Part 14 Construction, Installation, Inspection and Maintenance of High Pressure Boilers; Construction of Unfired Pressure Vessels
IMPORTANT NOTE REGARDING CONTENT CURRENCY: The date provided at the bottom of every rule section is the date of the most recently produced official NYCRR supplement covering that section. See Help for additional information on the currency of this unofficial version of the NYS Rules.
- 12 CRR-NY I A 14 Notes
- Subpart 14-1 Definitions
- Subpart 14-2 Inspection
- Subpart 14-3 Repairs, Alterations and Miscellaneous Requirements
- Subpart 14-4 Reinstallation of Boilers
- Subpart 14-5 Heating of Liquids
- Subpart 14-6 Removal of Waste Gases from Boilers
- Subpart 14-7 Forced Circulation Boilers
- Subpart 14-8 Standard Tolerance of Tube Bends
- Subpart 14-9 Power Boilers: New Installations
- Subpart 14-10 Power Boilers: Existing Installations
- Subpart 14-11 Miniature Boilers
- Subpart 14-12 (Repealed)
- Subpart 14-13 (Repealed)
- Subpart 14-14 (Repealed)
- Subpart 14-15 (Repealed)