16 CRR-NY 753-4.13NY-CRR
16 CRR-NY 753-4.13
16 CRR-NY 753-4.13
753-4.13 Support and backfilling requirements.
Where an underground facility will be disturbed or uncovered by excavation or demolition, the operator of such facility shall indicate to the excavator any preferred means of support or protection required for such facility and any special backfilling requirements or provide any other guidance for protection of an underground facility. Such information shall be furnished to the excavator before the stated date of commencement of the work, if practical.
16 CRR-NY 753-4.13
Current through February 28, 2023
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: JULY 31, 2023, is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Admisnistrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of the NYS Rules.