9 CRR-NY 7920.6NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 9. EXECUTIVE DEPARTMENT
SUBTITLE BB. STATE ENERGY OFFICE
CHAPTER V. CONSERVATION PROGRAMS
PART 7920. NOT-FOR-PROFIT ENERGY INCENTIVE PROGRAM
9 CRR-NY 7920.6
9 CRR-NY 7920.6
7920.6 Calculation of estimated project cost.
(a) General.
The total estimated project cost shall include costs to be incurred by the applicant and the value of in-kind services to be provided. Such costs shall not include administrative expenses, or costs associated with obtaining a focused energy analysis.
(b) Costs incurred by the applicant shall be based on:
(1) contractor estimates;
(2) supplier estimates;
(3) in-kind labor, materials, or equipment estimates if in-kind is claimed as part or all of an applicant's matching share;
(4) estimates of any construction management and design fees, not to exceed 15 percent of the measure(s); and
(5) estimates of any minor repairs, alterations or other activities directly related to the proper installation of an energy conservation measure, not to exceed 20 percent of the cost of such measure.
(c) In-kind services.
The value assigned to in-kind services is not a cost which is eligible for a program rebate. However, such value may be included as part of the applicant's required contributory or matching share of the total project cost.
9 CRR-NY 7920.6
Current through September 15, 2021
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.