12 CRR-NY 4-10.9NY-CRR
12 CRR-NY 4-10.9
12 CRR-NY 4-10.9
4-10.9 Breakable gages.
A glass gage or sight feed, the breakage of which will allow the discharge of fuel oil from the fuel supply system, shall not be used.
12 CRR-NY 4-10.9
Current through March 15, 2022
End of Document |