§ 21-104. Use of green building technologies with capital projects
West's Annotated Code of MarylandPublic UtilitiesEffective: October 1, 2012
Effective: October 1, 2012
MD Code, Public Utilities, § 21-104
§ 21-104. Use of green building technologies with capital projects
(b) It is the intent of the General Assembly that, to the extent practicable:
(c) Except as provided in subsections (d) and (e) of this section, if a capital project includes the construction or major renovation of a building that is 7,500 square feet or greater, the building shall be constructed or renovated to be a high performance building.
(d) The following types of unoccupied buildings are not required to be constructed or renovated to be high performance buildings:
(e)(1) The Commission may request from the county where the proposed capital project is located a waiver from complying with subsection (c) of this section.
(2) On receipt of a written request of a waiver under this subsection, with approval of the county executive, the county council of the county where the proposed capital project is located may issue a waiver under this subsection if the county council determines that the use of a high performance building in a proposed capital project is not practicable.
Credits
Added by Acts 2012, c. 403, § 1, eff. Oct. 1, 2012.
MD Code, Public Utilities, § 21-104, MD PUBLIC UTIL § 21-104