6 CRR-NY 361-8.4NY-CRR
6 CRR-NY 361-8.4
6 CRR-NY 361-8.4
361-8.4 Permit application requirements.
A processing facility that is not an exempt facility or a facility subject to the registration provisions of section 361-8.3 of this Subpart must obtain a permit, and must submit an application that includes the requirements identified in section 360.16 of this Title and a description of how the facility will comply with the operating requirements in Part 360 of this Title and sections 361-8.5 and 361-8.6 of this Subpart.
6 CRR-NY 361-8.4
Current through March 15, 2022
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.