12 CRR-NY 56-4.8NY-CRR

OFFICIAL COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 12. DEPARTMENT OF LABOR
CHAPTER I. INDUSTRIAL BOARD OF APPEALS
SUBCHAPTER A. THE INDUSTRIAL CODE
PART 56. ASBESTOS
SUBPART 56-4. GENERAL PROJECT AIR SAMPLING AND LABORATORY ANALYSIS REQUIREMENTS
12 CRR-NY 56-4.8
12 CRR-NY 56-4.8
56-4.8 Area air sample analysis and results—general requirements.
(a) Turnaround time.
For project air samples collected during the asbestos project, the period of time permitted between completion of air sample collection and receipt of results on the job site shall be equal to or less than 48 hours.
(b) Microscope detail.
The methodology chosen for sampling, analysis, and the microscope type, make, and model number shall be included in the results.
(c) Sample records.
All project air samples shall have a chain of custody.
12 CRR-NY 56-4.8
Current through March 15, 2022
End of Document