose of Action:Investigate the consistency of the tariff provisions for three-phase electric service for all major electric utilities
Issue Date, Action
12-22-10 Proposed
Agency I.D No. PSC-11-11-00003
Subject Matter: The proposed transfer of 55.42 acres of land and $1.4 million of revenues derived from the rendition of public service
Purpose of Action:The proposed transfer of 55.42 acres of land and $1.4 million of revenues derived from the rendition of public service
Issue Date, Action
03-16-11 Proposed
Agency I.D No. PSC-13-11-00005
Subject Matter: Exclude the minimum monthly bill component from the earnings test calculation
Purpose of Action:Exclude the minimum monthly bill component from the earnings test calculation
Issue Date, Action
03-30-11 Proposed
Agency I.D No. PSC-14-11-00009
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of 83-30 118th Street to submeter electricity at 83-30 118th Street, Kew Gardens, New York
Issue Date, Action
04-06-11 Proposed
Agency I.D No. PSC-19-11-00007
Subject Matter: Utility price reporting requirements related to the Commission's "Power to Choose" website
Purpose of Action:Modify the Commission's utility electric commodity price reporting requirements related to the "Power to Choose" website
Issue Date, Action
05-11-11 Proposed
Agency I.D No. PSC-20-11-00012
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of KMW Group LLC to submeter electricity at 122 West Street, Brooklyn, New York
Issue Date, Action
05-18-11 Proposed
Agency I.D No. PSC-20-11-00013
Subject Matter: Determining the reasonableness of Niagara Mohawk Power Corporation d/b/a National Grid 's make ready charges
Purpose of Action:To determine if the make ready charges of Niagara Mohawk Power Corporation d/b/a National Grid are reasonable
Issue Date, Action
05-18-11 Proposed
Agency I.D No. PSC-22-11-00004
Subject Matter: Whether to permit the use of the Sensus accWAVE for use in residential gas meter applications
Purpose of Action:To permit gas utilities in New York State to use the Sensus accWAVE diaphragm gas meter
Issue Date, Action
06-01-11 Proposed
Agency I.D No. PSC-26-11-00007
Subject Matter: Water rates and charges
Purpose of Action:To approve an increase in annual revenues by about $25,266 or 50%
Issue Date, Action
06-29-11 Proposed
Agency I.D No. PSC-26-11-00009
Subject Matter: Petition for the submetering of electricity at commercial property
Purpose of Action:To consider the request of by Hoosick River Hardwoods, LLC to submeter electricity at 28 Taylor Avenue, in Berlin, New York
Issue Date, Action
06-29-11 Proposed
Agency I.D No. PSC-26-11-00012
Subject Matter: Waiver of generation retirement notice requirements
Purpose of Action:Consideration of waiver of generation retirement notice requirements
Issue Date, Action
06-29-11 Proposed
Agency I.D No. PSC-29-11-00011
Subject Matter: Petition requesting the Commssion reconsider its May 19, 2011 Order and conduct a hearing, and petition to stay said Order.
Purpose of Action:To consider whether to grant or deny, in whole or in part, Windstream New York's Petition For Reconsideration and Rehearing.
Issue Date, Action
07-20-11 Proposed
Agency I.D No. PSC-34-11-00005
Subject Matter: Approval for Hudson Transmission Partners, LLC to incur indebtedness and borrow up to $750,000,000
Purpose of Action:To finance the construction of Hudson Transmission Partners, LLC's electric transmission facility
Issue Date, Action
08-24-11 Emergency/Adopted
Agency I.D No. PSC-35-11-00011
Subject Matter: Whether to permit Consolidated Edison a waiver to commission regulations Part 226.8
Purpose of Action:Permit Consolidated Edison to conduct a inspection program in lieu of testing the accuracy of Category C meters
Issue Date, Action
08-31-11 Proposed
Agency I.D No. PSC-36-11-00006
Subject Matter: To consider expanding mobile stray voltage testing requirements
Purpose of Action:Adopt additional mobile stray voltage testing requirements
Issue Date, Action
09-07-11 Proposed
Agency I.D No. PSC-38-11-00002
Subject Matter: Operation and maintenance procedures pertaining to steam trap caps
Purpose of Action:Adopt modified steam operation and maintenance procedures
Issue Date, Action
09-21-11 Proposed
Agency I.D No. PSC-38-11-00003
Subject Matter: Waiver of certain provisions of the electric service tariffs of Con Edison
Purpose of Action:Consideration of waiver of certain provisions of the electric service tariffs of Con Edison
Issue Date, Action
09-21-11 Proposed
Agency I.D No. PSC-40-11-00010
Subject Matter: Participation of regulated local exchange carriers in the New York Data Exchange, Inc. (NYDE)
Purpose of Action:Whether to partially modify its order requiring regulated local exchange carriers' participation NYDE
Issue Date, Action
10-05-11 Proposed
Agency I.D No. PSC-40-11-00012
Subject Matter: Granting of transfer of plant in-service to a regulatory asset
Purpose of Action:To approve transfer and recovery of unamortized plant investment
Issue Date, Action
10-05-11 Proposed
Agency I.D No. PSC-41-11-00002
Subject Matter: Approval for National Grid's Emergency Economic Development Programs to provide immediate assistance to qualifying customers.
Purpose of Action:To approve National Grid's Emergency Economic Development Programs to provide immediate assistance to qualifying customers.
Issue Date, Action
10-12-11 Emergency/Adopted
Agency I.D No. PSC-42-11-00018
Subject Matter: Availability of telecommunications services in New York State at just and reasonable rates
Purpose of Action:Providing funding support to help ensure availability of affordable telecommunications service throughout New York
Issue Date, Action
10-19-11 Proposed
Agency I.D No. PSC-43-11-00012
Subject Matter: Transfer of outstanding shares of stock
Purpose of Action:Transfer the issued outstanding shares of stock of The Meadows at Hyde Park Water-Works Corporation to HPWS, LLC
Issue Date, Action
10-26-11 Proposed
Agency I.D No. PSC-44-11-00018
Subject Matter: The New York State Energy Research and Development Authority's proposal for an Agricultural Disaster Energy Efficiency Program.
Purpose of Action:To assist farms damaged by Hurricane Irene and Tropical Storm Lee and to promote gas and electricity conservation in New York.
Issue Date, Action
11-02-11 Emergency/Adopted
Agency I.D No. PSC-45-11-00002
Subject Matter: Approval for NYSEG's Emergency Economic Development Programs to provide immediate assistance to qualifying customers.
Purpose of Action:To approve NYSEG's Emergency Economic Development Programs to provide immediate assistance to qualifying customers.
Issue Date, Action
11-09-11 Emergency/Adopted
Agency I.D No. PSC-47-11-00007
Subject Matter: Remedying miscalculations of delivered gas as between two customer classes
Purpose of Action:Consideration of Con Edison's proposal to address inter-class delivery imbalances resulting from past Company miscalculations
Issue Date, Action
11-23-11 Proposed
Agency I.D No. PSC-48-11-00007
Subject Matter: Transfer of controlling interests in generation facilities from Dynegy to PSEG
Purpose of Action:Consideration of the transfer of controlling interests in electric generation facilities from Dynegy to PSEG
Issue Date, Action
11-30-11 Proposed
Agency I.D No. PSC-48-11-00008
Subject Matter: Petition for the submetering of electricity
Purpose of Action:To consider the request of To Better Days, LLC to submeter electricity at 37 East 4th Street, New York, New York
Issue Date, Action
11-30-11 Proposed
Agency I.D No. PSC-01-12-00007
Subject Matter: The New York State Reliability Council's revisions to its rules and measurements
Purpose of Action:To adopt revisions to various rules and measurements of the New York State Reliability Council
Issue Date, Action
01-04-12 Proposed
Agency I.D No. PSC-01-12-00008
Subject Matter: Transfer of real property and easements from NMPNS to NMP3
Purpose of Action:Consideration of the transfer of real property and easements from NMPNS to NMP3
Issue Date, Action
01-04-12 Proposed
Agency I.D No. PSC-01-12-00009
Subject Matter: Recovery of expenses related to the expansion of Con Edison's ESCO referral program, PowerMove
Purpose of Action:To determine how and to what extent expenses related to the Expansion of Con Edison's ESCO referral program should be recovered
Issue Date, Action
01-04-12 Proposed
Agency I.D No. PSC-11-12-00002
Subject Matter: Whether to grant, deny or modify, in whole or part, Hegeman's petition for a waiver of Commission policy and Con Edison tariff
Purpose of Action:Whether to grant, deny or modify, in whole or part, Hegeman's petition for a waiver of Commission policy and Con Edison tariff
Issue Date, Action
03-14-12 Proposed
Agency I.D No. PSC-11-12-00005
Subject Matter: Transfer of land and water supply assets
Purpose of Action:Transfer the land and associated water supply assets of Groman Shores, LLC to Robert Groman
Issue Date, Action
03-14-12 Proposed
Agency I.D No. PSC-13-12-00005
Subject Matter: Authorization to transfer certain real property
Purpose of Action:To decide whether to approve the transfer of certain real property
Issue Date, Action
03-28-12 Proposed
Agency I.D No. PSC-19-12-00023
Subject Matter: Petition for approval pursuant to Section 70 for the sale of goods with an original cost of less than $100,000
Purpose of Action:To consider whether to grant, deny or modify, in whole or in part, the petition filed by Orange and Rockland Utilities, Inc.
Issue Date, Action
05-09-12 Proposed
Agency I.D No. PSC-21-12-00006
Subject Matter: Tariff filing requirements and refunds
Purpose of Action:To determine if certain agreements should be filed pursuant to the Public Service Law and if refunds are warranted
Issue Date, Action
05-23-12 Proposed
Agency I.D No. PSC-21-12-00011
Subject Matter: Whether to grant, deny or modify, in whole or part, the petition for waiver of tariff Rules 8.6 and 47
Purpose of Action:Whether to grant, deny or modify, in whole or part, the petition for waiver of tariff Rules 8.6 and 47
Issue Date, Action
05-23-12 Proposed
Agency I.D No. PSC-23-12-00007
Subject Matter: The approval of a financing upon a transfer to Alliance of upstream ownership interests in a generation facility
Purpose of Action:To consider the approval of a financing upon a transfer to Alliance of upstream ownership interests in a generation facility
Issue Date, Action
06-06-12 Proposed
Agency I.D No. PSC-23-12-00009
Subject Matter: Over earnings sharing between rate payers and shareholders
Purpose of Action:To establish an Earnings Sharing Mechanism to be applied following the conclusion of Corning's rate plan
Issue Date, Action
06-06-12 Proposed
Agency I.D No. PSC-27-12-00012
Subject Matter: Implementation of recommendations made in a Management Audit Report
Purpose of Action:To consider implementation of recommendations made in a Management Audit Report
Issue Date, Action
07-03-12 Proposed
Agency I.D No. PSC-28-12-00013
Subject Matter: Exemption of reliability reporting statistics for the purpose of the 2012 Reliability Performance Mechanism
Purpose of Action:Consideration of Orange and Rockland Utilities request for exemption of the 2012 reliability reporting statistics
Issue Date, Action
07-11-12 Proposed
Agency I.D No. PSC-29-12-00019
Subject Matter: Waiver of 16 NYCRR 894.1 through 894.4
Purpose of Action:To allow the Town of Hamden to waive certain preliminary franchising procedures to expedite the franchising process.
Issue Date, Action
07-18-12 Proposed
Agency I.D No. PSC-30-12-00010
Subject Matter: Waiver of 16 NYCRR 894.1 through 894.4
Purpose of Action:To allow the Town of Andes to waive certain preliminary franchising procedures to expedite the franchising process
Issue Date, Action
07-25-12 Proposed
Agency I.D No. PSC-33-12-00009
Subject Matter: Telecommunications companies ability to attach to utility company poles
Purpose of Action:Consideration of Tech Valley's ability to attach to Central Hudson poles
Issue Date, Action
08-15-12 Proposed
Agency I.D No. PSC-37-12-00009
Subject Matter: Proposed modification by Con Edison of its procedures to calculate estimated bills to its customers
Purpose of Action:Proposed modification by Con Edison of its procedures to calculate estimated bills to its customers
Issue Date, Action
09-12-12 Proposed
Agency I.D No. PSC-42-12-00009
Subject Matter: Regulation of Gipsy Trail Club, Inc.'s long-term financing agreements
Purpose of Action:To exempt Gipsy Trail Club, Inc. from Commission regulation of its financing agreements
Issue Date, Action
10-17-12 Proposed
Agency I.D No. PSC-45-12-00008
Subject Matter: Whether to grant, deny or modify, in whole or part, ESHG's petition for a waiver of Commission policy and RG&E tariff
Purpose of Action:Whether to grant, deny or modify, in whole or part, ESHG's petition for a waiver of Commission policy and RG&E tariff
Issue Date, Action
11-07-12 Proposed
Agency I.D No. PSC-45-12-00010
Subject Matter: Whether to grant, deny or modify, in whole or in part the petition of Con Edison to grant easements to Millwood Fire District
Purpose of Action:Whether to grant, deny or modify, in whole or in part the petition of Con Edison to grant easements to Millwood Fire District
Issue Date, Action
11-07-12 Proposed
Agency I.D No. PSC-50-12-00003
Subject Matter: Affiliate standards for Corning Natural Gas Corporation
Purpose of Action:To resolve issues raised by Corning Natural Gas Corporation in its petition for rehearing
Issue Date, Action
12-12-12 Proposed
Agency I.D No. PSC-04-13-00006
Subject Matter: Expansion of mandatory day ahead hourly pricing for customers of Orange and Rockland Utilities with demands above 100 kW
Purpose of Action:To consider the expansion of mandatory day ahead hourly pricing for customers with demands above 100 kW
Issue Date, Action
01-23-13 Proposed
Agency I.D No. PSC-04-13-00007
Subject Matter: Authorization to transfer certain real property.
Purpose of Action:To decide whether to approve the transfer of certain real property.
Issue Date, Action
01-23-13 Proposed
Agency I.D No. PSC-06-13-00008
Subject Matter: Verizon New York Inc.'s retail service quality
Purpose of Action:To investigate Verizon New York Inc.'s retail service quality
Issue Date, Action
02-06-13 Proposed
Agency I.D No. PSC-08-13-00012
Subject Matter: Filing requirements for certain Article VII electric facilities
Purpose of Action:To ensure that applications for certain electric transmission facilities contain pertinent information
Issue Date, Action
02-20-13 Proposed
Agency I.D No. PSC-08-13-00014
Subject Matter: Uniform System of Accounts - Request for Accounting Authorization
Purpose of Action:To allow the company to defer an item of expense or capital beyond the end of the year in which it was incurred
Issue Date, Action
02-20-13 Proposed
Agency I.D No. PSC-12-13-00007
Subject Matter: Protecting company water mains
Purpose of Action:To allow the company to require certain customers to make changes to the electrical grounding system at their homes
Issue Date, Action
03-20-13 Proposed
Agency I.D No. PSC-13-13-00008
Subject Matter: The potential waiver of 16 NYCRR 255.9221(d) completion of integrity assessments for certain gas transmission lines.
Purpose of Action:To determine whether a waiver of the timely completion of certain gas transmission line integrity assessments should be granted.
Issue Date, Action
03-27-13 Proposed
Agency I.D No. PSC-18-13-00007
Subject Matter: Whether Demand Energy Networks energy storage systems should be designated technologies for standby rate eligibility purposes
Purpose of Action:Whether Demand Energy Networks energy storage systems should be designated technologies for standby rate eligibility purposes
Issue Date, Action
05-01-13 Proposed
Agency I.D No. PSC-21-13-00003
Subject Matter: To consider policies that may impact consumer acceptance and use of electric vehicles
Purpose of Action:To consider and further develop policies that may impact consumer acceptance and use of electric vehicles
Issue Date, Action
05-22-13 Proposed
Agency I.D No. PSC-21-13-00005
Subject Matter: To implement an abandonment of Windover's water system
Purpose of Action:To approve the implementation of abandonment of Windover's water system
Issue Date, Action
05-22-13 Proposed
Agency I.D No. PSC-21-13-00008
Subject Matter: Rates of National Fuel Gas Distribution Corporation
Purpose of Action:To make the rates of National Fuel Gas Distribution Corporation temporary, subject to refund, if they are found to be excessive
Issue Date, Action
05-22-13 Proposed
Agency I.D No. PSC-21-13-00009
Subject Matter: Reporting requirements for natural gas local distribution companies
Purpose of Action:To help ensure efficient and economic expansion of the natural gas system as appropriate
Issue Date, Action
05-22-13 Proposed
Agency I.D No. PSC-22-13-00009
Subject Matter: On remand from New York State court litigation, determine the recovery of certain deferred amounts owed NFG by ratepayers
Purpose of Action:On remand, to determine the recovery of certain deferral amounts owed NFG from ratepayers
Issue Date, Action
05-29-13 Proposed
Agency I.D No. PSC-23-13-00005
Subject Matter: Waiver of partial payment, directory database distribution, service quality reporting, and service termination regulations
Purpose of Action:Equalize regulatory treatment based on level of competition and practical considerations
Issue Date, Action
06-05-13 Proposed
Agency I.D No. PSC-25-13-00008
Subject Matter: To deny, grant or modify, in whole or in part, Central Hudson's rehearing request.
Purpose of Action:To deny, grant or modify, in whole or in part, Central Hudson's rehearing request.
Issue Date, Action
06-19-13 Proposed
Agency I.D No. PSC-25-13-00009
Subject Matter: Provision by utilities of natural gas main and service lines.
Purpose of Action:To help ensure efficient and economic expansion of the natural gas system as appropriate.
Issue Date, Action
06-19-13 Proposed
Agency I.D No. PSC-25-13-00012
Subject Matter: To deny, grant or modify, in whole or in part, Central Hudson's rehearing request.
Purpose of Action:To deny, grant or modify, in whole or in part, Central Hudson's rehearing request.
Issue Date, Action
06-19-13 Proposed
Agency I.D No. PSC-27-13-00014
Subject Matter: Columbia Gas Transmission Corporation Cost Refund
Purpose of Action:For approval for temporary waiver of tariff provisions regarding its Columbia Gas Transmission Corporation cost refund.
Issue Date, Action
07-03-13 Proposed
Agency I.D No. PSC-28-13-00014
Subject Matter: Provision for the recovery and allocation of costs of transmission projects that reduce congestion on certain interfaces
Purpose of Action:To consider the recovery and allocation of costs of transmission projects that reduce congestion on certain interfaces
Issue Date, Action
07-10-13 Proposed
Agency I.D No. PSC-28-13-00016
Subject Matter: The request of NGT for lightened regulation as a gas corporation.
Purpose of Action:To consider whether to approve, reject, or modify the request of Niagara gas transport of Lockport, NY LLC.
Issue Date, Action
07-10-13 Proposed
Agency I.D No. PSC-28-13-00017
Subject Matter: The request by TE for waiver of regulations requiring that natural gas be odorized in certain gathering line segments
Purpose of Action:Consider the request by TE for waiver of regulations that gas be odorized in certain lines
Issue Date, Action
07-10-13 Proposed
Agency I.D No. PSC-32-13-00009
Subject Matter: To consider the definition of "misleading or deceptive conduct" in the Commission's Uniform Business Practices
Purpose of Action:To consider the definition of "misleading or deceptive conduct" in the Commission's Uniform Business Practices
Issue Date, Action
08-07-13 Proposed
Agency I.D No. PSC-32-13-00012
Subject Matter: To consider whether NYSEG should be required to undertake actions to protect its name and to minimize customer confusion
Purpose of Action:To consider whether NYSEG should be required to undertake actions to protect its name and to minimize customer confusion
Issue Date, Action
08-07-13 Proposed
Agency I.D No. PSC-33-13-00027
Subject Matter: Waive underground facility requirements for new construction in residential subdivisions to allow for overhead electric lines.
Purpose of Action:Determine whether Chapin Lumberland, LLC subdivision will be allowed overhead electric distribution and service lines.
Issue Date, Action
08-14-13 Proposed
Agency I.D No. PSC-33-13-00029
Subject Matter: Deferral of incremental costs associated with the restoration of steam service following Superstorm Sandy.
Purpose of Action:To consider a petition by Con Edison to defer certain incremental steam system restoration costs relating to Superstorm Sandy.
Issue Date, Action
08-14-13 Proposed
Agency I.D No. PSC-34-13-00004
Subject Matter: Escrow account and surcharge to fund extraordinary repairs
Purpose of Action:To approve the establishment of an escrow account and surcharge
Issue Date, Action
08-21-13 Proposed
Agency I.D No. PSC-42-13-00013
Subject Matter: Failure to Provide Escrow Information
Purpose of Action:The closure of the Escrow Account
Issue Date, Action
10-16-13 Proposed
Agency I.D No. PSC-42-13-00015
Subject Matter: Failure to Provide Escrow Information
Purpose of Action:The closure of the Escrow Account
Issue Date, Action
10-16-13 Proposed
Agency I.D No. PSC-43-13-00015
Subject Matter: Petition for submetering of electricity
Purpose of Action:To consider the request of 2701 Kingsbridge Terrace L.P. to submeter electricity at 2701 Kingsbridge Terrace, Bronx, N.Y.
Issue Date, Action
10-23-13 Proposed
Agency I.D No. PSC-45-13-00021
Subject Matter: Investigation into effect of bifurcation of gas and electric utility service on Long Island.
Purpose of Action:To consider a Petition for an investigation into effect of bifurcation of gas and electric utility service on Long Island.
Issue Date, Action
11-06-13 Proposed
Agency I.D No. PSC-45-13-00022
Subject Matter: Waiver of PSC regulations, 16 NYCRR section 88.4(a)(4)
Purpose of Action:To consider a waiver of certain regulations relating to the content of an application for transmission line siting
Issue Date, Action
11-06-13 Proposed
Agency I.D No. PSC-45-13-00023
Subject Matter: Waiver of PSC regulations, 16 NYCRR section 88.4(a)(4).
Purpose of Action:To consider a waiver of certain regulations relating to the content of an application for transmission line siting
Issue Date, Action
11-06-13 Proposed
Agency I.D No. PSC-45-13-00024
Subject Matter: Waiver of PSC regulations, 16 NYCRR section 88.4(a)(4); waiver of filing deadlines.
Purpose of Action:To consider a waiver of certain regulations relating to the content of an application for transmission line siting
Issue Date, Action
11-06-13 Proposed
Agency I.D No. PSC-45-13-00025
Subject Matter: Waiver of PSC regulations, 16 NYCRR section 88.4(a)(4).
Purpose of Action:To consider a waiver of certain regulations relating to the content of an application for transmission line siting
Issue Date, Action
11-06-13 Proposed
Agency I.D No. PSC-47-13-00009
Subject Matter: Petition for submetering of electricity.
Purpose of Action:To consider the request of Hegeman Avenue Housing L.P. to submeter electricity at 39 Hegeman Avenue, Brooklyn, N.Y.
Issue Date, Action
11-20-13 Proposed
Agency I.D No. PSC-47-13-00012
Subject Matter: Conditioning,restricting or prohibiting the purchase of services by NYSEG and RG&E from certain affiliates.
Purpose of Action:Consideration of conditioning,restricting or prohibiting the purchase of services by NYSEG and RG&E from certain affiliates.
Issue Date, Action
11-20-13 Proposed
Agency I.D No. PSC-49-13-00008
Subject Matter: Authorization to transfer all of Crystal Water Supply Company, Inc. stocks to Essel Infra West Inc.
Purpose of Action:To allow Crystal Water Supply Company, Inc to transfer all of its issued and outstanding stocks to Essel Infra West Inc.
Issue Date, Action
12-04-13 Proposed
Agency I.D No. PSC-51-13-00009
Subject Matter: Consolidated Edison proposing to use data from a test period ending September 30, 2013 to support its next rate filing.
Purpose of Action:To ensure there is a reasonable basis for data submitted in support of a request for a change in rates.
Issue Date, Action
12-18-13 Proposed
Agency I.D No. PSC-51-13-00010
Subject Matter: Consolidated Edison proposing to use data from a test period ending September 30, 2013 to support its next rate filing.
Purpose of Action:To ensure there is a reasonable basis for data submitted in support of a request for a change in rates.
Issue Date, Action
12-18-13 Proposed
Agency I.D No. PSC-51-13-00011
Subject Matter: Consolidated Edison proposing to use data from a test period ending September 30, 2013 to support its next rate filing.
Purpose of Action:To ensure there is a reasonable basis for data submitted in support of a request for a change in rates.
Issue Date, Action
12-18-13 Proposed
Agency I.D No. PSC-52-13-00012
Subject Matter: The development of reliability contingency plan(s) to address the potential retirement of Indian Point Energy Center (IPEC).
Purpose of Action:To address the petition for rehearing and reconsideration/motion for clarification of the IPEC reliability contingency plan(s).
Issue Date, Action
12-24-13 Proposed
Agency I.D No. PSC-52-13-00015
Subject Matter: To enter into a loan agreement with the banks for up to an amount of $94,000.
Purpose of Action:To consider allowing Knolls Water Company to enter into a long-term loan agreement.
Issue Date, Action
12-24-13 Proposed
Agency I.D No. PSC-05-14-00010
Subject Matter: The New York State Reliability Council's revisions to its rules and measurements
Purpose of Action:To adopt revisions to various rules and measurements of the New York State Reliability Council
Issue Date, Action
02-05-14 Proposed
Agency I.D No. PSC-07-14-00008
Subject Matter: Petition for submetering of electricity
Purpose of Action:To consider the request of Greater Centennial Homes HDFC, Inc. to submeter electricity at 102, 103 and 106 W 5th Street, et al.
Issue Date, Action
02-19-14 Proposed
Agency I.D No. PSC-07-14-00012
Subject Matter: Water rates and charges
Purpose of Action:Implementation of Long-Term Water Supply Surcharge to recover costs associated with the Haverstraw Water Supply Project
Issue Date, Action
02-19-14 Proposed
Agency I.D No. PSC-08-14-00015
Subject Matter: Verizon New York Inc.'s service quality and Customer Trouble Report Rate (CTRR) levels at certain central office entities
Purpose of Action:To improve Verizon New York Inc.'s service quality andthe Customer Trouble Report Rate levels at certain central office entities
Issue Date, Action
02-26-14 Proposed
Agency I.D No. PSC-10-14-00006
Subject Matter: Actions to facilitate the availability of ESCO value-added offerings, ESCO eligibility and ESCO compliance
Purpose of Action:To facilitate ESCO value-added offerings and to make changes to ESCO eligibility and to ensure ESCO compliance
Issue Date, Action
03-12-14 Proposed
Agency I.D No. PSC-11-14-00003
Subject Matter: Provision for the recovery and allocation of costs of transmission projects that reduce congestion on certain interfaces
Purpose of Action:To consider the recovery and allocation of costs of transmission projects that reduce congestion on certain interfaces
Issue Date, Action
03-19-14 Proposed
Agency I.D No. PSC-16-14-00014
Subject Matter: Whether to order NYSEG to provide gas service to customers when an expanded CPCN is approved and impose PSL 25-a penalties.
Purpose of Action:To order gas service to customers in the Town of Plattsburgh after approval of a town wide CPCN and to impose penalties.
Issue Date, Action
04-23-14 Proposed
Agency I.D No. PSC-16-14-00015
Subject Matter: Whether Central Hudson should be permitted to defer obligations of the Order issued on October 18, 2013 in Case 13-G-0336.
Purpose of Action:Consideration of the petition by Central Hudson to defer reporting obligations of the October 18, 2013 Order in Case 13-G-0336
Issue Date, Action
04-23-14 Proposed
Agency I.D No. PSC-17-14-00003
Subject Matter: Con Edison's Report on its 2013 performance under the Electric Service Reliability Performance Mechanism
Purpose of Action:Con Edison's Report on its 2013 performance under the Electric Service Reliability Performance Mechanism
Issue Date, Action
04-30-14 Proposed
Agency I.D No. PSC-17-14-00004
Subject Matter: To consider certain portions of petitions for rehearing, reconsideration and/or clarification
Purpose of Action:To consider certain portions of petitions for rehearing, reconsideration and/or clarification
Issue Date, Action
04-30-14 Proposed
Agency I.D No. PSC-17-14-00007
Subject Matter: To consider petitions for rehearing, reconsideration and/or clarification
Purpose of Action:To consider petitions for rehearing, reconsideration and/or clarification
Issue Date, Action
04-30-14 Proposed
Agency I.D No. PSC-17-14-00008
Subject Matter: To consider certain portions of petitions for rehearing, reconsideration and/or clarification
Purpose of Action:To consider certain portions of petitions for rehearing, reconsideration and/or clarification
Issue Date, Action
04-30-14 Proposed
Agency I.D No. PSC-19-14-00014
Subject Matter: Market Supply Charge
Purpose of Action:To make tariff revisions to the Market Supply Charge for capacity related costs
Issue Date, Action
05-14-14 Proposed
Agency I.D No. PSC-19-14-00015
Subject Matter: Whether to permit the use of the Sensus accuWAVE for use in residential and commercial gas meter applications
Purpose of Action:To permit gas utilities in New York State to use the Sensus accuWAVE 415TC gas meter
Issue Date, Action
05-14-14 Proposed
Agency I.D No. PSC-22-14-00013
Subject Matter: Petition to transfer and merge systems, franchises and assets.
Purpose of Action:To consider the Comcast and Time Warner Cable merger and transfer of systems, franchises and assets.
Issue Date, Action
06-04-14 Proposed
Agency I.D No. PSC-23-14-00010
Subject Matter: Whether to permit the use of the GE Dresser Series B3-HPC 11M-1480 rotary gas met for use in industrial gas meter applications
Purpose of Action:To permit gas utilities in New York State to use the GE Dresser Series B3-HPC 11M-1480 rotary gas meter
Issue Date, Action
06-11-14 Proposed
Agency I.D No. PSC-23-14-00014
Subject Matter: Waiver of the negative revenue adjustment associated with KEDLI's 2013 Customer Satisfaction Performance Metric
Purpose of Action:Consideration of KEDLI's waiver request pertaining to its 2013 performance under its Customer Satisfaction Metric
Issue Date, Action
06-11-14 Proposed
Agency I.D No. PSC-24-14-00005
Subject Matter: To examine LDC's performance and performance measures.
Purpose of Action:To improve gas safety performance.
Issue Date, Action
06-18-14 Proposed
Agency I.D No. PSC-26-14-00013
Subject Matter: Waiver of RG&E's tariffed definition of emergency generator.
Purpose of Action:To consider waiver of RG&E's tariffed definition of emergency generator.
Issue Date, Action
07-02-14 Proposed
Agency I.D No. PSC-26-14-00020
Subject Matter: New electric utility backup service tariffs and standards for interconnection may be adopted.
Purpose of Action:To encourage development of microgrids that enhance the efficiency, safety, reliability and resiliency of the electric grid.
Issue Date, Action
07-02-14 Proposed
Agency I.D No. PSC-26-14-00021
Subject Matter: Consumer protections, standards and protocols pertaining to access to customer data may be established.
Purpose of Action:To balance the need for the information necessary to support a robust market with customer privacy concerns.
Issue Date, Action
07-02-14 Proposed
Agency I.D No. PSC-28-14-00014
Subject Matter: Petition to transfer systems, franchises and assets.
Purpose of Action:To consider the Comcast and Charter transfer of systems, franchise and assets.
Issue Date, Action
07-16-14 Proposed
Agency I.D No. PSC-30-14-00023
Subject Matter: Whether to permit the use of the Sensus iPERL Fire Flow Meter.
Purpose of Action:Pursuant to 16 NYCRR Part 500.3, it is necessary to permit the use of the Sensus iPERL Fire Flow Meter.
Issue Date, Action
07-30-14 Proposed
Agency I.D No. PSC-30-14-00026
Subject Matter: Petition for a waiver to master meter electricity.
Purpose of Action:Considering the request of Renaissance Corporation of to master meter electricity at 100 Union Drive,Albany, NY.
Issue Date, Action
07-30-14 Proposed
Agency I.D No. PSC-31-14-00004
Subject Matter: To transfer 100% of the issued and outstanding stock from Vincent Cross to Bonnie and Michael Cross
Purpose of Action:To transfer 100% of the issued and outstanding stock from Vincent Cross to Bonnie and Michael Cross
Issue Date, Action
08-06-14 Proposed
Agency I.D No. PSC-32-14-00012
Subject Matter: Whether to grant or deny, in whole or in part, the Connect New York Coalition's petition
Purpose of Action:To consider the Connect New York Coalition's petition seeking a formal investigation and hearings
Issue Date, Action
08-13-14 Proposed
Agency I.D No. PSC-35-14-00004
Subject Matter: Regulation of a proposed electricity generation facility located in the Town of Brookhaven, NY
Purpose of Action:To consider regulation of a proposed electricity generation facility located in the Town of Brookhaven, NY
Issue Date, Action
09-03-14 Proposed
Agency I.D No. PSC-35-14-00005
Subject Matter: Whether to permit the use of the Sensus iConA electric meter
Purpose of Action:Pursuant to 16 NYCRR Parts 92 and 93, Commission approval is necessary to permit the use of the Sensus iConA electric meter
Issue Date, Action
09-03-14 Proposed
Agency I.D No. PSC-36-14-00009
Subject Matter: Modification to the Commission's Electric Safety Standards.
Purpose of Action:To consider revisions to the Commission's Electric Safety Standards.
Issue Date, Action
09-10-14 Proposed
Agency I.D No. PSC-38-14-00003
Subject Matter: Whether to approve, reject or modify, in whole or in part a time-sensitive rate pilot program.
Purpose of Action:Whether to approve, reject or modify, in whole or in part a time-sensitive rate pilot program.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00004
Subject Matter: The study and petition of Con Edison regarding use, accounting and ratemaking treatment for 11-23 and 2-28 Hudson Ave. Brooklyn.
Purpose of Action:The study and petition of Con Edison regarding use, accounting and ratemaking treatment for 11-23 and 2-28 Hudson Ave. Brooklyn.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00005
Subject Matter: Action on the report and petition of Con Edison regarding the Storm Hardening and Resiliency Collaborative, Phase 2.
Purpose of Action:Action on the report and petition of Con Edison regarding the Storm Hardening and Resiliency Collaborative, Phase 2.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00007
Subject Matter: Whether to expand Con Edison's low income program to include Medicaid recipients.
Purpose of Action:Whether to expand Con Edison's low income program to include Medicaid recipients.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00008
Subject Matter: The study and petition of Con Edison regarding use, accounting and ratemaking treatment for 11-23 and 2-28 Hudson Ave. Brooklyn.
Purpose of Action:The study and petition of Con Edison regarding use, accounting and ratemaking treatment for 11-23 and 2-28 Hudson Ave. Brooklyn.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00010
Subject Matter: Inter-carrier telephone service quality standard and metrics and administrative changes.
Purpose of Action:To review recommendations from the Carrier Working Group and incorporate appropriate modifications to the existing Guidelines.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-38-14-00012
Subject Matter: Action on the report and petition of Con Edison regarding the Storm Hardening and Resiliency Collaborative, Phase 2.
Purpose of Action:Action on the report and petition of Con Edison regarding the Storm Hardening and Resiliency Collaborative, Phase 2.
Issue Date, Action
09-24-14 Proposed
Agency I.D No. PSC-39-14-00020
Subject Matter: Whether to permit the use of the Mueller Systems 400 Series and 500 Series of water meters
Purpose of Action:Pursuant to 16 NYCRR section 500.3, whether to permit the use of the Mueller Systems 400, and 500 Series of water meters
Issue Date, Action
10-01-14 Proposed
Agency I.D No. PSC-40-14-00008
Subject Matter: To consider granting authorization for Buy Energy Direct to resume marketing to residential customers.
Purpose of Action:To consider granting authorization for Buy Energy Direct to resume marketing to residential customers.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-40-14-00009
Subject Matter: Whether to permit the use of the Itron Open Way Centron Meter with Hardware 3.1 for AMR and AMI functionality.
Purpose of Action:Pursuant to 16 NYCRR Parts 93, is necessary to permit the use of the Itron Open Way Centron Meter with Hardware 3.1.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-40-14-00011
Subject Matter: Late Payment Charge.
Purpose of Action:To modify Section 7.6 - Late Payment Charge to designate a specific time for when a late payment charge is due.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-40-14-00013
Subject Matter: Regulation of a proposed natural gas pipeline and related facilities located in the Town of Ticonderoga, NY.
Purpose of Action:To consider regulation of a proposed natural gas pipeline and related facilities located in the Town of Ticonderoga, NY.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-40-14-00014
Subject Matter: Waiver of 16 NYCRR Sections 894.1 through 894.4(b)(2)
Purpose of Action:To allow the Town of Goshen, NY, to waive certain preliminary franchising procedures to expedite the franchising process.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-40-14-00015
Subject Matter: Late Payment Charge.
Purpose of Action:To modify Section 6.6 - Late Payment Charge to designate a specific time for when a late payment charge is due.
Issue Date, Action
10-08-14 Proposed
Agency I.D No. PSC-42-14-00003
Subject Matter: Annual Reconciliation of Gas Expenses and Gas Cost Recoveries
Purpose of Action:The filings of various LDCs and municipalities regarding their Annual Reconciliation of Gas Expenses and Gas Cost Recoveries
Issue Date, Action
10-22-14 Proposed
Agency I.D No. PSC-42-14-00004
Subject Matter: Winter Bundled Sales Service Option
Purpose of Action:To modify SC-11 to remove language relating to fixed storage charges in the determination of the Winter Bundled Sales charge
Issue Date, Action
10-22-14 Proposed
Agency I.D No. PSC-48-14-00014
Subject Matter: Considering the recommendations contained in Staff' s electric outage investigation report for MNRR, New Haven Line.
Purpose of Action:To consider the recommendations contained in Staff's electric outage investigation report for MNRR, New Haven Line.
Issue Date, Action
12-03-14 Proposed
Agency I.D No. PSC-52-14-00019
Subject Matter: Petition for a waiver to master meter electricity.
Purpose of Action:Considering the request of 614 South Crouse Avenue, LLC to master meter electricity at 614 South Crouse Avenue, Syracuse, NY..
Issue Date, Action
12-31-14 Proposed
Agency I.D No. PSC-01-15-00014
Subject Matter: State Universal Service Fund Disbursements
Purpose of Action:To consider Edwards Telephone Company's request for State Universal Service Fund disbursements
Issue Date, Action
01-07-15 Proposed
Agency I.D No. PSC-08-15-00009
Subject Matter: Approval of a surcharge.
Purpose of Action:To allow or disallow Emerald Green Lake Louise Marie Water Company, Inc. for a surcharge.
Issue Date, Action
02-25-15 Proposed
Agency I.D No. PSC-08-15-00010
Subject Matter: Request pertaining to the lawfulness of National Grid USA continuing its summary billing program.
Purpose of Action:To grant, deny, or modify URAC Rate Consultants' request that National Grid cease its summary billing program.
Issue Date, Action
02-25-15 Proposed
Agency I.D No. PSC-10-15-00007
Subject Matter: Notification concerning tax refunds
Purpose of Action:To consider Verizon New York Inc.'s partial rehearing or reconsideration request regarding retention of property tax refunds
Issue Date, Action
03-11-15 Proposed
Agency I.D No. PSC-10-15-00008
Subject Matter: Whether to waive Policy on Test Periods in Major Rate Proceedings and provide authority to file tariff changes
Purpose of Action:Whether to waive Policy on Test Periods in Major Rate Proceedings and provide authority to file tariff changes
Issue Date, Action
03-11-15 Proposed
Agency I.D No. PSC-13-15-00024
Subject Matter: Whether Leatherstocking should be permitted to recover a shortfall in earnings
Purpose of Action:To decide whether to approve Leatherstocking's request to recover a shortfall in earnings
Issue Date, Action
04-01-15 Proposed
Agency I.D No. PSC-13-15-00026
Subject Matter: Whether to permit the use of the Sensus Smart Point Gas AMR/AMI product
Purpose of Action:To permit the use of the Sensus Smart Point Gas AMR/AMI product
Issue Date, Action
04-01-15 Proposed
Agency I.D No. PSC-13-15-00027
Subject Matter: Whether to permit the use of the Measurlogic DTS 310 electric submeter
Purpose of Action:To permit the use of the Measurlogic DTS 310 submeter
Issue Date, Action
04-01-15 Proposed
Agency I.D No. PSC-13-15-00028
Subject Matter: Whether to permit the use of the SATEC EM920 electric meter
Purpose of Action:To permit necessary to permit the use of the SATEC EM920 electric meter
Issue Date, Action
04-01-15 Proposed
Agency I.D No. PSC-13-15-00029
Subject Matter: Whether to permit the use the Triacta Power Technologies 6103, 6112, 6303, and 6312 electric submeters
Purpose of Action:To permit the use of the Triacta submeters
Issue Date, Action
04-01-15 Proposed
Agency I.D No. PSC-17-15-00007
Subject Matter: To consider the petition of Leatherstocking Gas Company, LLC seeking authority to issue long-term debt of $2.75 million
Purpose of Action:To consider the petition of Leatherstocking Gas Company, LLC seeking authority to issue long-term debt of $2.75 million
Issue Date, Action
04-29-15 Proposed
Agency I.D No. PSC-18-15-00005
Subject Matter: Con Edison's Report on its 2014 performance under the Electric Service Reliability Performance Mechanism
Purpose of Action:Con Edison's Report on its 2014 performance under the Electric Service Reliability Performance Mechanism
Issue Date, Action
05-06-15 Proposed
Agency I.D No. PSC-19-15-00011
Subject Matter: Gas Safety Performance Measures and associated negative revenue adjustments
Purpose of Action:To update the performance measures applicable to KeySpan Gas East Corporation d/b/a National Grid
Issue Date, Action
05-13-15 Proposed
Agency I.D No. PSC-22-15-00015
Subject Matter: To consider the request for waiver of the individual residential unit meter requirements and 16 NYCRR 96.1(a)
Purpose of Action:To consider the request for waiver of the individual residential unit meter requirements and 16 NYCRR 96.1(a)
Issue Date, Action
06-03-15 Proposed
Agency I.D No. PSC-23-15-00005
Subject Matter: The modification of New York American Water's current rate plan
Purpose of Action:Whether to adopt the terms of the Joint Proposal submitted by NYAW and DPS Staff
Issue Date, Action
06-10-15 Proposed
Agency I.D No. PSC-23-15-00006
Subject Matter: The modification of New York American Water's current rate plan
Purpose of Action:Whether to adopt the terms of the Joint Proposal submitted by NYAW and DPS Staff
Issue Date, Action
06-10-15 Proposed
Agency I.D No. PSC-25-15-00008
Subject Matter: Notice of Intent to Submeter electricity.
Purpose of Action:To consider the request of 165 E 66 Residences, LLC to submeter electricity at 165 East 66th Street, New York, New York.
Issue Date, Action
06-24-15 Proposed
Agency I.D No. PSC-29-15-00025
Subject Matter: Joint Petition for authority to transfer real property located at 624 West 132nd Street, New York, NY
Purpose of Action:Whether to authorize the proposed transfer of real property located at 624 West 132nd Street, New York, NY
Issue Date, Action
07-22-15 Proposed
Agency I.D No. PSC-32-15-00006
Subject Matter: Development of a Community Solar Demonstration Project.
Purpose of Action:To approve the development of a Community Solar Demonstration Project.
Issue Date, Action
08-12-15 Proposed
Agency I.D No. PSC-33-15-00009
Subject Matter: Remote net metering of a demonstration community net metering program.
Purpose of Action:To consider approval of remote net metering of a demonstration community net metering program.
Issue Date, Action
08-19-15 Proposed
Agency I.D No. PSC-33-15-00012
Subject Matter: Remote net metering of a Community Solar Demonstration Project.
Purpose of Action:To consider approval of remote net metering of a Community Solar Demonstration Project.
Issue Date, Action
08-19-15 Proposed
Agency I.D No. PSC-34-15-00021
Subject Matter: Petition by NYCOM requesting assistance with obtaining information on CLECs and ESCOs
Purpose of Action:To consider the petition by NYCOM requesting assistance with obtaining information on CLECs and ESCOs
Issue Date, Action
08-26-15 Proposed
Agency I.D No. PSC-35-15-00014
Subject Matter: Consideration of consequences against Light Power & Gas, LLC for violations of the UBP
Purpose of Action:To consider consequences against Light Power & Gas, LLC for violations of the UBP
Issue Date, Action
09-02-15 Proposed
Agency I.D No. PSC-37-15-00007
Subject Matter: Submetered electricity
Purpose of Action:To consider the request of 89 Murray Street Ass. LLC, for clarification of the submetering order issued December 20, 2007
Issue Date, Action
09-16-15 Proposed
Agency I.D No. PSC-40-15-00014
Subject Matter: Whether to permit the use of the Open Way 3.5 with cellular communications
Purpose of Action:To consider the use of the Open Way 3.5 electric meter, pursuant to 16 NYCRR Parts 92 and 93
Issue Date, Action
10-07-15 Proposed
Agency I.D No. PSC-42-15-00006
Subject Matter: Deferral of incremental expenses associated with NERC's new Bulk Electric System (BES) compliance requirements approved by FERC.
Purpose of Action:Consideration of Central Hudson's request to defer incremental expenses associated with new BES compliance requirements.
Issue Date, Action
10-21-15 Proposed
Agency I.D No. PSC-44-15-00028
Subject Matter: Deferral of incremental expenses associated with new compliance requirements
Purpose of Action:Consideration of Central Hudson's request to defer incremental expenses associated with new compliance requirements
Issue Date, Action
11-04-15 Proposed
Agency I.D No. PSC-47-15-00013
Subject Matter: Whitepaper on Implementing Lightened Ratemaking Regulation.
Purpose of Action:Consider Whitepaper on Implementing Lightened Ratemaking Regulation.
Issue Date, Action
11-25-15 Proposed
Agency I.D No. PSC-48-15-00010
Subject Matter: Lightened and incidental regulation of a 55 MW electric and steam generating facility.
Purpose of Action:Consider the lightened and incidental regulation of a 55 MW electric and steam generating facility.
Issue Date, Action
12-02-15 Proposed
Agency I.D No. PSC-48-15-00011
Subject Matter: Proposal to retire Huntley Units 67 and 68 on March 1, 2016.
Purpose of Action:Consider the proposed retirement of Huntley Units 67 and 68.
Issue Date, Action
12-02-15 Proposed
Agency I.D No. PSC-50-15-00006
Subject Matter: The reduction of rates.
Purpose of Action:To consider the reduction of rates charged by Independent Water Works, Inc.
Issue Date, Action
12-16-15 Proposed
Agency I.D No. PSC-50-15-00009
Subject Matter: Notice of Intent to submeter electricity.
Purpose of Action:To consider the request to submeter electricity at 31-33 Lincoln Road and 510 Flatbush Avenue, Brooklyn, New York.
Issue Date, Action
12-16-15 Proposed
Agency I.D No. PSC-51-15-00010
Subject Matter: Modification of the EDP
Purpose of Action:To consider modifying the EDP
Issue Date, Action
12-23-15 Proposed
Agency I.D No. PSC-01-16-00005
Subject Matter: Proposed amendment to Section 5, Attachment 1.A of the Uniform Business Practices
Purpose of Action:To consider amendment to Section 5, Attachment 1.A of the Uniform Business Practices
Issue Date, Action
01-06-16 Proposed
Agency I.D No. PSC-04-16-00007
Subject Matter: Whether Hamilton Municipal Utilities should be permitted to construct and operate a municipal gas distribution facility.
Purpose of Action:Consideration of the petition by Hamilton Municipal Utilities to construct and operate a municipal gas distribution facility.
Issue Date, Action
01-27-16 Proposed
Agency I.D No. PSC-04-16-00012
Subject Matter: Proposal to mothball three gas turbines located at the Astoria Gas Turbine Generating Station.
Purpose of Action:Consider the proposed mothball of three gas turbines located at the Astoria Gas Turbine Generating Station.
Issue Date, Action
01-27-16 Proposed
Agency I.D No. PSC-04-16-00013
Subject Matter: Proposal to find that three gas turbines located at the Astoria Gas Turbine Generating Station are uneconomic.
Purpose of Action:Consider whether three gas turbines located at the Astoria Gas Turbine Generating Station are uneconomic.
Issue Date, Action
01-27-16 Proposed
Agency I.D No. PSC-06-16-00013
Subject Matter: Continued deferral of approximately $16,000,000 in site investigation and remediation costs.
Purpose of Action:To consider the continued deferral of approximately $16,000,000 in site investigation and remediation costs.
Issue Date, Action
02-10-16 Proposed
Agency I.D No. PSC-06-16-00014
Subject Matter: MEGA's proposed demonstration CCA program.
Purpose of Action:To consider MEGA's proposed demonstration CCA program.
Issue Date, Action
02-10-16 Proposed
Agency I.D No. PSC-14-16-00008
Subject Matter: Resetting retail markets for ESCO mass market customers.
Purpose of Action:To ensure consumer protections with respect to residential and small non-residential ESCO customers.
Issue Date, Action
04-06-16 Proposed
Agency I.D No. PSC-18-16-00013
Subject Matter: Amendments to the Uniform Business Practices of ESCOs.
Purpose of Action:To ensure consumer protection for ESCO customers.
Issue Date, Action
05-04-16 Proposed
Agency I.D No. PSC-18-16-00014
Subject Matter: Amendments to the Uniform Business Practices of ESCOs.
Purpose of Action:To ensure consumer protection for ESCO customers.
Issue Date, Action
05-04-16 Proposed
Agency I.D No. PSC-18-16-00015
Subject Matter: Petitions for rehearing of the Order Resetting Retail Energy Markets and Establishing Further Process.
Purpose of Action:To ensure consumer protections for ESCO customers.
Issue Date, Action
05-04-16 Proposed
Agency I.D No. PSC-18-16-00016
Subject Matter: Amendments to the Uniform Business Practices of ESCOs.
Purpose of Action:To ensure consumer protection for ESCO customers.
Issue Date, Action
05-04-16 Proposed
Agency I.D No. PSC-18-16-00018
Subject Matter: Amendments to the Uniform Business Practices of ESCOs.
Purpose of Action:To ensure consumer protection for ESCO customers.
Issue Date, Action
05-04-16 Proposed
Agency I.D No. PSC-20-16-00008
Subject Matter: Consideration of consequences against Global Energy Group, LLC for violations of the Uniform Business Practices (UBP).
Purpose of Action:To consider consequences against Global Energy Group, LLC for violations of the Uniform Business Practices (UBP).
Issue Date, Action
05-18-16 Proposed
Agency I.D No. PSC-20-16-00010
Subject Matter: Deferral and recovery of incremental expense.
Purpose of Action:To consider deferring costs of conducting leak survey and repairs for subsequent recovery.
Issue Date, Action
05-18-16 Proposed
Agency I.D No. PSC-20-16-00011
Subject Matter: Enetics LD-1120 Non-Intrusive Load Monitoring Device in the Statewide Residential Appliance Metering Study.
Purpose of Action:To consider the use of the Enetics LD-1120 Non-Intrusive Load Monitoring Device.
Issue Date, Action
05-18-16 Proposed
Agency I.D No. PSC-24-16-00009
Subject Matter: Petition to submeter gas service.
Purpose of Action:To consider the Petition of New York City Economic Development Corp. to submeter gas at Pier 17, 89 South Street, New York, NY.
Issue Date, Action
06-15-16 Proposed
Agency I.D No. PSC-25-16-00009
Subject Matter: To delay Companies' third-party assessments of customer personally identifiable information until 2018.
Purpose of Action:To extend the time period between the Companies' third-party assessments of customer personally identifiable information.
Issue Date, Action
06-22-16 Proposed
Agency I.D No. PSC-25-16-00024
Subject Matter: Pole Attachment Rules.
Purpose of Action:To determine that the Commission's existing pole attachment rules apply to wireless providers.
Issue Date, Action
06-22-16 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-25-16-00025
Subject Matter: Acquisition of all water supply assets of Woodbury Heights Estates Water Co., Inc. by the Village of Kiryas Joel.
Purpose of Action:To consider acquisition of all water supply assets of Woodbury Heights Estates Water Co., Inc. by the Village of Kiryas Joel.
Issue Date, Action
06-22-16 Proposed
Agency I.D No. PSC-25-16-00026
Subject Matter: Use of the Badger E Series Ultrasonic Cold Water Stainless Steel Meter, in residential fire service applications.
Purpose of Action:To consider the use of the Badger E Series Ultrasonic Cold Water Stainless Steel Meter in fire service applications.
Issue Date, Action
06-22-16 Proposed
Agency I.D No. PSC-28-16-00017
Subject Matter: A petition for rehearing of the Order Adopting a Ratemaking and Utility Revenue Model Policy Framework.
Purpose of Action:To determine appropriate rules for and calculation of the distributed generation reliability credit.
Issue Date, Action
07-13-16 Proposed
Agency I.D No. PSC-29-16-00024
Subject Matter: Participation of NYPA customers in surcharge-funded clean energy programs.
Purpose of Action:To consider participation of NYPA customers in surcharge-funded clean energy programs.
Issue Date, Action
07-20-16 Proposed
Agency I.D No. PSC-32-16-00012
Subject Matter: Benefit-Cost Analysis Handbooks.
Purpose of Action:To evaluate proposed methodologies of benefit-cost evaluation.
Issue Date, Action
08-10-16 Proposed
Agency I.D No. PSC-33-16-00001
Subject Matter: Use of escrow funds for repairs.
Purpose of Action:To authorize the use of escrow account funds for repairs.
Issue Date, Action
08-17-16 Emergency/Proposed
Agency I.D No. PSC-33-16-00005
Subject Matter: Exemption from certain charges for delivery of electricity to its Niagara Falls, New York facility.
Purpose of Action:Application of System Benefits Charges, Renewable Portfolio Standard charges and Clean Energy Fund surcharges.
Issue Date, Action
08-17-16 Proposed
Agency I.D No. PSC-35-16-00015
Subject Matter: NYSRC's revisions to its rules and measurements
Purpose of Action:To consider revisions to various rules and measurements of the NYSRC
Issue Date, Action
08-31-16 Proposed
Agency I.D No. PSC-36-16-00004
Subject Matter: Recovery of costs for installation of electric service.
Purpose of Action:To consider the recovery of costs for installation of electric service.
Issue Date, Action
09-07-16 Proposed
Agency I.D No. PSC-40-16-00025
Subject Matter: Consequences pursuant to the Commission's Uniform Business Practices (UBP).
Purpose of Action:To consider whether to impose consequences on Smart One for its apparent non-compliance with Commission requirements.
Issue Date, Action
10-05-16 Proposed
Agency I.D No. PSC-47-16-00009
Subject Matter: Petition to use commercial electric meters
Purpose of Action:To consider the petition of Itron, Inc. to use the Itron CP2SO and CP2SOA in commercial electric meter applications
Issue Date, Action
11-23-16 Proposed
Agency I.D No. PSC-47-16-00010
Subject Matter: Standby Service rate design
Purpose of Action:To consider the report filed and the recommendations therein
Issue Date, Action
11-23-16 Proposed
Agency I.D No. PSC-47-16-00013
Subject Matter: Standby Service rate design
Purpose of Action:To consider the report filed and the recommendations therein
Issue Date, Action
11-23-16 Proposed
Agency I.D No. PSC-47-16-00014
Subject Matter: Standby Service rate design
Purpose of Action:To consider the report filed and the recommendations therein
Issue Date, Action
11-23-16 Proposed
Agency I.D No. PSC-47-16-00016
Subject Matter: Standby Service rate design
Purpose of Action:To consider the report filed and the recommendations therein
Issue Date, Action
11-23-16 Proposed
Agency I.D No. PSC-02-17-00010
Subject Matter: Implementation of the four EAMs.
Purpose of Action:To consider the implementation of EAMs for RG&E.
Issue Date, Action
01-11-17 Proposed
Agency I.D No. PSC-02-17-00012
Subject Matter: Implementation of the four EAMs.
Purpose of Action:To consider the implementation of EAMs for NYSEG.
Issue Date, Action
01-11-17 Proposed
Agency I.D No. PSC-14-17-00017
Subject Matter: Petition for Full-Scale Deployment of AMI and to Establish an AMI Surcharge.
Purpose of Action:To consider the petition for Full-Scale Deployment of AMI and to Establish an AMI Surcharge.
Issue Date, Action
04-05-17 Proposed
Agency I.D No. PSC-18-17-00024
Subject Matter: A petition for rehearing or reconsideration of the Order Addressing Public Policy Transmission Need for AC Transmission Upgrades
Purpose of Action:To determine whether Public Policy Transmission Need/Public Policy Requirements continue to exist.
Issue Date, Action
05-03-17 Proposed
Agency I.D No. PSC-18-17-00026
Subject Matter: Revisions to the Dynamic Load Management surcharge.
Purpose of Action:To consider revisions to the Dynamic Load Management surcharge.
Issue Date, Action
05-03-17 Proposed
Agency I.D No. PSC-19-17-00004
Subject Matter: NYAW's request to defer and amortize, for future rate recognition, pension settlement payout losses incurred in 2016.
Purpose of Action:Consideration of NYAW's petition to defer and amortize, for future rate recognition, pension payour losses incurred in 2016.
Issue Date, Action
05-10-17 Proposed
Agency I.D No. PSC-20-17-00008
Subject Matter: Compressed natural gas as a motor fuel for diesel fueled vehicles.
Purpose of Action:To consider a report filed by National Grid NY regarding the potential for adoption of compressed natural gas as a motor fuel.
Issue Date, Action
05-17-17 Proposed
Agency I.D No. PSC-20-17-00010
Subject Matter: Compressed natural gas as a motor fuel for diesel fueled vehicles.
Purpose of Action:To consider a report filed by National Grid regarding the potential for adoption of compressed natural gas as a motor fuel.
Issue Date, Action
05-17-17 Proposed
Agency I.D No. PSC-21-17-00013
Subject Matter: The establishment and implementation of Earnings Adjustment Mechanisms.
Purpose of Action:To consider the establishment and implementation of Earnings Adjustment Mechanisms.
Issue Date, Action
05-24-17 Proposed
Agency I.D No. PSC-21-17-00018
Subject Matter: Proposed agreement for the provision of water service by Saratoga Water Services, Inc.
Purpose of Action:To consider a waiver and approval of terms of a service agreement.
Issue Date, Action
05-24-17 Proposed
Agency I.D No. PSC-22-17-00004
Subject Matter: Financial incentives to create customer savings and develop market-enabling tools, with a focus on outcomes and incentives
Purpose of Action:To consider the proposed Interconnection Survey Process and Earnings Adjustment Mechanisms
Issue Date, Action
05-31-17 Proposed
Agency I.D No. PSC-23-17-00022
Subject Matter: Changes in regulation of ESCOs, including restrictions on or prohibitions of marketing or offering certain products or services.
Purpose of Action:To ensure consumer protection for ESCO customers.
Issue Date, Action
06-07-17 Proposed
Agency I.D No. PSC-24-17-00006
Subject Matter: Development of the Utility Energy Registry.
Purpose of Action:Improved data access.
Issue Date, Action
06-14-17 Proposed
Agency I.D No. PSC-24-17-00014
Subject Matter: An alternative methodology for calculating billing adjustments.
Purpose of Action:To consider an alternative methodology for calculating billing adjustments.
Issue Date, Action
06-14-17 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-26-17-00005
Subject Matter: Notice of Intent to submeter electricity.
Purpose of Action:To consider the Notice of Intent to submeter electricity at 125 Waverly Street, Yonkers, New York.
Issue Date, Action
06-28-17 Proposed
Agency I.D No. PSC-31-17-00010
Subject Matter: Notice of intent to submeter electricity
Purpose of Action:To consider the notice of intent of 11737 Owners Corp. to submeter electricity at 117 East 37th Street, New York, New York
Issue Date, Action
08-02-17 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-34-17-00011
Subject Matter: Waiver to permit Energy Cooperative of America to serve low-income customers
Purpose of Action:To consider the petition for a waiver
Issue Date, Action
08-23-17 Proposed
Agency I.D No. PSC-37-17-00005
Subject Matter: Financial incentives to create customer savings and develop market-enabling tools, with a focus on outcomes and incentives.
Purpose of Action:To consider the revised Interconnection Survey Process and Earnings Adjustment Mechanisms.
Issue Date, Action
09-13-17 Proposed
Agency I.D No. PSC-37-17-00006
Subject Matter: Petition to submeter electricity.
Purpose of Action:To consider the petition of ACC OP (Park Point SU) LLC to submeter electricity at 417 Comstock Avenue, Syracuse, New York.
Issue Date, Action
09-13-17 Proposed
Agency I.D No. PSC-39-17-00009
Subject Matter: Whether a proposed agreement for the provision of water service by Saratoga Water Services, Inc. is in the public interest.
Purpose of Action:To consider the terms of a service agreement and waiver.
Issue Date, Action
09-27-17 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PSC-39-17-00011
Subject Matter: Whether to direct New York State Electric & Gas to complete electric facility upgrades at no charge to Hanehan.
Purpose of Action:To determine financial responsibility between NYSEG and Hanehan for the electric service upgrades to Hanehan.
Issue Date, Action
09-27-17 Proposed
Agency I.D No. PSC-40-17-00006
Subject Matter: The aggregation of electric service for the Empire State Plaza and the Sheridan Avenue Steam Plant
Purpose of Action:To consider a waiver of National Grid's tariff provision requiring all electric delivery points to be on the same premises
Issue Date, Action
10-04-17 Proposed
Agency I.D No. PSC-42-17-00010
Subject Matter: Petition for rehearing of negative revenue adjustment and contents of annual Performance Report.
Purpose of Action:To consider NFGD's petition for rehearing.
Issue Date, Action
10-18-17 Proposed
Agency I.D No. PSC-46-17-00013
Subject Matter: Annual Reconciliation of Gas Expenses and Gas Cost Recoveries
Purpose of Action:To consider filings of LDCs and municipalities regarding their Annual Reconciliation of Gas Expenses and Gas Cost Recoveries
Issue Date, Action
11-15-17 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-48-17-00015
Subject Matter: Low Income customer options for affordable water bills.
Purpose of Action:To consider the Low Income Bill Discount and/or Energy Efficiency Rebate Programs.
Issue Date, Action
11-29-17 Proposed
Agency I.D No. PSC-50-17-00017
Subject Matter: New Wave Energy Corp.'s petition for rehearing.
Purpose of Action:To consider the petition for rehearing filed by New Wave Energy Corp.
Issue Date, Action
12-13-17 Proposed
Agency I.D No. PSC-50-17-00018
Subject Matter: Application of the Public Service Law to DER suppliers.
Purpose of Action:To determine the appropriate regulatory framework for DER suppliers.
Issue Date, Action
12-13-17 Proposed
Agency I.D No. PSC-50-17-00019
Subject Matter: Transfer of utility property.
Purpose of Action:To consider the transfer of utility property.
Issue Date, Action
12-13-17 Proposed
Agency I.D No. PSC-50-17-00021
Subject Matter: Disposition of tax refunds and other related matters.
Purpose of Action:To consider the disposition of tax refunds and other related matters.
Issue Date, Action
12-13-17 Proposed
Agency I.D No. PSC-50-17-00022
Subject Matter: Data protection rules for DER suppliers.
Purpose of Action:To determine the appropriate regulatory framework for DER suppliers.
Issue Date, Action
12-13-17 Proposed
Agency I.D No. PSC-51-17-00007
Subject Matter: Opt-out tariff regarding installation of advanced digital metering devices in Central Hudson's service territory.
Purpose of Action:To determine the appropriate opt-out provisions for Central Hudson customers regarding advanced digital metering devices.
Issue Date, Action
12-20-17 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-51-17-00011
Subject Matter: Petition for recovery of certain costs related to the implementation of a Non-Wires Alternative Project.
Purpose of Action:To consider Con Edison's petition for the recovery of costs for implementing the JFK Project.
Issue Date, Action
12-20-17 Proposed
Agency I.D No. PSC-51-17-00015
Subject Matter: Opt-out tariff regarding installation of advanced digital metering devices in Central Hudson's service territory.
Purpose of Action:To determine the appropriate opt-out provisions for Central Hudson customers regarding advanced digital metering devices.
Issue Date, Action
12-20-17 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-52-17-00014
Subject Matter: Oversight and support of Clean Energy Fund and related NYSERDA activities
Purpose of Action:To support and monitor the deployment of clean energy technology
Issue Date, Action
12-27-17 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-04-18-00003
Subject Matter: Minor rate filing.
Purpose of Action:To consider a proposal for an increase in total annual revenues of approximately $136,634, or 11.4%.
Issue Date, Action
01-24-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-04-18-00005
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To consider the notice of intent of Montante/Morgan Gates Circle LLC to submeter electricity.
Issue Date, Action
01-24-18 Proposed
Agency I.D No. PSC-05-18-00004
Subject Matter: Lexington Power's ZEC compliance obligation.
Purpose of Action:To promote and maintain renewable and zero-emission electric energy resources.
Issue Date, Action
01-31-18 Proposed
Agency I.D No. PSC-06-18-00012
Subject Matter: To consider further proposed amendments to the original criteria to grandfathering established in the Transition Plan
Purpose of Action:To modify grandfathering criteria
Issue Date, Action
02-07-18 Proposed
Agency I.D No. PSC-06-18-00017
Subject Matter: Merger of NYAW and Whitlock Farms Water Corp.
Purpose of Action:To consider the merger of NYAW and Whitlock Farms Water Company into a single corporate entity
Issue Date, Action
02-07-18 Proposed
Agency I.D No. PSC-07-18-00015
Subject Matter: The accuracy and reasonableness of National Grid's billing for certain interconnection upgrades.
Purpose of Action:To consider AEC's petition requesting resolution of their billing dispute with National Grid.
Issue Date, Action
02-14-18 Proposed
Agency I.D No. PSC-11-18-00004
Subject Matter: New York State Lifeline Program.
Purpose of Action:To consider TracFone's petition seeking approval to participate in Lifeline.
Issue Date, Action
03-14-18 Proposed
Agency I.D No. PSC-13-18-00014
Subject Matter: Commission oversight of distributed energy resource suppliers
Purpose of Action:To protect customers and utilities in the receipt of services from distributed energy resource suppliers
Issue Date, Action
03-28-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-13-18-00015
Subject Matter: Eligibility of an ESCO to market to and enroll residential customers.
Purpose of Action:To consider whether Astral should be allowed to market to and enroll residential customers following a suspension.
Issue Date, Action
03-28-18 Proposed
Agency I.D No. PSC-13-18-00023
Subject Matter: Reconciliation of property taxes.
Purpose of Action:To consider NYAW's request to reconcile property taxes.
Issue Date, Action
03-28-18 Proposed
Agency I.D No. PSC-14-18-00006
Subject Matter: Petition for abandonment
Purpose of Action:To consider the abandonment of Willsboro Bay Water Company's water system
Issue Date, Action
04-04-18 Proposed
Agency I.D No. PSC-15-18-00008
Subject Matter: Amendments to the Uniform Business Practices.
Purpose of Action:Consideration of revised consumer protections and business practices of energy service companies.
Issue Date, Action
04-11-18 Proposed
Agency I.D No. PSC-17-18-00010
Subject Matter: Petition for use of gas metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of gas usage.
Issue Date, Action
04-25-18 Proposed
Agency I.D No. PSC-18-18-00009
Subject Matter: Transfer of control of Keene Valley Video Inc.
Purpose of Action:To ensure performance in accordance with applicable cable laws, regulations and standards and the public interest
Issue Date, Action
05-02-18 Proposed
Agency I.D No. PSC-19-18-00005
Subject Matter: Whether Flanders' can market to and enroll new customers.
Purpose of Action:To protect customers by enforcing compliance with the Uniform Business Practices.
Issue Date, Action
05-09-18 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-20-18-00008
Subject Matter: Proposed major rate increase in O&R's gas delivery revenues of approximately $4.5 million (or 1.5% in total revenues)
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences
Issue Date, Action
05-16-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-20-18-00009
Subject Matter: Proposed major rate increase in O&R's electric delivery revenues of approximately $20.3 million (or 2.3% in total revenues)
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences
Issue Date, Action
05-16-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-21-18-00044
Subject Matter: Electric ratemaking policy for Direct Current Fast Charging (DCFC) facilities used to recharge electric vehicles.
Purpose of Action:To ensure just and reasonable rates in the context of charging electric vehicles.
Issue Date, Action
05-23-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-22-18-00007
Subject Matter: Intent to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
05-30-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PSC-22-18-00008
Subject Matter: Intent to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
05-30-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-23-18-00006
Subject Matter: Whether to impose consequences on Aspirity for its non-compliance with Commission requirements.
Purpose of Action:To ensure the provision of safe and adequate energy service at just and reasonable rates.
Issue Date, Action
06-06-18 Proposed
Agency I.D No. PSC-23-18-00010
Subject Matter: Community Distributed Generation project rules.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
06-06-18 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-23-18-00011
Subject Matter: Proposed rate filing in Hudson Valley Water Companies, Inc.'s annual revenues of approximately $24,370 or 13.0%.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-06-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-23-18-00014
Subject Matter: Proposed major rate increase of approximately $11.7 million to cover its Franklin and St. Lawrence Counties expansion project.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-06-18 Proposed
Agency I.D No. PSC-24-18-00013
Subject Matter: Implementation of program rules for Renewable Energy Standard and ZEC requirements.
Purpose of Action:To promote and maintain renewable and zero-emission electric energy resources.
Issue Date, Action
06-13-18 Proposed
Agency I.D No. PSC-24-18-00015
Subject Matter: To determine the use of investments to be made in lieu of a penalty action.
Purpose of Action:Commission oversight of electric and gas distribution companies and safe and adequate service.
Issue Date, Action
06-13-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-26-18-00015
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections.
Issue Date, Action
06-27-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PSC-28-18-00004
Subject Matter: The 2017 Outcome-based EAM Collaborative Report.
Purpose of Action:To ensure the establishment of fair and equitable metrics, targets and associated incentive levels.
Issue Date, Action
07-11-18 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-28-18-00005
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and energy efficiency protections are in place.
Issue Date, Action
07-11-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-28-18-00006
Subject Matter: Roadmap recommendations for the installation of qualified energy storage systems.
Purpose of Action:To encourage energy storage deployment and establish a 2030 target and deployment program.
Issue Date, Action
07-11-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-28-18-00011
Subject Matter: Storm Hardening Collaborative Report.
Purpose of Action:To ensure safe and adequate gas service.
Issue Date, Action
07-11-18 Proposed
Agency I.D No. PSC-28-18-00012
Subject Matter: Transfer of certain street lighting facilities.
Purpose of Action:To transfer street lighting facilities for the benefit of ratepayers.
Issue Date, Action
07-11-18 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-28-18-00013
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
07-11-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. PSC-29-18-00008
Subject Matter: Participation in Targeted Accessibility Fund
Purpose of Action:To encourage enhanced services for low-income consumers
Issue Date, Action
07-18-18 Proposed
Agency I.D No. PSC-29-18-00009
Subject Matter: Overvaluing real property tax expense recovery in water rates
Purpose of Action:To prevent unjust and unreasonable water rates
Issue Date, Action
07-18-18 Proposed
Agency I.D No. PSC-30-18-00004
Subject Matter: Ownership of St. Lawrence Gas Company, Inc.
Purpose of Action:To consider whether a proposed transfer of ownership interests in St. Lawrence Gas Company, Inc. is in the public interest.
Issue Date, Action
07-25-18 Proposed
Agency I.D No. PSC-30-18-00005
Subject Matter: Petition for use of gas metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of gas usage.
Issue Date, Action
07-25-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. PSC-30-18-00006
Subject Matter: Petition for use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
07-25-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. PSC-31-18-00011
Subject Matter: Petition for the use of gas metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of gas usage.
Issue Date, Action
08-01-18 Proposed
Agency I.D No. PSC-31-18-00012
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
08-01-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-31-18-00013
Subject Matter: To test rate structures for SC 1 and 2 that more closely align delivery rates with the cost of providing delivery service.
Purpose of Action:To provide residential and small commercial customers the opportunity to better manage their energy costs.
Issue Date, Action
08-01-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-32-18-00013
Subject Matter: Energy efficiency programs and targets for investor-owned utilities.
Purpose of Action:To encourage energy conservation and the delivery and procurement of energy services by investor-owned utilities.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-32-18-00014
Subject Matter: Petition for clarification and rehearing of the Rate Order.
Purpose of Action:To encourage energy efficiency measures and right of way maintenance and to ensure just and reasonable rates.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
03-13-19 Withdrawn
Agency I.D No. PSC-32-18-00017
Subject Matter: Rules for Value Stack compensation of hybrid storage and distributed generation.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
08-08-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-34-18-00010
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
08-22-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. PSC-34-18-00011
Subject Matter: Compensation of distributed energy resources.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
08-22-18 Proposed
Agency I.D No. PSC-34-18-00014
Subject Matter: Continued implementation of the Clean Energy Standard.
Purpose of Action:To promote and maintain renewable and zero-emission electric energy resources.
Issue Date, Action
08-22-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-34-18-00015
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and energy efficiency protections are in place.
Issue Date, Action
08-22-18 Proposed
Agency I.D No. PSC-34-18-00016
Subject Matter: Deferral of pre-staging and mobilization storm costs.
Purpose of Action:To ensure just and reasonable rates for ratepayers and utility recovery of unexpected, prudently incurred costs.
Issue Date, Action
08-22-18 Proposed
Agency I.D No. PSC-35-18-00003
Subject Matter: Con Edison's 2018 DSIP and BCA Handbook Update.
Purpose of Action:To continue Con Edison's transition to a modern utility serving as a Distributed System Platform Provider.
Issue Date, Action
08-29-18 Proposed
Agency I.D No. PSC-35-18-00005
Subject Matter: NYSEG and RG&E's 2018 DSIP and BCA Handbook Update.
Purpose of Action:To continue NYSEG and RG&E's transition to modern utilities acting as Distributed System Platform Providers.
Issue Date, Action
08-29-18 Proposed
Agency I.D No. PSC-35-18-00006
Subject Matter: National Grid's 2018 DSIP and BCA Handbook Update.
Purpose of Action:To continue National Grid's transition to a modern utility serving as a Distributed System Platform Provider.
Issue Date, Action
08-29-18 Proposed
Agency I.D No. PSC-35-18-00008
Subject Matter: Central Hudson's 2018 DSIP and BCA Handbook Update.
Purpose of Action:To continue Central Hudson's transition to a modern utility serving as a Distributed System Platform Provider.
Issue Date, Action
08-29-18 Proposed
Agency I.D No. PSC-35-18-00009
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
08-29-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-35-18-00010
Subject Matter: O&R's 2018 DSIP and BCA Handbook Update.
Purpose of Action:To continue O&R's transition to a modern utility acting as a Distributed System Platform Provider.
Issue Date, Action
08-29-18 Proposed
Agency I.D No. PSC-36-18-00004
Subject Matter: Update of revenue targets.
Purpose of Action:To update NYAW's revenue targets and make required balancing revisions to account for changes to the property tax targets.
Issue Date, Action
09-05-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-36-18-00005
Subject Matter: Permanent operator of gas wells and certain gas facilities.
Purpose of Action:To resolve ownership of overlapping gas facilities associated with wells transferred to two gas companies.
Issue Date, Action
09-05-18 Proposed
Agency I.D No. PSC-36-18-00006
Subject Matter: Recording of unbilled revenue.
Purpose of Action:To correct revenue target discrepancies resulting from changes in billing schedule and net billing days.
Issue Date, Action
09-05-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-36-18-00007
Subject Matter: PSC regulation 16 NYCRR § 86.3(a)(1).
Purpose of Action:To consider a waiver of a certain regulation relating to the content of an application for transmission line siting.
Issue Date, Action
09-05-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-37-18-00003
Subject Matter: Service Classification No. 7 - Sale of Standby Service to Customers with On-Site Generation Facilities.
Purpose of Action:To expand eligibility to customers across multiple buildings connected to a generating facility by a private thermal loop.
Issue Date, Action
09-12-18 Proposed
Agency I.D No. PSC-37-18-00004
Subject Matter: Acceleration of the return of tax savings to ratepayers.
Purpose of Action:To determine the timetable for returning tax savings to ratepayers.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-37-18-00005
Subject Matter: Notice of intent to submeter electricity and waiver request.
Purpose of Action:To ensure adequate submetering equipment, consumer protections and energy efficiency protections are in place.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-37-18-00006
Subject Matter: Disposition of tax refunds received by New York American Water Company, Inc.
Purpose of Action:To determine the disposition of tax refunds and other related matters.
Issue Date, Action
09-12-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-38-18-00001
Subject Matter: Waiver request of Opinion No. 76-17 and 16 NYCRR Part 96.
Purpose of Action:To consider not requiring living units of the facility to be metered.
Issue Date, Action
09-19-18 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-39-18-00004
Subject Matter: To establish Rider J - Smart Home Rate.
Purpose of Action:To provide residential customers the opportunity to better manage their energy costs.
Issue Date, Action
09-26-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-39-18-00005
Subject Matter: Participation in New York State Lifeline Program.
Purpose of Action:To encourage enhanced services for low-income customers.
Issue Date, Action
09-26-18 Proposed
Agency I.D No. PSC-39-18-00006
Subject Matter: To establish Rider AB - Smart Home Rate.
Purpose of Action:To provide residential customers the opportunity to better manage their energy costs.
Issue Date, Action
09-26-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-39-18-00007
Subject Matter: To implement enhanced safety pilot programs and energy efficiency initiatives.
Purpose of Action:To provide customers with enhanced safety and environmental benefits.
Issue Date, Action
09-26-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-39-18-00008
Subject Matter: Payment of fire protection costs.
Purpose of Action:To shift the costs of municipal fire protection service from the City of Rye to its residents.
Issue Date, Action
09-26-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-39-18-00009
Subject Matter: Authorization for one time credits to displaced customers.
Purpose of Action:To compensate displaced Con Edison ratepayers for their loss of service.
Issue Date, Action
09-26-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-40-18-00013
Subject Matter: Commission programs for meter service providers and meter data service providers.
Purpose of Action:To prevent confusion from maintaining unnecessary programs.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-40-18-00014
Subject Matter: Annual Reconciliation of Gas Expenses and Gas Cost Recoveries.
Purpose of Action:To review the gas utilities’ reconciliation of Gas Expenses and Gas Cost Recoveries for 2018.
Issue Date, Action
10-03-18 Proposed
Agency I.D No. PSC-40-18-00015
Subject Matter: Proposed rate filing to increase annual revenues.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
10-03-18 Proposed
Agency I.D No. PSC-40-18-00016
Subject Matter: Proposed transfer of the Company’s assets to the Town and dissolution of the Company.
Purpose of Action:To determine if transfer of the water system to the Town of Delaware is in the public interest.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-40-18-00017
Subject Matter: To modify provisions for Interruptible Gas under SC Nos. 9 and 12, P.S.C. No. 9 - Gas.
Purpose of Action:To amend certain penalties for non-compliant Interruptible Service Customers.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
01-02-19 Finalized
Agency I.D No. PSC-40-18-00018
Subject Matter: Waiver of PSC regulations, 16 NYCRR Sections 86.3(a)(2), (b)(2) and 88.4(a)(4).
Purpose of Action:To ensure that adequate maps and system studies support the application.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-40-18-00019
Subject Matter: Issuance of long-term debt securities.
Purpose of Action:To provide funding for safety and reliability capital projects, maturing debt, and refinancing variable rate to fixed rate debt.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-40-18-00020
Subject Matter: Issuance of long-term debt securities.
Purpose of Action:To provide funding for safety and reliability capital projects, maturing debt, and refinancing variable rate to fixed rate debt.
Issue Date, Action
10-03-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-41-18-00003
Subject Matter: Initial Tariff Schedule, P.S.C. No. 1 - Water and waiver of rate setting authority
Purpose of Action:To provide the rates, rules, and regulations under which water service will be provided to the customers of the system
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-41-18-00004
Subject Matter: Internal reorganization and stock transfer
Purpose of Action:To determine if the proposed reorganization and stock transfer is in the public interest and beneficial to ratepayers
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-41-18-00005
Subject Matter: Authorization to enter into a long-term loan agreement
Purpose of Action:For system improvements and full repayment of existing loan
Issue Date, Action
10-10-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-42-18-00009
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PSC-42-18-00010
Subject Matter: Rehearing and/or reconsideration of the Tax Charges Rate Treatment Order.
Purpose of Action:To determine if the Commission was correct to require small telecom utilities to defer ongoing tax savings.
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-42-18-00011
Subject Matter: Voluntary residential beneficial electrification rate design.
Purpose of Action:To provide efficient rate design for beneficial technologies in New York State that is equitable for all residential customers.
Issue Date, Action
10-17-18 Proposed
Agency I.D No. PSC-42-18-00012
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
10-17-18 Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. PSC-42-18-00013
Subject Matter: Petition for clarification and rehearing of the Smart Solutions Program Order.
Purpose of Action:To address the increased demand for natural gas in the Con Edison's service territory and the limited pipeline capacity.
Issue Date, Action
10-17-18 Proposed
Agency I.D No. PSC-42-18-00014
Subject Matter: The disposition of a refund from NYPA to the Village of Solvay of $733,000 for overcharge for electricity over several years.
Purpose of Action:To determine whether the proposed disposition of the NYPA refund is just and reasonable.
Issue Date, Action
10-17-18 Proposed
Agency I.D No. PSC-44-18-00008
Subject Matter: The New York State Reliability Council's revisions to its rules and measurements.
Purpose of Action:To adopt revisions to various rules and measurements of the New York State Reliability Council.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
03-06-19 Finalized
Agency I.D No. PSC-44-18-00009
Subject Matter: Water rates and charges.
Purpose of Action:To shift fire protection costs from the Town to its residents' water bills.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-44-18-00010
Subject Matter: Interruptible/Temperature Controlled gas service Collaborative report recommendations and tariff changes.
Purpose of Action:To consider the terms and conditions applicable to interruptible and temperature controlled gas service.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-44-18-00011
Subject Matter: Modifications to electric supply reconciliation mechanism.
Purpose of Action:To improve the reconciliation of supply-related costs for hourly-priced customers.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-44-18-00012
Subject Matter: Petition for approval of gas metering equipment.
Purpose of Action:To ensure that customer bills are based on accurate measurements of gas usage.
Issue Date, Action
10-31-18 Proposed
Agency I.D No. PSC-44-18-00013
Subject Matter: Petition for approval of gas metering equipment.
Purpose of Action:To ensure that customer bills are based on accurate measurements of gas usage.
Issue Date, Action
10-31-18 Proposed
Agency I.D No. PSC-44-18-00014
Subject Matter: Waiver of PSC regulations, 16 NYCRR sections 86.3(a)(1), (a)(2) and (b)(2).
Purpose of Action:To consider a waiver of certain regulations relating to the content of an application for transmission line siting.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-44-18-00015
Subject Matter: Con Edison's petition for the Non-Pipeline Solutions Portfolio and associated budget.
Purpose of Action:To pursue projects that continue service reliability and meet customer energy needs while aiding greenhouse gas reduction goals.
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-44-18-00016
Subject Matter: Petition for approval of gas metering equipment.
Purpose of Action:To ensure that customer bills are based on accurate measurements of gas usage.
Issue Date, Action
10-31-18 Proposed
Agency I.D No. PSC-45-18-00003
Subject Matter: Eliminating a financial incentive for utility performance, the interconnection earnings adjustment mechanism
Purpose of Action:To consider encouraging utility performance while creating customer savings
Issue Date, Action
11-07-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-45-18-00004
Subject Matter: Proposed transfer of two natural gas pipeline operating companies, and for lightened and incidental regulation
Purpose of Action:To consider transfer if there is no market power or ratepayer harm, incidental regulation, and continuing lightened regulation
Issue Date, Action
11-07-18 Proposed
Agency I.D No. PSC-45-18-00005
Subject Matter: Notice of intent to submeter electricity and waiver of energy audit
Purpose of Action:To ensure adequate submetering equipment, consumer protections and energy efficiency protections are in place
Issue Date, Action
11-07-18 Proposed
Agency I.D No. PSC-46-18-00005
Subject Matter: Proposed rate filing to increase annual revenues.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
11-14-18 Proposed
Agency I.D No. PSC-46-18-00013
Subject Matter: Acquisition of cable television assets and franchises.
Purpose of Action:To ensure continued service to Hamilton County Cable customers.
Issue Date, Action
11-14-18 Emergency/Proposed
Issue Date, Action
02-06-19 Finalized
Agency I.D No. PSC-47-18-00004
Subject Matter: Ampersand Cranberry Lake Hydro LLC's 500kw hydroelectric facility in the Town of Clifton, New York.
Purpose of Action:To promote and maintain renewable electric energy resources.
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-47-18-00005
Subject Matter: Waiver of certain rules pertaining to cable television franchise.
Purpose of Action:To determine whether to waive any rules and regulations.
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
02-27-19 Finalized
Agency I.D No. PSC-47-18-00006
Subject Matter: Modification of NMPC Estimating Metric project list.
Purpose of Action:To reflect an appropriate Estimating Metric project list for NMPC.
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-47-18-00007
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
11-21-18 Proposed
Agency I.D No. PSC-47-18-00008
Subject Matter: Proposed Public Policy Transmission Needs/Public Policy Requirements, as defined under the NYISO tariff.
Purpose of Action:To identify any proposed Public Policy Transmission Needs/Public Policy Requirements for referral to the NYISO.
Issue Date, Action
11-21-18 Proposed
Agency I.D No. PSC-48-18-00005
Subject Matter: Purchase of gas safety equipment for Westchester County fire departments
Purpose of Action:To provide Westchester County fire departments gas safety equipment they state they need to respond to odor reports
Issue Date, Action
11-28-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-49-18-00006
Subject Matter: Appointment of a temporary operator.
Purpose of Action:To determine if a temporary operator is needed to ensure the safe and adequate provision of water service.
Issue Date, Action
12-05-18 Emergency/Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-50-18-00002
Subject Matter: Waiver of tariff provision
Purpose of Action:To determine if it is the public interest to waive individual metering requirements for the planned senior housing
Issue Date, Action
12-12-18 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-50-18-00003
Subject Matter: Proposed transfer of interests in an electric generating facility and dedicated natural gas pipeline
Purpose of Action:To consider the transfer of generating facility and dedicated gas pipeline if there is no market power or ratepayer harm
Issue Date, Action
12-12-18 Proposed
Agency I.D No. PSC-50-18-00004
Subject Matter: Sale of street lighting facilities to the City of Albany
Purpose of Action:To determine whether to approve the transfer of street lighting facilities in the City of Albany
Issue Date, Action
12-12-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-50-18-00005
Subject Matter: Establishment of the regulatory regime applicable to an approximately 100 MW electric generating facility
Purpose of Action:To ensure appropriate regulation of a new electric corporation
Issue Date, Action
12-12-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-51-18-00011
Subject Matter: The 2018 Outcome-Based EAM Collaborative Report.
Purpose of Action:To ensure the establishment of fair and equitable metrics, targets and associated incentive levels.
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-51-18-00012
Subject Matter: Petition for water metering equipment.
Purpose of Action:To ensure that customer bills are based on accurate measurements of water usage.
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-51-18-00013
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. PSC-51-18-00014
Subject Matter: Consideration for the use of the expired CDP funds.
Purpose of Action:To provide potential customers affordable access to natural gas service.
Issue Date, Action
12-19-18 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-52-18-00006
Subject Matter: Standby Service Rates and Buyback Service Rates.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-52-18-00007
Subject Matter: Transfer of certain street lighting facilities.
Purpose of Action:To consider the transfer of certain street lighting facilities located in the City of Canandaigua.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-52-18-00008
Subject Matter: Minor rate filing.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
12-26-18 Proposed
Agency I.D No. PSC-52-18-00009
Subject Matter: Compensation of distributed energy resources.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-52-18-00010
Subject Matter: Installed Reserve Margin.
Purpose of Action:To ensure adequate levels of Installed Capacity.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
03-27-19 Finalized
Agency I.D No. PSC-52-18-00011
Subject Matter: LED Street Lighting.
Purpose of Action:To provide customers with more efficient, lower cost LED street lighting options.
Issue Date, Action
12-26-18 Proposed
Agency I.D No. PSC-52-18-00012
Subject Matter: Minor rate filing.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
12-26-18 Proposed
Agency I.D No. PSC-52-18-00013
Subject Matter: Compensation of distributed energy resources.
Purpose of Action:To ensure just and reasonable rates, including compensation, for distributed energy resources.
Issue Date, Action
12-26-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-01-19-00003
Subject Matter: Proposed revisions to RG&E's Dynamic Load Management Programs.
Purpose of Action:More efficient demand response programs to gain operational efficiency and shave peak demand.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-01-19-00004
Subject Matter: Advanced Metering Infrastructure.
Purpose of Action:To determine whether Niagara Mohawk Power Corporation d/b/a National Grid should implement advanced metering infrastructure.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-01-19-00005
Subject Matter: Proposed revisions to O&R's Dynamic Load Management Programs.
Purpose of Action:More efficient demand response programs to gain operational efficiency and shave peak demand.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-01-19-00006
Subject Matter: Proposed revisions to NYSEG's Dynamic Load Management Programs.
Purpose of Action:More efficient demand response programs to gain operational efficiency and shave peak demand.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-01-19-00007
Subject Matter: Northbrook Lyons Falls LLC's 3 hydro facilities with a combined capacity of 8.59 MW located in Mill, Gouldtown, and Kosterville.
Purpose of Action:To promote and maintain renewable electric energy resources.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-01-19-00008
Subject Matter: Proposed revisions to Central Hudson's Dynamic Load Management Programs.
Purpose of Action:More efficient demand response programs to gain operational efficiency and shave peak demand.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-01-19-00009
Subject Matter: Waiver of main extension rules, service territory extension and agreement for provision of service.
Purpose of Action:Whether a proposed agreement for the provision of water service by Saratoga Water Services, Inc. is in the public interest.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-01-19-00010
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-01-19-00011
Subject Matter: Proposed revisions to National Grid's Dynamic Load Management Programs.
Purpose of Action:More efficient demand response programs to gain operational efficiency and shave peak demand.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
04-03-19 Finalized
Agency I.D No. PSC-01-19-00012
Subject Matter: National Grid's electric Economic Development Programs.
Purpose of Action:To consider modifications to National Grid's economic development assistance programs.
Issue Date, Action
01-02-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-01-19-00013
Subject Matter: Order of the Commission related to caller ID unblocking.
Purpose of Action:To require telephone companies to unblock caller ID on calls placed to the 311 municipal call center in Suffolk County.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-01-19-00014
Subject Matter: To modify provisions for accepting new or additional gas service applications when there is inadequate supply or capacity.
Purpose of Action:To continue to provide safe and reliable service to existing customers.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-01-19-00015
Subject Matter: To modify provisions for accepting new or additional gas service applications when there is inadequate supply or capacity.
Purpose of Action:To continue to provide safe and reliable service to existing customers.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-01-19-00016
Subject Matter: To modify provisions for accepting new or additional gas service applications when there is inadequate supply or capacity.
Purpose of Action:To continue to provide safe and reliable service to existing customers.
Issue Date, Action
01-02-19 Proposed
Agency I.D No. PSC-02-19-00009
Subject Matter: The 2018 Electric Emergency Response Plans for electric utilities.
Purpose of Action:To consider the adequacy of the 2018 Electric Emergency Response Plans.
Issue Date, Action
01-09-19 Proposed
Agency I.D No. PSC-02-19-00010
Subject Matter: Transfer of street lighting facilities to the Village of Newark.
Purpose of Action:To consider whether the transfer of certain street lighting facilities to the Village of Newark is in the public interest.
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-02-19-00011
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-02-19-00012
Subject Matter: Unspent settlement funds to be used for future gas safety programs.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-02-19-00013
Subject Matter: Capacity Release Program.
Purpose of Action:To ensure safe and reliable service for customers at just and reasonable rates.
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-02-19-00014
Subject Matter: Petition for use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
01-09-19 Proposed
Agency I.D No. PSC-02-19-00015
Subject Matter: Limited waiver of remote net metering rule.
Purpose of Action:To address issues related to certain developers/customers with two sites in different load zones.
Issue Date, Action
01-09-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-03-19-00002
Subject Matter: DPS Staff White Paper for who must be trained in 16 NYCRR Part 753 requirements and how the Commission will approve trainings.
Purpose of Action:To reduce damage to underground utility facilities by requiring certain training and approving training curricula.
Issue Date, Action
01-16-19 Proposed
Agency I.D No. PSC-04-19-00003
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-04-19-00004
Subject Matter: Con Edison's petition for the Gas Innovation Program and associated budget.
Purpose of Action:To pursue programs that continue service reliability and meet customer energy needs while aiding greenhouse gas reduction goals.
Issue Date, Action
01-23-19 Proposed
Agency I.D No. PSC-04-19-00005
Subject Matter: The request of Cross-Sound Cable Company, LLC and Cross-Sound Cable Company (New York) LLC to increase authorized indebtedness.
Purpose of Action:To consider a petition to increase authorized indebtedness.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00006
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00007
Subject Matter: Minor rate filing.
Purpose of Action:To increase authorized indebtedness to provide funds for working capital and operations and maintenance.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-04-19-00008
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00009
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00010
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00011
Subject Matter: Update of revenue targets.
Purpose of Action:To ensure NYAW's rates are just and reasonable and accurately reflect the needed revenues.
Issue Date, Action
01-23-19 Proposed
Agency I.D No. PSC-04-19-00012
Subject Matter: Residential meter reading.
Purpose of Action:To remove notice requirement for a special meter read for the discontinuation of service to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00013
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00014
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00015
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00016
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00017
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00018
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00019
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00020
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00021
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00022
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00023
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00024
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-04-19-00025
Subject Matter: Customer Consent to Contact.
Purpose of Action:To include a new provision establishing customer consent for the utility to contact them electronically about utility service.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-04-19-00026
Subject Matter: Customer Consent to Contact.
Purpose of Action:To include a new provision establishing customer consent for the utility to contact them electronically about utility service.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-04-19-00027
Subject Matter: Customer Consent to Contact.
Purpose of Action:To include a new provision establishing customer consent for the utility to contact them electronically about utility service.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-04-19-00028
Subject Matter: Customer Consent to Contact.
Purpose of Action:To include a new provision establishing customer consent for the utility to contact them electronically about utility service.
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-05-19-00009
Subject Matter: Transfer of street lighting facilities
Purpose of Action:To consider whether the transfer of certain street lighting facilities is in the public interest
Issue Date, Action
01-30-19 Proposed
Agency I.D No. PSC-05-19-00010
Subject Matter: Waiver of certain rules, e.g.5-year buildout and 7-day installation requirements pertaining to cable television franchise
Purpose of Action:To determine whether to waive any rules and regulations
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-05-19-00011
Subject Matter: Notice of intent to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
05-15-19 Finalized
Agency I.D No. PSC-05-19-00012
Subject Matter: Waiver of certain rules, e.g.5-year buildout and 7-day installation requirements pertaining to cable television franchise
Purpose of Action:To determine whether to waive any rules and regulations
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-05-19-00013
Subject Matter: Issuance of long-term debt securities
Purpose of Action:To provide funding to reimburse the Company's treasury for moneys expended for capital purposes
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-05-19-00014
Subject Matter: Transfer of natural gas pipeline and request for lightened and incidental regulation
Purpose of Action:To grant lightened and incidental regulation to SABIC Innovative Plastics, LLC and approve the transfer of a gas pipeline
Issue Date, Action
01-30-19 Proposed
Agency I.D No. PSC-05-19-00015
Subject Matter: Transfer of street lighting facilities to the City of Cortland
Purpose of Action:To determine whether to transfer street lighting facilities located in the City of Cortland
Issue Date, Action
01-30-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-06-19-00005
Subject Matter: Consideration of the Joint Utilities' proposed BDP Program.
Purpose of Action:To to expand opportunities for low-income households to participate in Community Distributed Generation (CDG) projects.
Issue Date, Action
02-06-19 Proposed
Agency I.D No. PSC-06-19-00006
Subject Matter: Waiver of PSC regulations, 16 NYCRR sections 86.3(a)(1), 86.3(a)(2), and 86.4(b).
Purpose of Action:To consider a waiver of certain regulations related to an application for transmission line siting.
Issue Date, Action
02-06-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-06-19-00007
Subject Matter: Transfer of electric transmission assets, a substation, and approvals to Consolidated Edison Company of New York, Inc.
Purpose of Action:Consider the transfer of electric transmission assets, a substation, and related approvals as per prior orders and agreements.
Issue Date, Action
02-06-19 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. PSC-07-19-00009
Subject Matter: Whether to impose consequences on AAA for its non-compliance with Commission requirements.
Purpose of Action:To insure the provision of safe and adequate energy service at just and reasonable rates.
Issue Date, Action
02-13-19 Proposed
Agency I.D No. PSC-07-19-00010
Subject Matter: The rates and charges for non-roadway LED service offerings for outdoor lighting customers.
Purpose of Action:To determine whether to amend National Grid's P.S.C. No. 214 - Outdoor Lighting Tariff to provide new LED service offerings.
Issue Date, Action
02-13-19 Proposed
Agency I.D No. PSC-07-19-00011
Subject Matter: Amended Lease Agreement for space in the NYSEG facility.
Purpose of Action:Review of Amended Lease Agreement between NYSEG and Coughlin & Gerhart, LLP.
Issue Date, Action
02-13-19 Proposed
Agency I.D No. PSC-07-19-00012
Subject Matter: Initial Tariff Schedule, P.S.C. No. 1 - Water and waiver of rate setting authority.
Purpose of Action:To provide the rates, rules, and regulations under which water service will be provided to the customers of the system.
Issue Date, Action
02-13-19 Proposed
Agency I.D No. PSC-07-19-00013
Subject Matter: Transfer of street lighting facilities to the Town of Skaneateles.
Purpose of Action:To determine whether to authorize the transfer street lighting facilities to the Town of Skaneateles.
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-07-19-00014
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-07-19-00015
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-07-19-00016
Subject Matter: Participation in New York State Lifeline Program.
Purpose of Action:To encourage enhanced services for low-income customers.
Issue Date, Action
02-13-19 Proposed
Agency I.D No. PSC-08-19-00008
Subject Matter: Disposition of property tax refunds
Purpose of Action:To consider Verizon New York Inc.'s request to retain a portion of a property tax refund
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-08-19-00009
Subject Matter: Sale of Street Lighting Facilities to the Town of Rosendale
Purpose of Action:To consider the transfer of street lighting facilities to the Town of Rosendale
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-09-19-00006
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
02-27-19 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-09-19-00007
Subject Matter: Exemptions from standby rates.
Purpose of Action:To consider whether the standby rate exemptions proposed by the City of New York are reasonable and in the public interest.
Issue Date, Action
02-27-19 Proposed
Agency I.D No. PSC-09-19-00008
Subject Matter: Exemptions from standby rates.
Purpose of Action:To determine whether standby rate exemptions should be continued.
Issue Date, Action
02-27-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-09-19-00009
Subject Matter: Amendments to the tariff of Con Edison pertaining to interruptible gas service customers.
Purpose of Action:To consider the appropriate tariff provisions for Con Edison interruptible gas service customers.
Issue Date, Action
02-27-19 Proposed
Agency I.D No. PSC-09-19-00010
Subject Matter: Non-pipeline alternatives report recommendations.
Purpose of Action:To consider the terms and conditions applicable to gas service.
Issue Date, Action
02-27-19 Proposed
Agency I.D No. PSC-09-19-00011
Subject Matter: To request a waiver of the requirements of PSL Section 66-j(4)(c) regarding the annual payout process for excess generation.
Purpose of Action:Efficiency improvements to the annual payout process for excess generation.
Issue Date, Action
02-27-19 Proposed
Issue Date, Action
06-05-19 Finalized
Agency I.D No. PSC-09-19-00012
Subject Matter: Waiver of certain rules, i.e., 5-year buildout and 7-day installation requirements pertaining to cable television franchise.
Purpose of Action:To determine whether to waive any rules and regulations.
Issue Date, Action
02-27-19 Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-09-19-00013
Subject Matter: Cyber Security requirements.
Purpose of Action:Establish a framework to ensure the protection of utility systems and customer data from cyber events.
Issue Date, Action
02-27-19 Proposed
Agency I.D No. PSC-10-19-00005
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
03-06-19 Proposed
Agency I.D No. PSC-10-19-00006
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
03-06-19 Proposed
Agency I.D No. PSC-11-19-00002
Subject Matter: Notice of intent to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
03-13-19 Proposed
Agency I.D No. PSC-11-19-00003
Subject Matter: Transfer of street lighting facilities
Purpose of Action:To consider whether the transfer of certain street lighting facilities is in the public interest
Issue Date, Action
03-13-19 Proposed
Agency I.D No. PSC-11-19-00004
Subject Matter: Notice of intent to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
03-13-19 Proposed
Agency I.D No. PSC-12-19-00001
Subject Matter: Postponement of the levelization surcharge mechanism for Service Area 1 customers.
Purpose of Action:To reduce otherwise applicable charges in Rate Year 3 for Service Area 1 customers.
Issue Date, Action
03-20-19 Emergency/Proposed
Issue Date, Action
06-12-19 Finalized
Agency I.D No. PSC-12-19-00004
Subject Matter: To test innovative pricing proposals on an opt-out basis.
Purpose of Action:To provide pricing structures that deliver benefits to customers and promote beneficial electrification technologies.
Issue Date, Action
03-20-19 Proposed
Agency I.D No. PSC-12-19-00005
Subject Matter: The request to issue long-term debt securities.
Purpose of Action:To assume debt for general corporate purposes, including working capital and other financial requirements
Issue Date, Action
03-20-19 Proposed
Agency I.D No. PSC-12-19-00006
Subject Matter: Transfer of utility property.
Purpose of Action:To determine whether to approve the transfer of utility property.
Issue Date, Action
03-20-19 Proposed
Agency I.D No. PSC-13-19-00010
Subject Matter: New Commission requirements for gas company operator qualification programs.
Purpose of Action:To make pipelines safer with improved training of workers who perform construction and repairs on natural gas facilities.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00011
Subject Matter: Modifications to the Gas Cost Factor and Daily Delivery Service Programs.
Purpose of Action:To ensure safe and reliable service for customers at just and reasonable rates.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00012
Subject Matter: Paperless billing credit.
Purpose of Action:To provide just and reasonable rates.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00013
Subject Matter: To revise the voluntary residential time-of-use delivery rates for Rate Years 2 and 3 due to an inadvertent omission.
Purpose of Action:To provide accurate pricing structures that deliver benefits to customers.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00014
Subject Matter: Eligibility for annual per-plug incentives for DCFC stations.
Purpose of Action:To increase electric vehicle infrastructure penetration to accomplish New York's Zero Emission Vehicle adoption mandate.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00015
Subject Matter: Use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00016
Subject Matter: Transfer of street lighting facilities.
Purpose of Action:To determine whether to transfer street lighting facilities.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00017
Subject Matter: Use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00018
Subject Matter: Use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00019
Subject Matter: Pole attachment rates.
Purpose of Action:To provide just and reasonable pole attachment rates.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00020
Subject Matter: Petition to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00021
Subject Matter: Modifications to the Gas Supply Charge and Balancing Service Programs.
Purpose of Action:To ensure safe and reliable service for customers at just and reasonable rates.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-13-19-00022
Subject Matter: Transfer of street lighting facilities.
Purpose of Action:To consider whether the transfer of certain street lighting facilities is in the public interest.
Issue Date, Action
03-27-19 Proposed
Agency I.D No. PSC-14-19-00004
Subject Matter: Tariff amendments to revise demand-based Innovative Price Pilot rates downward to reflect corrected billing determinants.
Purpose of Action:To preserve the integrity of the Innovative Price Pilot so to ensure that the data collected will not be distorted.
Issue Date, Action
04-03-19 Emergency/Proposed
Agency I.D No. PSC-14-19-00008
Subject Matter: Residential meter reading
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers
Issue Date, Action
04-03-19 Proposed
Agency I.D No. PSC-15-19-00008
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
04-10-19 Proposed
Agency I.D No. PSC-15-19-00009
Subject Matter: Cancellation of Society's tariff.
Purpose of Action:To consider whether cancellation of Society's tariff is in the public service.
Issue Date, Action
04-10-19 Proposed
Agency I.D No. PSC-15-19-00010
Subject Matter: Tariff provisions for Interruptible and Off-Peak Firm Service Customers.
Purpose of Action:To amend certain penalties for non-compliant Interruptible and Off-Peak Firm Customers.
Issue Date, Action
04-10-19 Proposed
Agency I.D No. PSC-16-19-00001
Subject Matter: Waiver of certain rules, i.e., 5-year buildout and 7-day installation requirements pertaining to cable television franchise.
Purpose of Action:To determine whether to waive any rules and regulations.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00002
Subject Matter: NYSEG and RG&E Implementation Plan and audit recommendations.
Purpose of Action:To consider NYSEG and RG&E's Implementation Plan.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00003
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00004
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00005
Subject Matter: Proposed major electric delivery revenue requirement increase of approximately $485 million (or 4.6% in total revenues).
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00006
Subject Matter: Waiver of certain rules, i.e., 5-year buildout and 7-day installation requirements pertaining to cable television franchise.
Purpose of Action:To determine whether to waive any rules and regulations.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00007
Subject Matter: Recommencement of the levelization surcharge, changes to the System Improvement Charge, and a one-year stay-out.
Purpose of Action:To address the issues in NYAW's petition dated February 25, 2019.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-16-19-00008
Subject Matter: Proposed major rate increase in Con Edison's gas delivery revenues of approximately $210 million (or 9.1% in total revenues).
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
04-17-19 Proposed
Agency I.D No. PSC-17-19-00010
Subject Matter: Waiver of tariff rules and a related Commission regulation.
Purpose of Action:To consider whether a waiver of tariff rules and a Commission regulation are just and reasonable and in the public interest.
Issue Date, Action
04-24-19 Proposed
Agency I.D No. PSC-17-19-00011
Subject Matter: Purchased power adjustment.
Purpose of Action:To ensure existing customers are not harmed by an increase in rates attributable to any incremental supply.
Issue Date, Action
04-24-19 Proposed
Agency I.D No. PSC-17-19-00012
Subject Matter: Establishment of a consumer awareness program to encourage renewable energy resources and energy efficiencies in Westchester.
Purpose of Action:To encourage clean energy development in Westchester.
Issue Date, Action
04-24-19 Proposed
Agency I.D No. PSC-17-19-00013
Subject Matter: Tariff amendments regarding minimum monthly storage inventory levels.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
04-24-19 Proposed
Agency I.D No. PSC-17-19-00014
Subject Matter: Minor rate filing.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
04-24-19 Proposed
Agency I.D No. PSC-18-19-00010
Subject Matter: Energy efficiency programs, budgets, and targets for investor-owned utilities.
Purpose of Action:To encourage the delivery and procurement of energy efficiency by investor-owned utilities.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-18-19-00011
Subject Matter: Policies, budgets and targets for support of heat pump deployment by investor-owned utilities.
Purpose of Action:To encourage the support for heat pump deployment by investor-owned utilities.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-18-19-00012
Subject Matter: Policies, budgets and targets for support of energy effiency programs for low- and moderate-income customers.
Purpose of Action:To encourage the support of energy effiency programs for low- and moderate-income customers by investor-owned utilities.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-18-19-00013
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-18-19-00014
Subject Matter: Revenue neutral revenue adjustment to the demand and energy charges under SC No. 3.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-18-19-00015
Subject Matter: Minor rate filing.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
05-01-19 Proposed
Agency I.D No. PSC-19-19-00011
Subject Matter: To consider a settlement agreement.
Purpose of Action:Modification of Network Expansion Condition.
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-19-19-00012
Subject Matter: Minor rate filing.
Purpose of Action:To ensure that the Village of Silver Spring provides safe and adequate service and that its rates are just and reasonable.
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-19-19-00013
Subject Matter: Proposed merger of three water utilities into one corporation.
Purpose of Action:To determine if the proposed merger is in the public interest.
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-19-19-00014
Subject Matter: Establishment of the regulatory regime applicable to an approximately 124 MW electric generating facility.
Purpose of Action:Consideration of a lightened regulatory regime for an approximately 124 MW electric generating facility.
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-19-19-00015
Subject Matter: Establishment of the regulatory regime applicable to an energy storage facility of up to 316 MW.
Purpose of Action:Consideration of a lightened regulatory regime for an energy storage facility of up to 316 MW
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-19-19-00016
Subject Matter: Establishment of the regulatory regime applicable to an approximately 242 MW electric generating facility.
Purpose of Action:Consideration of a lightened regulatory regime for an approximately 242 MW electric generating facility.
Issue Date, Action
05-08-19 Proposed
Agency I.D No. PSC-20-19-00008
Subject Matter: Reporting on energy sources
Purpose of Action:To ensure accurate reporting and encourage clean energy purchases
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00009
Subject Matter: Petition to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00010
Subject Matter: Compensation policies for certain CHP projects
Purpose of Action:To consider appropriate rules for compensation of certain CHP resources
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00011
Subject Matter: Petition to submeter electricity
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00012
Subject Matter: Waiver of 16 NYCRR Section 894.4(b)(2) pertaining to publishing notice of the RFP in national publications
Purpose of Action:To determine whether to waive any rules and regulations
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00013
Subject Matter: Notice of intent to submeter electricity and waiver of energy audit
Purpose of Action:To ensure adequate submetering equipment, consumer protections and energy efficiency protections are in place
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00014
Subject Matter: Transfer of street lighting facilities
Purpose of Action:To consider the transfer of street lighting facilities to the City of Oneonta
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-20-19-00015
Subject Matter: Establishment of the regulatory regime applicable to an approximately 105.8 MW electric generating facility
Purpose of Action:Consideration of a lightened regulatory regime for an approximately 105.8 MW electric generating facility
Issue Date, Action
05-15-19 Proposed
Agency I.D No. PSC-21-19-00015
Subject Matter: The Implementation Plan used to recover the costs of ZECs from Load Serving Entities.
Purpose of Action:To more accurately calculate Load Serving Entities' future ZEC obligation payments.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. PSC-21-19-00016
Subject Matter: Use of electric metering equipment.
Purpose of Action:To ensure that consumer bills are based on accurate measurements of electric usage.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. PSC-21-19-00017
Subject Matter: Residential meter reading.
Purpose of Action:To establish provisions for a special meter read for when service is discontinued to residential customers.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. PSC-21-19-00018
Subject Matter: Methodology used to set discount level for income-based discounts to residential electric and gas utility bills.
Purpose of Action:To ensure that income-based discounts are adjusted in a manner that moderates annual changes.
Issue Date, Action
05-22-19 Proposed
Agency I.D No. PSC-22-19-00011
Subject Matter: Proposed major increase in KEDNY's gas delivery revenues by $236.8 million (13.6% increase in total revenues).
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
05-29-19 Proposed
Agency I.D No. PSC-22-19-00012
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
05-29-19 Proposed
Agency I.D No. PSC-22-19-00013
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
05-29-19 Proposed
Agency I.D No. PSC-22-19-00014
Subject Matter: Proposed major rate increase in KEDLI's gas delivery revenues by $49.4 million (4.1% increase in total revenues).
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
05-29-19 Proposed
Agency I.D No. PSC-23-19-00003
Subject Matter: Ownership interest in poles.
Purpose of Action:To consider the transfer of ownership interest in certain poles from NYSEG to Verizon.
Issue Date, Action
06-05-19 Proposed
Agency I.D No. PSC-23-19-00004
Subject Matter: Individually negotiated contracts.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-05-19 Proposed
Agency I.D No. PSC-23-19-00005
Subject Matter: Proposed major rate increase in SWNY's annual base revenues of approximately $31.5 million (or 19.8% in total revenues).
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-05-19 Proposed
Agency I.D No. PSC-24-19-00003
Subject Matter: Three-year pilot for inspecting gas services at intervals longer than existing regulations require.
Purpose of Action:To use risk-based reasoning for gas service lines inspection intervals on a pilot basis.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00004
Subject Matter: Municipal Gross Receipts Taxes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00005
Subject Matter: Non-Firm Demand Response service classes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00006
Subject Matter: Municipal Gross Receipts Taxes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00007
Subject Matter: Municipal Gross Receipts Taxes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00008
Subject Matter: Non-Firm Demand Response service classes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-24-19-00009
Subject Matter: Municipal Gross Receipts Taxes.
Purpose of Action:To ensure safe and adequate service at just and reasonable rates charged to customers without undue preferences.
Issue Date, Action
06-12-19 Proposed
Agency I.D No. PSC-25-19-00016
Subject Matter: The request of New York Transco LLC to assume debt with a repayment period that exceeds 12 months.
Purpose of Action:To consider a petition to incur debt.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. PSC-25-19-00017
Subject Matter: Notice of intent to submeter electricity.
Purpose of Action:To ensure adequate submetering equipment and consumer protections are in place.
Issue Date, Action
06-19-19 Proposed
Agency I.D No. PSC-26-19-00002
Subject Matter: Petition to submeter electricity and waiver of energy audit
Purpose of Action:To ensure adequate submetering equipment, consumer protections and energy efficiency protections are in place
Issue Date, Action
06-26-19 Proposed
Top
DEPARTMENT OF STATE
Agency I.D No. DOS-31-17-00005
Subject Matter: Continuing education requirements
Purpose of Action:To amend the education requirements to include 1 hour of instruction on telecoil (t-coil) and other assistive listening devices
Issue Date, Action
08-02-17 Proposed
Issue Date, Action
12-20-17 Finalized
Agency I.D No. DOS-36-18-00008
Subject Matter: New York State Uniform Fire Prevention and Building Code (the Uniform Code)
Purpose of Action:To amend the existing Uniform Code to add provisions for diaper changing stations in certain buildings.
Issue Date, Action
09-05-18 Proposed
Issue Date, Action
12-26-18 Finalized
Agency I.D No. DOS-07-19-00008
Subject Matter: Education and Experience Requirements for Original Appraiser Applications
Purpose of Action:To conform existing regulations to current federal guidelines
Issue Date, Action
02-13-19 Proposed
Issue Date, Action
05-01-19 Finalized
Agency I.D No. DOS-23-19-00001
Subject Matter: Prospective licensee requirements
Purpose of Action:To conform current NYS standards to existing applicable federal requirements for licensure
Issue Date, Action
06-05-19 Proposed
Top
STATE UNIVERSITY OF NEW YORK
Agency I.D No. SUN-44-18-00003
Subject Matter: Proposed amendments to the traffic and parking regulations at State University College at Oneonta
Purpose of Action:Amend existing regulations to update traffic and parking regulations
Issue Date, Action
10-31-18 Proposed
Issue Date, Action
05-08-19 Finalized
Agency I.D No. SUN-49-18-00008
Subject Matter: University Faculty Senate
Purpose of Action:To clarify that the vice-president/secretary of the University Faculty Senate ("UFS") shall be a voting member of the UFS
Issue Date, Action
12-05-18 Proposed
Issue Date, Action
04-10-19 Finalized
Agency I.D No. SUN-15-19-00007
Subject Matter: Proposed amendments to Appointment of Employees and Leave of Absences for Employees in the Professional Service.
Purpose of Action:Allow a temporary cessation of service credit during birth/adoption/foster care placement of child and update leave accruals.
Issue Date, Action
04-10-19 Proposed
Top
DEPARTMENT OF TAXATION AND FINANCE
Agency I.D No. TAF-48-18-00003
Subject Matter: Fuel use tax on motor fuel and diesel motor fuel and the art. 13-A carrier tax jointly administered therewith
Purpose of Action:To set the sales tax component and the composite rate per gallon for the period January 1, 2019 through March 31, 2019
Issue Date, Action
11-28-18 Proposed
Issue Date, Action
02-20-19 Finalized
Agency I.D No. TAF-48-18-00004
Subject Matter: Metropolitan Transportation Business Tax Surcharge
Purpose of Action:To provide metropolitan transportation business tax rate for tax year 2019
Issue Date, Action
11-28-18 Emergency/Proposed
Issue Date, Action
02-13-19 Finalized
Agency I.D No. TAF-49-18-00007
Subject Matter: The Congestion Surcharge.
Purpose of Action:To implement the Congestion Surcharge and related registration, records and reporting requirements.
Issue Date, Action
12-05-18 Emergency
Agency I.D No. TAF-08-19-00007
Subject Matter: Fuel use tax on motor fuel and diesel motor fuel and the art. 13-A carrier tax jointly administered therewith
Purpose of Action:To set the sales tax component and the composite rate per gallon for the period April 1, 2019 through June 30, 2019
Issue Date, Action
02-20-19 Proposed
Issue Date, Action
05-22-19 Finalized
Agency I.D No. TAF-09-19-00005
Subject Matter: The Congestion Surcharge.
Purpose of Action:To implement the Congestion Surcharge and related registration, recordkeeping and reporting requirements.
Issue Date, Action
02-27-19 Emergency/Proposed
Issue Date, Action
05-01-19 Emergency
Issue Date, Action
06-26-19 Emergency
Agency I.D No. TAF-21-19-00006
Subject Matter: Fuel use tax on motor fuel and diesel motor fuel and the art. 13-A carrier tax jointly administered therewith.
Purpose of Action:To set the sales tax component and the composite rate per gallon for the period July 1, 2019 through September 30, 2019.
Issue Date, Action
05-22-19 Proposed
Top
OFFICE OF TEMPORARY AND DISABILITY ASSISTANCE
Agency I.D No. TDA-12-18-00004
Subject Matter: Reengagement/conciliation and sanction procedures for employment programs
Purpose of Action:To implement statutory changes relative to public assistance (PA) reengagement/conciliation and sanction procedures
Issue Date, Action
03-21-18 Proposed
Issue Date, Action
01-09-19 Finalized
Agency I.D No. TDA-41-18-00002
Subject Matter: Standard Utility Allowances (SUAs) for the Supplemental Nutrition Assistance Program (SNAP)
Purpose of Action:These regulatory amendments set forth the federally-mandated and approved SUAs as of 10/1/18
Issue Date, Action
10-10-18 Emergency/Proposed
Issue Date, Action
12-19-18 Emergency
Issue Date, Action
01-30-19 Finalized
Agency I.D No. TDA-49-18-00009
Subject Matter: Outreach, Homeless Services Plans and Outcome Reporting
Purpose of Action:To promote effective planning and strategic use of resources by social service districts
Issue Date, Action
12-05-18 Emergency/Proposed
Issue Date, Action
02-13-19 Emergency
Issue Date, Action
03-27-19 Finalized
Agency I.D No. TDA-14-19-00002
Subject Matter: Enforcement of support obligations and issuance of income withholding orders (IWOs)
Purpose of Action:To clarify the requirements for income withholding for persons served by the Title IV-D child support program (IV-D) to conform with changes to the federal IV-D IWO/Notice for Support form
Issue Date, Action
04-03-19 Proposed
Agency I.D No. TDA-14-19-00007
Subject Matter: Abandonment of requests for fair hearings
Purpose of Action:To require the issuance of letters to appellants who fail to appear at scheduled fair hearings involving Medical Assistance, also known as Medicaid, advising them how to request the rescheduling of such fair hearings
Issue Date, Action
04-03-19 Proposed
Agency I.D No. TDA-19-19-00007
Subject Matter: Adult-Care Facilities and Shelters for Adults
Purpose of Action:To update State regulations pertaining to general provisions, inspections and enforcement, and shelters for adults
Issue Date, Action
05-08-19 Proposed
Agency I.D No. TDA-19-19-00008
Subject Matter: Shelters for Families
Purpose of Action:To update State regulations pertaining to shelters for families
Issue Date, Action
05-08-19 Proposed
Agency I.D No. TDA-19-19-00010
Subject Matter: Elimination of finger imaging requirement for public assistance applicants and recipients
Purpose of Action:To update State regulations to align public assistance programs with other State benefit programs regarding identification verification requirements
Issue Date, Action
05-08-19 Proposed
Top
DEPARTMENT OF TRANSPORTATION
Agency I.D No. TRN-47-18-00001
Subject Matter: Regulation of transportation of hazardous materials by commercial motor carriers in New York State
Purpose of Action:Corrects omissions in State regulations associated with Title 49 CFR provisions related to transport of hazardous materials
Issue Date, Action
11-21-18 Proposed
Issue Date, Action
02-20-19 Finalized
Agency I.D No. TRN-03-19-00001
Subject Matter: Regulation of commercial motor carriers in New York State
Purpose of Action:The rule making updates Title 49 CFR provisions incorporated by reference pursuant to regulation of commercial motor carriers
Issue Date, Action
01-16-19 Emergency/Proposed
Issue Date, Action
03-20-19 Emergency
Issue Date, Action
04-24-19 Finalized
Top
TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY
Agency I.D No. TBA-49-18-00011
Subject Matter: A proposal to establish a new crossing charge schedule for use of bridges and tunnels operated by TBTA
Purpose of Action:A proposal to raise additional revenue
Issue Date, Action
12-05-18 Proposed
Issue Date, Action
03-20-19 Finalized
Top
URBAN DEVELOPMENT CORPORATION
Agency I.D No. UDC-45-18-00002
Subject Matter: Life Sciences Initiative Program
Purpose of Action:Implement Capital Assistance and NYFIRST components of the Life Sciences Initiatives program
Issue Date, Action
11-07-18 Emergency
Agency I.D No. UDC-08-19-00001
Subject Matter: Life Sciences Initiative Program
Purpose of Action:Amend NYFIRST component of the Life Sciences Initiatives program
Issue Date, Action
02-20-19 Emergency
Agency I.D No. UDC-21-19-00003
Subject Matter: Life Sciences Initiative Program
Purpose of Action:Amend NYFIRST component of the Life Sciences Initiatives program
Issue Date, Action
05-22-19 Emergency
Top
Agency I.D No. OVS-24-19-00001
Subject Matter: Conduct contributing related to burial awards
Purpose of Action:Adopt rules necessary as the result of chapter 494 of the Laws of 2018, when considering the victim's own conduct
Issue Date, Action
06-12-19 Emergency/Proposed
Top
WORKERS' COMPENSATION BOARD
Agency I.D No. WCB-52-17-00021
Subject Matter: Establishment of Prescription Drug Formulary
Purpose of Action:Establishment of a drug formulary that includes high-quality and cost-effective preauthorized medication
Issue Date, Action
12-27-17 Proposed
Issue Date, Action
10-17-18 Revised
Issue Date, Action
01-23-19 Revised
Issue Date, Action
04-17-19 Revised
Issue Date, Action
06-05-19 Finalized
Agency I.D No. WCB-23-18-00004
Subject Matter: Fees for Medical Testimony
Purpose of Action:To increase fees for medical testimony and eliminate fee reductions for multiple appearances as this provisiosn is not used
Issue Date, Action
06-06-18 Proposed
Issue Date, Action
12-26-18 Finalized
Agency I.D No. WCB-23-18-00005
Subject Matter: Medical Fee Schedules
Purpose of Action:Update the fees paid for medical treatment in workers' compensation claims
Issue Date, Action
06-06-18 Proposed
Issue Date, Action
10-03-18 Revised
Issue Date, Action
12-26-18 Finalized
Agency I.D No. WCB-49-18-00010
Subject Matter: Pharmacy Fee Schedule
Purpose of Action:Update the pricing methodology for prescription drugs
Issue Date, Action
12-05-18 Proposed
Issue Date, Action
04-17-19 Finalized
Agency I.D No. WCB-04-19-00029
Subject Matter: Fees for emergency room, rural area outpatient clinics, hospital based mental health clinics and private psychiatric hospitals
Purpose of Action:Update and incorporate fees for medical services provided to injured workers
Issue Date, Action
01-23-19 Proposed
Issue Date, Action
05-01-19 Finalized
Agency I.D No. WCB-22-19-00009
Subject Matter: Group self-insured trusts that are inactive but not insolvent
Purpose of Action:Provide assistance with inactive but not insolvent group self-insured trusts to purchase ALPs to wind down liabilities
Issue Date, Action
05-29-19 Proposed
Agency I.D No. WCB-25-19-00018
Subject Matter: Prior authorization for medical treatment and variances form the Medical Treatment Guidelines
Purpose of Action:Add new authorized medical provider types to rules regarding prior authorizations and variances
Issue Date, Action
06-19-19 Proposed
Agency I.D No. WCB-25-19-00019
Subject Matter: Medical Provider Authorization
Purpose of Action:Describe the process for providers to become authorized by the Board and maintain authorization
Issue Date, Action
06-19-19 Proposed
End of Document