56-7.3 Asbestos abatement contractor daily project log.
The asbestos abatement contractor shall maintain a daily project log of all pertinent events that occur throughout Phase II of the asbestos project. This project log shall be updated daily throughout Phase II by the on-site supervisor, and shall be kept on-site for the duration of Phase II of the asbestos project. This log shall be made available upon verbal request of the commissioner or his or her duly authorized representative. The following list summarizes the various sections of this Part that require entries into the daily project log by the asbestos abatement contractor supervisor:
(a) Sections 56-7.1(d), 56-8.1(b)(2), 56-9.2(b)(2)—work stoppage due to high air results.
High air result(s) shall be noted along with the time of the work cessation, results of barrier and negative air system inspection, and a summary of any necessary repairs and the required cleaning.
(b) Section 56-7.8(a)(4)—manometer readings.
To be documented twice per workshift.
(c) Section 56-7.8(a)(10)—negative air system.
Daily (even days without workshifts) inspection results and any necessary repairs to be documented.
(d) Section 56-7.9(a)(3)—HVAC system positive pressurization.
Daily (even days without workshifts) inspection and any necessary repairs to be documented.
(e) Section 56-8.2(d)—inspection of barriers.
Daily (even days without workshifts) inspection results and any necessary repairs to be documented. Inspections shall be twice per workshift on days with scheduled work.
(f) Section 56-8.2(f)—testing of barriers and enclosures.
Daily testing as per section 56-8.2(f) and any resulting necessary repairs to be documented.
(g) Section 56-8.2(h)—Daily cleaning of enclosures.
Cleaning to be documented daily at the end of the workshift.
(h) Section 56-8.6(b)(2)(iv)—intermediate completions.
Results of each visual inspection and time of each intermediate completion shall be documented by the supervisor in the daily project log.
(i) Section 56-9.1(d)—visual inspection by project monitor prior to clearance air sampling.
To be documented in daily log by project monitor, along with supervisor.
(j) Section 56-9.2(e)—visual inspection by project monitor for regulated abatement work areas exempt from clearance air sampling.
To be documented in daily project log by project monitor, along with supervisor.
(k) Sections 56-9.3(c), 56-10.4, 56-11.2(f), 56-11.3(e), 56-11.4(d), 56-11.5(c), 56-11.6(e), 56-11.7(d), 56-11.8(d)—final inspection.
To be documented by supervisor at completion of asbestos project and/or work area.