6 CRR-NY 383-7.5NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 6. DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CHAPTER IV. QUALITY SERVICES
SUBCHAPTER C. RADIATION
PART 383. REGULATIONS FOR LOW-LEVEL RADIOACTIVE WASTE DISPOSAL FACILITIES FINANCIAL ASSURANCE REQUIREMENTS
SUBPART 383-7. REQUIREMENTS FOR DESIGN AND CONSTRUCTION OF LAND DISPOSAL FACILITIES
6 CRR-NY 383-7.5
6 CRR-NY 383-7.5
383-7.5 Additional design and construction requirements for aboveground disposal units.
Aboveground disposal units must be designed to be free standing, engineered structures that can be visually inspected during the operation period. The disposal unit must be designed to accommodate a multi-layered earthen cover, or an alternative approved in the permit, that provides protection to the disposal unit and long-term containment of the waste.
(a) Loads and load combinations.
The disposal unit must be designed to accommodate the loads and load combinations resulting from the placement of a multi-layer earthen cover over and around the disposal unit and the construction equipment required to place the cover, if such a cover is required by the permit.
(b) Protective enclosure.
(1) The disposal unit must be provided with a separate and independently supported protective enclosure that will function during the operation period.
(2) The protective enclosure must be designed to meet the following requirements:
(i) the protective enclosure must be freestanding and provide weather and frost protection to the disposal units until the end of the operation period;
(ii) the protective enclosure must be capable of being removed during facility closure without adversely affecting the performance of the disposal units; and
(iii) the protective enclosure must be watertight and capable of being easily inspected and repaired throughout the operation period.
(3) The roof of the protective enclosure and of the disposal unit must be sloped at a gradient of no less than two percent and sufficient to facilitate drainage and prevent ponding of water.
(c) A multi-layer earthen cover which may be required during facility closure under section 383-9.5 of this Part must meet the design and construction requirements in section 383-7.6(c) of this Subpart.
(d) To facilitate inspection during the operation period, the major structural components of the disposal units must not be covered with materials that would mask structural defects such as cracking or settlement or that would unreasonably impede any required repairs.
6 CRR-NY 383-7.5
Current through June 30, 2022
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.