Home Table of Contents

Appendix VI Underground Storage Tank Monitoring System Certification Form

23 CA ADC Div. 3 Ch. 16 App. VIBarclays Official California Code of Regulations

Barclays California Code of Regulations
Title 23. Waters
Division 3. State Water Resources Control Board and Regional Water Quality Control Boards
Chapter 16. Underground Tank Regulations
23 CCR Div. 3 Ch. 16 App. VI
Appendix VI Underground Storage Tank Monitoring System Certification Form
TYPE OF ACTION
Empty Checkbox​ Installation
Empty Checkbox​ Repair
Empty Checkbox​ 12 Month
1. FACILITY INFORMATION
CERS ID
Certification Date
 
Facility Name
 
Facility Address
City
ZIP Code
 
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification
Phone
 
Mailing Address
 
Service Technician Performing Test
 
Contractor/Tank Tester License Number
 
ICC Number
ICC Expiration Date
 
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications
Expiration Date
 
 
 
 
 
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting documentation is attached; and all information contained herein is accurate.
Service Technician Signature
Date
Total # of Pages
 
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification, ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank, VPH = Vacuum/Pressure/Hydrostatic
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System Control Panel
Model of Monitoring System Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating either; ___ Monitoring System Set-up ___ Alarm History Report
Yes
No
NA
All monitoring equipment is operational per manufacturer's specifications?
Empty Checkbox
Empty Checkbox
Secondary containment systems are free of damage, debris, or liquid?
Empty Checkbox
Empty Checkbox
Are the audible and visual alarms operational?
Empty Checkbox
Empty Checkbox
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual buildup on floats; and 2) tested for functionality and confirmed operational?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Are all sensors installed to detect a release at the earliest opportunity in the secondary containment?
Empty Checkbox
Empty Checkbox
Empty Checkbox
The monitoring system set-up was reviewed, and proper settings confirmed?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Was the monitoring control panel's backup battery visually inspected, functionally tested, and confirmed operational?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Does the flow of fuel stop at the dispenser if a release is detected in the under-dispenser containment?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Does the turbine automatically shut down if the piping secondary containment monitoring system detects a release? Which sensors initiate positive shut down? (Check all that apply) Empty Checkbox​ Sump Empty Checkbox​ UDC
Empty Checkbox
Empty Checkbox
Empty Checkbox
If monitoring system alarms are relayed to a remote monitoring center, is all communication equipment operational?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9.
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID
Sensor Model
Component(s) Monitored
Pass
Fail
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
7. LINE LEAK DETECTOR TESTING
Empty Checkbox​ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.) Empty Checkbox​ 3 GPH Empty Checkbox​ 0.1 GPH Empty Checkbox​ 0.2 GPH
Yes
No
NA
Has the testing apparatus been properly calibrated?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For mechanical LLDs, does the LLD restrict the flow through the pipe when a release is detected?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For electronic LLDs, does the turbine automatically shut off when a release is detected?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a tightness test?
Empty Checkbox
Empty Checkbox
Empty Checkbox
For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Were all items on the equipment manufacturer's maintenance checklist completed?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Were all LLDs confirmed operational within regulatory requirements?
Empty Checkbox
Empty Checkbox
Empty Checkbox
LLD ID
LLD Model
Lines Monitored
Pass
Fail
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
8. IN-TANK GAUGING TESTING
Empty Checkbox​ Check this box if tank gauging is used only for inventory control.
Yes
No
NA
Empty Checkbox​ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; and 2) tested for ground faults?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Was accuracy of system's product level readings tested?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Was accuracy of system's water level readings tested?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Were all probes reinstalled properly?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Were all items on the equipment manufacturer's maintenance checklist completed?
Empty Checkbox
Empty Checkbox
Empty Checkbox
Probe ID
Probe Model
Tanks Monitored
Pass
Fail
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
 
 
 
Empty Checkbox
Empty Checkbox
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
10. MONITORING SITE PLAN
Date site plan was prepared:
If a site plan has been prepared that shows all required information, you may include it, rather than this page, with your Monitoring System Certification Form. The site plan must show the general layout of tanks and identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include a legend for all symbols depicted.

Credits

History
1. New Appendix VI filed 5-14-2001; operative 5-14-2001 pursuant to Government Code section 11343.4 (Register 2001, No. 20). For prior history, see Register 94, No. 14.
2. Amendment filed 12-18-2007; operative 1-17-2008 (Register 2007, No. 51).
3. Repealer and new Appendix VI filed 8-27-2018; operative 10-1-2018 (Register 2018, No. 35).
4. Repealer and new appendix filed 8-27-2020; operative 10-1-2020 (Register 2020, No. 35). Filing deadline specified in Government Code section 11349.3(a) extended 60 days pursuant to Executive Order N-40-20 and an additional 60 days pursuant to Executive Order N-66-20.
This database is current through 4/26/24 Register 2024, No. 17.
Cal. Admin. Code tit. 23, Div. 3 Ch. 16 App. VI, 23 CA ADC Div. 3 Ch. 16 App. VI
End of Document