18 CRR-NY 447.5NY-CRR
18 CRR-NY 447.5
18 CRR-NY 447.5
447.5 Notice to the department of the opening of an agency boarding home; periodic reports.
At least 15 days prior to the opening of an agency boarding home, the agency must submit to the department for review a report in duplicate as to compliance with section 447.2 of this Part. The report must include a diagram of the floor plan of the home, showing the dimensions and use of each room, the capacity of each sleeping room, and the locations of the following: toilet and bath fixtures; kitchen and laundry equipment; heating equipment; fire and smoke detection and alarm devices or systems; other fire protection equipment; and all means of egress. Reports as to continued compliance may be required periodically by the department.
18 CRR-NY 447.5
Current through July 31, 2021
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: JULY 31, 2023, is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Admisnistrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of the NYS Rules.