21 CRR-NY 155.2NY-CRR
21 CRR-NY 155.2
21 CRR-NY 155.2
155.2 Channel.
(a) Waterford to Oswego route.
Minimum bottom width, land line, earth
section
104 feet
Width of channel, water surface, land line, earth section
160 feet
Minimum bottom width, land line, rock section
120 feet
Bottom width of channel in canalized rivers, generally
200 feet
Design depth
14 feet
(b) All other routes.
Minimum bottom width, land line, earth section
75 feet
Width of channel, water surface, land line, earth section
123 feet
Minimum bottom width, land line, rock section
94 feet
Bottom width of channel in canalized rivers, generally
200 feet
Design depth
12 feet
(c) Change of depth notices are published by the Canal Corporation and can be obtained from the Canal Corporation, P.O. Box 189, Albany, NY 12201 or by accessing the Notices to Mariners posted on the Canal Corporation's website.
21 CRR-NY 155.2
Current through October 15, 2021
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: JULY 31, 2023, is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Admisnistrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of the NYS Rules.