17 CRR-NY 154-3.4NY-CRR

STATE COMPILATION OF CODES, RULES AND REGULATIONS OF THE STATE OF NEW YORK
TITLE 17. DEPARTMENT OF TRANSPORTATION
CHAPTER IV. HIGHWAYS
SUBCHAPTER C. HIGHWAY USE AND MAINTENANCE
PART 154. SPECIAL HAULING PERMITS
SUBPART 154-3. NONDIVISIBLE LOAD STATUS DETERMINATIONS
17 CRR-NY 154-3.4
17 CRR-NY 154-3.4
154-3.4 Status determination procedure.
(a) The applicant must submit in writing a request for nondivisible load status to the Department of Transportation, Permit Unit, Building 5, Room 311, State Campus, 1220 Washington Avenue, Albany, NY 12232. The written request must contain an explanation as to why the particular load meets the criteria as established in this Subpart.
(b) The commissioner, or his/her designee(s), shall render a determination of the applicant's request within 10 days after the receipt of the request. This determination shall be final.
(c) Once nondivisible load status is granted, the applicant is eligible for a nondivisible load permit, and any permit therefor shall be issued in accordance with the procedures of this Part.
17 CRR-NY 154-3.4
Current through December 15, 2021
End of Document