Appendix J Examples of Tiering EIR's
SPECIAL SITUATIONS/EIRs
Multiple-family residential development/residential and commercial or retail mixed-use development (PRC 21158.5 and Guidelines 15179.5)
• project is multiple-family residential development up to 100 units or is a residential and commercial or retail mixed-use development of not more than 100,000 square feet
• if project complies with procedures in section 21158.5, only a focused EIR need be prepared, notwithstanding the fact that the project wasn't identified in the Master EIR
Redevelopment Project (15180)
• all public and private activities or undertakings in furtherance of a redevelopment plan (public or private) constitute a single project
• the redevelopment plan EIR is treated as a program EIR
• no subsequent EIR is required for individual components of the redevelopment plan unless substantial changes or substantial new information triggers a subsequent EIR or supplement to an EIR pursuant to (sections 15162 or 15163)
Housing/neighborhood commercial facilities (15181)
• a project involving construction of housing or neighborhood commercial facilities in an urbanized area
• a prior EIR for a specific plan, local coastal program, or port master plan may be used as the EIR for such a project (no new EIR need be prepared) provided section 15181 procedures are complied with
Projects Consistent with Community Plan, General Plan, or Zoning (15183)
• a project which is consistent with a community plan adopted as part of a general plan or zoning ordinance or a general plan of a local agency and where there was an EIR certified for the zoning action or master plan
• the EIR for the residential project need only examine certain significant environmental effects, as outlined in section 15183
Regulations on Pollution Control Equipment (PRC section 21159)
• section 21159 requires environmental analysis of reasonably foreseeable methods of compliance at the time of adoption of rule or regulation requiring the installation of pollution control equipment
• an EIR prepared at the time of adoption of the rule or regulation is deemed to satisfy the requirement of section 21159
Installation of Pollution Control Equipment (PRC section 21159.1)
• a focused EIR is permitted where project 1) consists solely of installation of pollution control equipment; 2) is required by rule or regulation adopted by the State Air Resources Board, an air pollution control district or air quality management district, the State Water Resources Control Board, a California regional water quality control board, the Dept. of Toxic Substances Control, or the California Integrated Waste Management Board; and 3) meets the procedural requirements outlined in section 21159.1
HISTORY
1. New Appendix J filed 2-2-78; effective thirtieth day thereafter (Register 78, No. 5).
2. Relettering of former Appendix J to Appendix I and new Appendix J filed 10-26-98; operative 10-26-98 pursuant to Public Resources Code section 21087 (Register 98, No. 44).
This database is current through 1/7/22 Register 2022, No. 1
14 CCR Appendix J, 14 CA ADC Appendix J