6 CRR-NY 201-1.14NY-CRR
6 CRR-NY 201-1.14
6 CRR-NY 201-1.14
201-1.14 Certificates to operate.
The owner or operator of an existing facility operating under a certificate to operate and/or permit to construct is required to apply to the department for a registration or permit, as described in this Part, within 90 days of receiving written notification from the department.
6 CRR-NY 201-1.14
Current through December 31, 2021
End of Document |