21 CRR-NY 508.9NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 21. MISCELLANEOUS
CHAPTER XI. NEW YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY
PART 508. GREEN RESIDENTIAL BUILDING PROGRAM
21 CRR-NY 508.9
21 CRR-NY 508.9
508.9 Application for program incentive.
(a) For an owner to receive a program incentive for a residential building with qualified occupied square footage, such owner shall submit an application before October 31, 2013, which shall include the following information:
(1) name and address of owner;
(2) residential building address(es);
(3) designation of the residential building as single family detached, townhouse, or multi-family and method of construction as built on-site, modular, or manufactured;
(4) for residential buildings with more than one dwelling unit, number of dwelling units for which a program incentive is requested and the total number of dwelling units in the structure;
(5) qualified occupied square footage of the dwelling unit;
(6) a copy of the certificate(s) of occupancy or a certificate(s) of completion;
(7) a copy of the residential building's:
(i) second or higher level LEED certification based on the LEED for Homes Rating System or LEED for New Construction Rating System; or
(ii) second or higher level NGBS certification;
(8) a written description of the work performed that earned the incentive, which shall include but not be limited to design and construction techniques used to obtain the points necessary to obtain the LEED or NGBS certification and the minimum energy efficient specifications and performance specifications;
(9) for residential buildings of not more than three stories containing four or fewer dwellings, with central air conditioners or heat pumps, a copy of the technician's determination on room airflows;
(10) a copy of the written records of inspections performed in accordance with the requirements of sections 508.5 and 508.7 of this Part;
(11) a copy of documentation showing that all technicians performing inspections meet the qualifications specified in section 508.8 of this Part; and
(12) a copy of documentation showing that the builder meets the training requirements specified in section 508.8 of this Part.
(b) Upon receipt of an application, if the authority determines that the application is incomplete, the authority shall notify the owner within 45 days of receipt of the application and describe the information that is needed to complete the application.
21 CRR-NY 508.9
Current through October 15, 2021
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: JULY 31, 2023, is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Admisnistrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of the NYS Rules.