255.307 Inspection of materials.
Each length of pipe and each other component must be visually inspected at the site of installation to ensure that it has not sustained any visually determinable damage that could impair its serviceability. These inspections must be made:
(a) prior to the coating operation for field coated pipe; and
(b) as the pipe is lowered into the ditch.