16 CRR-NY 255.611NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 16. DEPARTMENT OF PUBLIC SERVICE
CHAPTER III. GAS UTILITIES
SUBCHAPTER C. SAFETY
PART 255. TRANSMISSION AND DISTRIBUTION OF GAS
OPERATIONS
16 CRR-NY 255.611
16 CRR-NY 255.611
255.611 Change in class location: confirmation or revision of maximum allowable operating pressure.
(a) Within 60 days after the required study is completed, the operator shall submit a program for redesigning and/or testing the respective pipeline segments, or appropriate reduction of the maximum certified operating pressures thereof, to conform to the respective then current class locations, in accordance with this Part, or declare that the design, testing, and operation of the respective pipeline segments conform to the respective then current class locations.
(b) Where the hoop stress corresponding to the established maximum allowable operating pressure of a segment of pipeline is not commensurate with the present class location, and the segment is in satisfactory physical condition, the maximum allowable operating pressure of that segment of pipeline must be confirmed or revised.
(1) If the segment involved has been previously tested in place to at least 90 percent of its SMYS for a period of not less than eight hours, the maximum allowable operating pressure must be confirmed or reduced so that the corresponding hoop stress will not exceed 72 percent of SMYS in Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of SMYS in Class 4 locations.
(2) If the segment involved has not been previously tested in place as described in paragraph (1) of this subdivision, the maximum allowable operating pressure must be reduced so that the corresponding hoop stress is not more than that allowed by this Part for new segments of pipelines in the existing class location.
(3) If the segment of pipeline involved has not been qualified for operation under paragraph (1) or (2) of this subdivision, it must be tested in accordance with the applicable requirements of this Part, and its maximum allowable operating pressure must then be established so as to be equal to or less than each of the following:
(i) The maximum allowable operating pressure after the requalification test is 0.8 times the test pressure for Class 2 locations, 0.667 times the test pressure for Class 3 locations, and 0.555 times the test pressure for Class 4 locations.
(ii) The maximum allowable operating pressure confirmed or revised in accordance with the section, may not exceed the maximum allowable operating pressure established before the confirmation or revision.
(iii) The corresponding hoop stress may not exceed 72 percent of SMYS in Class 2 locations, 60 percent of SMYS in Class 3 locations, or 50 percent of SMYS in class 4 locations.
(c) Confirmation or revision of the maximum allowable operating pressure of segment of pipeline in accordance with this section does not preclude the application of sections 255.553 and 255.555 of this Part.
(d) Confirmation or revision of the maximum allowable operating pressure that is required as a result of a study under section 255.609 of this Part must be completed within 18 months of the change in class location.
(e) Pressure reduction under paragraph (b)(2) of this section within the 18-month period does not preclude establishing a maximum allowable operating pressure under paragraph (b)(3) of this section at a later date.
16 CRR-NY 255.611
Current through March 31, 2022
End of Document