363-11.5 Landfill footprint reduction.
Footprint reduction areas must be cleaned by completely removing waste and contaminated subbase soil from below the reclaimed area. If landfill reclamation results in a reduction of the landfill footprint, the following requirements must be met.
(a) A petition for the exclusion of the reclaimed landfill area from the closure, post-closure and custodial care criteria described in Subpart 363-9 of this Part may be submitted for approval by the department. The footprint reduction petition must include the following:
(1) details of the footprint reduction area in plan and cross-sectional views; and
(2) an in-situ subbase soil sampling plan that describes the number of samples, the method of sampling, and the analytical parameters and methods, and an evaluation of the sampling and analysis results.