21 CRR-NY 1806.15NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 21. MISCELLANEOUS
CHAPTER XXIX. SUSQUEHANNA RIVER BASIN COMMISSION
PART 1806. REVIEW AND APPROVAL OF PROJECTS
APPLICATION PROCEDURE
21 CRR-NY 1806.15
21 CRR-NY 1806.15
1806.15 Notice of application.
(a) Except with respect to subdivisions (h) and (i) of this section, any project sponsor submitting an application to the commission shall provide notice thereof to the appropriate agency of the member State, each municipality in which the project is located, and the county and the appropriate county agencies in which the project is located. The project sponsor shall also publish notice of submission of the application at least once in a newspaper of general circulation serving the area in which the project is located. The project sponsor shall also meet any of the notice requirements set forth in subdivisions (b) through (f) of this section, if applicable. All notices required under this section shall be provided or published no later than 20 days after submission of the application to the commission and shall contain a description of the project, its purpose, the requested quantity of water to be withdrawn, obtained from sources other than withdrawals, or consumptively used, and the address, electronic mail address, and phone number of the project sponsor and the commission. All such notices shall be in a form and manner as prescribed by the commission.
(b) For withdrawal applications submitted pursuant to section 1806.4(a)(2) of this Part, the project sponsor shall also provide the notice required under subdivision (a) of this section to each property owner listed on the tax assessment rolls of the county in which such property is located and identified as follows:
(1) for groundwater withdrawal applications, the owner of any property that is located within a one-half mile radius of the proposed withdrawal location;
(2) for surface water withdrawal applications, the owner of any property that is riparian or littoral to the body of water from which the proposed withdrawal will be taken and is within a one-half mile radius of the proposed withdrawal location;
(3) for groundwater withdrawal applications, the commission or executive director may allow notification of property owners through alternate methods where the property of such property owner is served by a public water supply.
(c) For projects involving a diversion of water out of the basin, the project sponsor shall also publish a notice of the submission of its application at least once in a newspaper of general circulation serving the area outside the basin where the project proposing to use the diverted water is located. For projects involving a diversion of water into the basin, the project sponsor shall also publish a notice of the submission of its application at least once in a newspaper of general circulation serving the area outside the basin where the withdrawal of water proposed for diversion is located.
(d) For applications submitted under section 1806.22(f)(13) of this Part for a public water supply source, the newspaper notice requirement contained in subdivision (a) of this section shall be satisfied by publication in a newspaper of general circulation in the area served by the public water supply.
(e) For applications submitted under section 1806.22(f)(13) of this Part for a wastewater discharge source, the newspaper notice requirement contained in subdivision (a) of this section shall be satisfied by publication in a newspaper of general circulation in each area within which the water obtained from such source will initially be used for natural hydrocarbon development.
(f) For applications submitted under section 1806.22(f)(14) of this Part for a hydrocarbon water storage facility, the newspaper notice requirement contained in subdivision (a) of this section shall be satisfied by publication in a newspaper of general circulation in the area in which the facility is located.
(g) The project sponsor shall provide the commission with a copy of the United States Postal Service return receipt or the verified return receipt from a comparable delivery service for the notifications to agencies of member states, municipalities and appropriate county agencies required under subdivision (a) of this section. The project sponsor shall also provide certification on a form provided by the commission that it has published the newspaper notice(s) required by this section and made the landowner notifications as required under subdivision (b) of this section, if applicable. Until these items are provided to the commission, processing of the application will not proceed. The project sponsor shall maintain all proofs of publication and records of notices sent under this section for the duration of the approval related to such notices.
(h) For Notices of Intent (NOI) seeking coverage under a general permit, the project sponsor shall provide the NOI to the appropriate agency of the member State and each municipality and county planning agency in which the project is located and any additional notice identified in the general permit.
(i) For applications for minor modifications, the project sponsor shall provide notice of the application to the appropriate agency of the member State and each municipality and county planning agency in which the project is located.
21 CRR-NY 1806.15
Current through May 31, 2021
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.