Home Table of Contents

§ 1020.1. Fees for MH-Unit Installation and Standard Plan Approval Foundation System Permits.

25 CA ADC § 1020.1Barclays Official California Code of RegulationsEffective: April 1, 2024

Barclays California Code of Regulations
Title 25. Housing and Community Development
Division 1. Housing and Community Development
Chapter 2. Mobilehome Parks and Installations
Article 1. Administration and Enforcement
Effective: April 1, 2024
25 CCR § 1020.1
§ 1020.1. Fees for MH-Unit Installation and Standard Plan Approval Foundation System Permits.
(a) The following fees shall apply to MH-unit installations and foundation systems with standard plan approvals:
(1) MH-units with only one (1) transportable section: two hundred thirty-eight dollars ($238) for the first whole hour or fractional part thereof of inspection time. When the inspection time exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: one hundred two dollars ($102).
(B) Each thirty (30) minutes, or fractional part thereof: fifty-one dollars ($51).
(2) MH-unit with two (2) transportable sections: three hundred forty dollars ($340) for the first two (2) hours or fractional part thereof of inspection time. When the inspection time exceeds two (2) hours, the following fees shall apply:
(A) Subsequent whole hours: one hundred two dollars ($102).
(B) Each 30 minutes, or fractional part thereof: fifty-one dollars ($51).
(3) MH-unit with three (3) transportable sections: four hundred forty-two dollars ($442) for the first three (3) hours or fractional part thereof of inspection time. When the inspection time exceeds three (3) hours, the following fees shall apply:
(A) Subsequent whole hours: one hundred two dollars ($102).
(B) Each 30 minutes, or fractional part thereof: fifty-one dollars ($51).
(4) MH-unit with four (4) or more transportable sections: five hundred forty-four dollars ($544) for the first four (4) hours or fractional part thereof of inspection time. When the inspection time exceeds four (4) hours, the following fees shall apply:
(A) Subsequent whole hours: one hundred two dollars ($102).
(B) Each 30 minutes, or fractional part thereof: fifty-one dollars ($51).
(5) Foundation system permit fee: refer to valuation tables in Section 1020.7 of this article.
(A) Plan check fees shall not be required for a foundation system for which a standard plan approval has been obtained from the department.
(6) Reinspection Fee: Two hundred twenty-three dollars ($223) for the first whole hour or fractional part thereof of reinspection time. When the reinspection time exceeds one hour, the following fees shall apply:
(A) Second and subsequent whole hours: one hundred two dollars ($102).
(B) Each thirty minutes (30), or fractional part thereof: fifty-one dollars ($51).

Credits

Note: Authority cited: Sections 18300, 18502.5, 18551 and 18613, Health and Safety Code. Reference: Sections 18500, 18501, 18502, 18503, 18551 and 18613, Health and Safety Code.
History
1. New section filed 7-6-2004; operative 7-6-2004 pursuant to Government Code section 11343.4 (Register 2004, No. 28).
2. Amendment filed 12-29-2005; operative 1-1-2006 pursuant to Government Code section 11343.4 (Register 2005, No. 52).
3. Amendment of subsection (a)(1) filed 1-21-2009; operative 1-21-2009 pursuant to Government Code section 11343.4 (Register 2009, No. 4).
4. Amendment filed 2-27-2024; operative 4-1-2024 (Register 2024, No. 9).
This database is current through 5/10/24 Register 2024, No. 19.
Cal. Admin. Code tit. 25, § 1020.1, 25 CA ADC § 1020.1
End of Document