88.1 Exhibit E-1: description of proposed transmission line.
The applicant shall submit a detailed description of the proposed transmission line. Such description shall include:
(a) the design voltage and voltage of initial operation;
(b) the type, size, number and materials of conductors;
(c) insulator design;
(d) the length of the transmission line;
(e) the construction materials of the towers; and
(f) the design standards for each type of tower and tower foundation.
16 CRR-NY 88.1
Current through February 28, 2023
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: JULY 31, 2023, is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Admisnistrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of the NYS Rules.