613-6.3 Initial abatement measures and site check.
(a) Unless directed to do otherwise by the department, the facility must perform the following abatement measures:
(1) remove as much of the petroleum from the tank system as is necessary to prevent further release;
(2) visually inspect any aboveground releases or exposed belowground releases and prevent further petroleum migration;
(3) continue to monitor and mitigate any additional fire and safety hazards posed by vapors or free product that have migrated from the excavation zone and entered into subsurface structures (such as sewers or basements);
(4) remedy hazards posed by contaminated soils that are excavated or exposed as a result of release confirmation, site investigation, abatement, or corrective action activities. If these remedies include treatment or disposal of soils, the facility must comply with applicable State and local requirements;
(5) measure for the presence of a release where contamination is most likely to be present at the facility, unless the presence and source of the release have been confirmed in accordance with the site check required by section 613-2.4(c)(2), 613-3.4(c)(2), or 613-4.4(c)(2) of this Part, or the site assessment required by section 613-2.6(c) of this Part. In selecting sample types, sample locations, and measurement methods, the facility must consider the nature of the petroleum stored, the type of backfill, depth to groundwater and other factors as appropriate for identifying the presence and source of the release; and
(6) investigate to determine the possible presence of free product, and begin free product removal as soon as practicable and in accordance with section 613-6.5 of this Subpart.
(b) Within 20 days after release confirmation, a facility must submit:
(1) a report to the department summarizing the initial abatement steps taken under subdivision (a) of this section; and
(2) any resulting information or data.
6 CRR-NY 613-6.3
Current through February 15, 2022
End of Document

IMPORTANT NOTE REGARDING CONTENT CURRENCY: The "Current through" date indicated immediately above is the date of the most recently produced official NYCRR supplement covering this rule section. For later updates to this section, if any, please: consult editions of the NYS Register published after this date; or contact the NYS Department of State Division of Administrative Rules at [email protected]. See Help for additional information on the currency of this unofficial version of NYS Rules.