§ 5-606. Requirements concerning sanitary sewer lines
West's Annotated Code of MarylandLabor and Employment
MD Code, Labor and Employment, § 5-606
§ 5-606. Requirements concerning sanitary sewer lines
(a) Upon installation of a sanitary sewer line in the State, each connection brought to the property line shall have a combination type fitting, capped at the horizontal end, with a vertical pipe capped within 4 feet of the surface.
(b) Each sewer house connection shall be designed to optimize safety, economy, functional efficiency, and operational maintenance.
(c) Vertical pipes to be used for house connections or cleanout pipes shall be a minimum of 4 inches in diameter.
Credits
Added by Acts 1991, c. 547, § 2.
MD Code, Labor and Employment, § 5-606, MD LABOR & EMPLY § 5-606
Current through legislation effective through April 9, 2023, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document |