6 CRR-NY 229.5NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 6. DEPARTMENT OF ENVIRONMENTAL CONSERVATION
CHAPTER III. AIR RESOURCES
SUBCHAPTER A. PREVENTION AND CONTROL OF AIR CONTAMINATION AND AIR POLLUTION
PART 229. PETROLEUM AND VOLATILE ORGANIC LIQUID STORAGE AND TRANSFER
6 CRR-NY 229.5
6 CRR-NY 229.5
229.5 Recordkeeping.
The owner or operator of a gasoline bulk plant, gasoline loading terminal, petroleum liquid storage tank, marine loading vessel facility, or volatile organic liquid storage tank subject to this Part must maintain the following records at the facility for a period of five years;
(a) capacities of petroleum liquid storage tanks subject to section 229.3(a) or (b) of this Part, in gallons;
(b) average daily gasoline throughput per day for gasoline bulk plants subject to section 229.3(c) of this Part, in gallons;
(c) average daily gasoline throughput for gasoline loading terminals subject to section 229.3(d) of this Part, in gallons per year;
(d) capacities of volatile organic liquid storage tanks, subject to section 229.3(e) of this Part in gallons; and
(e) daily gasoline throughput for marine vessel loading facilities subject to section 229.3(f) of this Part, in gallons.
6 CRR-NY 229.5
Current through December 31, 2021
End of Document