§ 23-105. Acquisition of municipal water or sewer systems
West's Annotated Code of MarylandPublic UtilitiesEffective: October 1, 2010
Effective: October 1, 2010
MD Code, Public Utilities, § 23-105
§ 23-105. Acquisition of municipal water or sewer systems
(a) After the payment for the acquisition is made to the court or to the municipality:
(2) all properties along the line of any water main or sewer of the municipal system shall stand in the same relation, bear the same benefit assessment, and be subject to the same regulations and penalties as though the municipal system had been constructed and put into operation by the Commission under the provisions of this division.
(b) A building or premises properly connected with the acquired municipal system at the time of its purchase is not subject to the connection charge specified under Title 26, Subtitle 3 of this article.
(c) If outstanding bonds exist for a municipal system acquired by the Commission:
Credits
Added by Acts 2010, c. 37, § 3, eff. Oct. 1, 2010.
MD Code, Public Utilities, § 23-105, MD PUBLIC UTIL § 23-105
Current through legislation effective through May 9, 2024, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document |