§ 2550.6. Compliance Period.
23 CA ADC § 2550.6Barclays Official California Code of Regulations
23 CCR § 2550.6
§ 2550.6. Compliance Period.
(a) The regional board shall specify in waste discharge requirements a compliance period for each Class I waste management unit. The compliance period is the number of years equal to the active life of the waste management unit (including any waste management activity prior to the adoption of the waste discharge requirements) plus the closure period. The compliance period is the minimum period of time during which the discharger shall conduct a water quality monitoring program subsequent to a release from the unit.
(c) If the discharger is engaged in a corrective action program at the scheduled end of the compliance period specified under subsection (a) of this section, the compliance period shall be extended until the discharger can demonstrate that the waste management unit has been in continuous compliance with its water quality protection standard of section 2550.2 of this article for a period of three consecutive years.
Credits
Note: Authority cited: Section 1058, Water Code. Reference: Sections 13172, 13263, and 13267, Water Code.
History
1. New section filed 5-24-91; operative 7-1-91 (Register 91, No. 22).
2. Amendment of subsection (a) filed 6-18-97; operative 7-18-97 (Register 97, No. 25).
This database is current through 5/24/24 Register 2024, No. 21.
Cal. Admin. Code tit. 23, § 2550.6, 23 CA ADC § 2550.6
End of Document |