56-4.4 Asbestos contractors allowed to perform project air sampling on an asbestos project.
Air sampling procedures shall not be performed by any asbestos contractor involved with the asbestos project, except as follows:
(a) The non-abatement asbestos contractor firm that performed the building/structure asbestos survey, or is acting as the project monitor or project designer on the asbestos project, may perform project air sampling and analysis, provided that the individual or firm performing the building/structure asbestos survey or acting as project monitor or project designer, will not perform any asbestos abatement work on the project and has not retained or been retained by the asbestos abatement contractor for work on the asbestos project, unless the asbestos abatement contractor is also the property owner.