Home Table of Contents

§ 5-606. Requirements concerning sanitary sewer lines

West's Annotated Code of MarylandLabor and Employment

West's Annotated Code of Maryland
Labor and Employment
Title 5. Occupational Safety and Health (Refs & Annos)
Subtitle 6. Miscellaneous Provisions (Refs & Annos)
MD Code, Labor and Employment, § 5-606
§ 5-606. Requirements concerning sanitary sewer lines
Connections
(a) Upon installation of a sanitary sewer line in the State, each connection brought to the property line shall have a combination type fitting, capped at the horizontal end, with a vertical pipe capped within 4 feet of the surface.
Design
(b) Each sewer house connection shall be designed to optimize safety, economy, functional efficiency, and operational maintenance.
Minimum diameter specifications
(c) Vertical pipes to be used for house connections or cleanout pipes shall be a minimum of 4 inches in diameter.
Scope of section
(d) The requirements of this section apply in each county and subdivision in the State for any new installation or major modification occurring on or after January 1, 1992.

Credits

Added by Acts 1991, c. 547, § 2.
MD Code, Labor and Employment, § 5-606, MD LABOR & EMPLY § 5-606
Current through legislation effective through April 9, 2023, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document