§ 27-107. Construction plan required prior to underground construction in a public roadway
West's Annotated Code of MarylandPublic UtilitiesEffective: October 1, 2010
Effective: October 1, 2010
MD Code, Public Utilities, § 27-107
§ 27-107. Construction plan required prior to underground construction in a public roadway
(a)(1) Before a person begins underground construction in a public roadway in the sanitary district, the person shall file with the Commission a construction plan that shows the location and depth of the proposed main, conduit, or pipe in the public roadway.
(b)(1) The Commission may remove or change the location of a conduit, main, or pipe that interferes with the operation of the Commission's water and sewer systems if:
(c)(1) If a person has a building, conduit, pipe, track, or other physical obstruction on a public roadway in Montgomery County or Prince George's County that blocks or impedes the Commission's water or sewer system, on reasonable notice from the Commission, the person shall promptly adjust, accommodate, or remove the obstruction at the person's expense and in a manner that fully meets the Commission's needs.
Credits
Added by Acts 2010, c. 37, § 3, eff. Oct. 1, 2010.
MD Code, Public Utilities, § 27-107, MD PUBLIC UTIL § 27-107
Current through legislation effective through April 9, 2023, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document |