§ 7-304. Energy allocation equipment and procedures used for apartments
West's Annotated Code of MarylandPublic Utilities
MD Code, Public Utilities, § 7-304
Formerly cited as MD PUBLIC UTIL COMP § 7-304
§ 7-304. Energy allocation equipment and procedures used for apartments
(b)(1) Approval from the Commission is required before energy allocation equipment and procedures may be used by the owner, operator, or manager of an apartment house to determine the amount of gas or electricity used by an individual dwelling unit, if the amount of gas or electricity is determined by means other than by actual measurement of fuel or electric power consumed by the unit.
(c)(1) The Commission shall adopt regulations that specify the conditions under which the energy allocation equipment and procedures approved by it under subsection (b) of this section may be implemented.
(d) The Commission shall send any complaint it receives about an individual dwelling unit's gas or electric power consumption to the Office of the Attorney General, Consumer Protection Division, if the dwelling unit's gas or electric power consumption is determined by the use of energy allocation equipment and procedures approved by the Commission under subsection (b) of this section.
Credits
Added by Acts 1998, c. 8, § 2, eff. Oct. 1, 1998.
Formerly Art. 78, § 54H.
MD Code, Public Utilities, § 7-304, MD PUBLIC UTIL § 7-304
Current through legislation effective through April 9, 2023, from the 2024 Regular Session of the General Assembly. Some statute sections may be more current, see credits for details.
End of Document |