6 CRR-NY 361-4.5NY-CRR
6 CRR-NY 361-4.5
6 CRR-NY 361-4.5
361-4.5 Design and operating requirements.
A mulch processing facility required to obtain a permit must, in addition to the requirements identified in section 360.19 of this Title, design and operate the facility in compliance with the design and operating requirements specified in section 361-4.3 of this Subpart and the recordkeeping and reporting requirements of section 361-4.3 of this Subpart. Also, the facility must have stormwater and run-off controls that minimize the potential for organic matter to reach groundwater and surface water resources.
6 CRR-NY 361-4.5
Current through March 15, 2022
End of Document |