Subpart 56-11 Special Projects Section
- 12 CRR-NY I A 56-11 Notes
- s 56-11.1 In-plant operations.
- s 56-11.2 Emergency projects.
- s 56-11.3 Minor asbestos projects or minor size regulated abatement work area.
- s 56-11.4 Pre-demolition asbestos abatement projects.
- s 56-11.5 Controlled demolition with asbestos in place.
- s 56-11.6 Exterior project removal of non-friable ACM roofing, siding, caulking, glazing compound, transite, tars, sealers, coatings, and other NOB ACMs.
- s 56-11.7 Non-friable flooring and/or mastic removal.
- s 56-11.8 Abandoned pipe/duct/conduit wrap and cut removal.