6 CRR-NY 599.2NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 6. DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CHAPTER V. RESOURCE MANAGEMENT SERVICES
SUBCHAPTER E. WATER REGULATION
PART 599. STANDARDS FOR NEW HAZARDOUS SUBSTANCE TANK SYSTEMS
6 CRR-NY 599.2
6 CRR-NY 599.2
599.2 General requirements for underground tank systems.
(a) New underground tank systems - summary of requirements.
Beginning on February 11, 1995, owners and operators of new underground tanks must meet the following requirements:
(1) tanks must be designed in accordance with section 599.3 of this Part;
(2) secondary containment must be designed, constructed and installed as specified in section 599.4 of this Part;
(3) a leak monitoring system must be installed as specified in sections 599.5 and 599.15 of this Part;
(4) tank systems must be installed as specified in section 599.6 of this Part;
(5) new piping being connected to the tank must be designed, constructed and installed as specified in sections 599.12 through 599.16 of this Part;
(6) spill/overfill prevention equipment must be installed as specified in section 599.17 of this Part; and
(7) vents, gauges and alarms must be installed as specified in section 599.18 of this Part.
(b) Compliance with Part 598.
New tank systems must meet all of the requirements of this Part and of Part 598 of this Title before being placed in service.
6 CRR-NY 599.2
Current through February 15, 2022
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.