6 CRR-NY 363-6.15NY-CRR
6 CRR-NY 363-6.15
6 CRR-NY 363-6.15
363-6.15 Gas venting.
The project engineer must demonstrate that landfill gas will be adequately controlled and removed from the landfill in a manner to ensure the overall stability of the landfill and its final cover system, and to reduce the concentration and pressure gradient of explosive gases to control gas migration.
6 CRR-NY 363-6.15
Current through March 15, 2022
End of Document |