16 CRR-NY 255.819NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 16. DEPARTMENT OF PUBLIC SERVICE
CHAPTER III. GAS UTILITIES
SUBCHAPTER C. SAFETY
PART 255. TRANSMISSION AND DISTRIBUTION OF GAS
ACCIDENTS AND LEAKS
16 CRR-NY 255.819
16 CRR-NY 255.819
255.819 Leaks: follow-up inspection.
(a) Each operator shall, upon completing a type 1, type 2A or type 2 leak repair to its underground facilities, conduct a follow-up inspection at least 14 days after but within 30 days of the repair to validate said repair.
(b) Follow-up inspections are not required for leak repairs completed by the replacement or insertion of an entire length of pipe or service line, or for the repair of leakage caused by contractor or third-party damage, provided a complete reevaluation of the leak area after completion of repairs verifies that no further indications of leakage exist.
(c) Remedial measures such as lubrication of valves or tightening of packing nuts on valves which seal leaks may be considered to be routine maintenance work and do not require a follow- up inspection.
(d) Appropriate records shall be kept.
16 CRR-NY 255.819
Current through March 31, 2022
End of Document