6 CRR-NY 361-8.5NY-CRR
6 CRR-NY 361-8.5
6 CRR-NY 361-8.5
361-8.5 Design and operating requirements.
A processing facility required to obtain a permit must, in addition to the requirements identified in section 360.19 of this Title, design and operate the facility in compliance with the design and operating requirements in section 361-8.3 of this Subpart.
6 CRR-NY 361-8.5
Current through March 15, 2022
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.