Transmission Pipeline Integrity Management
- s 255.901 Scope.
- s 255.903 Definitions.
- s 255.905 High consequence areas.
- s 255.907 General.
- s 255.909 Changes to an integrity management program.
- s 255.911 Required elements.
- s 255.913 Deviation from the requirements of this Part.
- s 255.915 Knowledge and training.
- s 255.917 Identification of potential threats to pipeline.
- s 255.919 Baseline assessment plan.
- s 255.921 Conducting a baseline assessment.
- s 255.923 Direct assessment.
- s 255.925 External corrosion direct assessment (ECDA).
- s 255.927 Internal corrosion direct assessment (ICDA).
- s 255.929 Direct assessment for stress corrosion cracking (SCCDA).
- s 255.931 Confirmatory direct assessment (CDA).
- s 255.933 Addressing integrity issues.
- s 255.935 Preventive and mitigative measures to protect the high consequence areas.
- s 255.937 Continual process of evaluation and assessment.
- s 255.939 Reassessment intervals.
- s 255.941 Low stress reassessment.
- s 255.943 Deviation from reassessment intervals.
- s 255.945 Measuring program effectiveness.
- s 255.947 Records.
- s 255.949 Notification requirements.
- s 255.951 Reporting requirements.
- s 255.1001 Definitions that apply to sections 255.1003 through 255.1015 of this Part.
- s 255.1003 General requirements of a GDPIM plan.
- s 255.1005 Implementation requirements of a GDPIM plan.
- s 255.1007 Required elements of a GDPIM plan.
- s 255.1009 Required report when compression couplings fail.
- s 255.1011 Records an operator must keep.
- s 255.1013 Deviations from required periodic inspections.
- s 255.1015 GDPIM plan requirements for a master meter or a small liquefied petroleum gas (LPG) operator.