§ 12-605. Cut-in certificate required before electrical current turned on
West's Annotated Code of MarylandPublic SafetyEffective: October 1, 2010
Effective: October 1, 2010
MD Code, Public Safety, § 12-605
§ 12-605. Cut-in certificate required before electrical current turned on
(a) Before a utility authorizes electrical current to be turned on for a premise or structure, the utility must receive a cut-in certificate from a certified nongovernmental electrical inspector or governmental unit that is qualified to issue electrical inspection certificates.
Credits
Added by Acts 2010, c. 127, § 1, eff. Oct. 1, 2010.
MD Code, Public Safety, § 12-605, MD PUBLIC SAFETY § 12-605
Current through legislation effective through April 9, 2023, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document |