18.21 Inspection or audit period.
Whenever a written contract entered into on or after July 1, 1984 provides that payment must be preceded by an inspection period or by an audit to determine resources applied or used by the contractor, the contract shall set forth the maximum period within which the inspection or audit shall be completed or conducted.
2 CRR-NY 18.21
Current through August 31, 2022
End of Document |
IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.