12 CRR-NY 14-1.7NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 12. DEPARTMENT OF LABOR
CHAPTER I. INDUSTRIAL BOARD OF APPEALS
SUBCHAPTER A. THE INDUSTRIAL CODE
PART 14. CONSTRUCTION, INSTALLATION, INSPECTION AND MAINTENANCE OF HIGH PRESSURE BOILERS; CONSTRUCTION OF UNFIRED PRESSURE VESSELS
SUBPART 14-1. DEFINITIONS
12 CRR-NY 14-1.7
12 CRR-NY 14-1.7
14-1.7 Portable boilers.
(a) The owner or user of a portable boiler shall report the location of same to the commissioner or to the insurance company insuring such boiler 30 days prior to the expiration of the certificate of inspection.
(b) No rebuilt portable boiler shall be operated unless the manufacturer has filed with the commissioner a copy of the manufacturer's data covering its construction and the name of the original owner.
12 CRR-NY 14-1.7
Current through March 15, 2022
End of Document