16 CRR-NY 255.1005NY-CRR
16 CRR-NY 255.1005
16 CRR-NY 255.1005
255.1005 Implementation requirements of a GDPIM plan.
No later than August 2, 2011 a gas distribution operator must develop and implement an GDPIM program that includes a written GDPIM plan as specified in section 255.1007 of this Part.
16 CRR-NY 255.1005
Current through March 31, 2022
End of Document |