21 CRR-NY 1806.43NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 21. MISCELLANEOUS
CHAPTER XXIX. SUSQUEHANNA RIVER BASIN COMMISSION
PART 1806. REVIEW AND APPROVAL OF PROJECTS
REGISTRATION OF GRANDFATHERED PROJECTS
21 CRR-NY 1806.43
21 CRR-NY 1806.43
1806.43 Metering and monitoring requirements.
(a) As a part of the registration process, the commission shall review the current metering and monitoring for grandfathered withdrawals and consumptive uses.
(b) The commission may require a metering and monitoring plan for the project sponsor to follow.
(c) Project sponsors, as an ongoing obligation of their registration, shall report to the commission all information specified in the grandfathering determination under section 1806.44 of this Part in a form and manner determined by the commission. If water withdrawal and consumptive use quantity reporting is required by the member jurisdiction where the project is located, the commission shall accept that reported quantity to satisfy the requirements of this subdivision, unless the commission finds that additional data is needed that is not required by the member jurisdiction.
(d) Any data generated or collected under subdivision (c) of this section will be made available to the member jurisdictions in a manner and timeframe mutually agreeable to both the commission and the jurisdiction.
21 CRR-NY 1806.43
Current through May 31, 2021
End of Document