12 CRR-NY 14-4.1NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 12. DEPARTMENT OF LABOR
CHAPTER I. INDUSTRIAL BOARD OF APPEALS
SUBCHAPTER A. THE INDUSTRIAL CODE
PART 14. CONSTRUCTION, INSTALLATION, INSPECTION AND MAINTENANCE OF HIGH PRESSURE BOILERS; CONSTRUCTION OF UNFIRED PRESSURE VESSELS
SUBPART 14-4. REINSTALLATION OF BOILERS
12 CRR-NY 14-4.1
12 CRR-NY 14-4.1
14-4.1 Permission.
Any boiler that was operated in New York State prior to January 1, 1918, or any boiler changing location within the State may be reinstalled provided an “Application for Permission to Install a Second-Hand Boiler” is filed with the commissioner and permission is granted for reinstallation of same.
Exception:
Horizontal-return tubular boilers having a continuous longitudinal lap seam of more than 12 feet in length, shall not be reinstalled.
12 CRR-NY 14-4.1
Current through March 15, 2022
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.