Home Table of Contents

Appendix C--Sample Certificate of Completion.

23 CA ADC Div. 2 Ch. 2.7 App. CBarclays Official California Code of Regulations

Barclays California Code of Regulations
Title 23. Waters
Division 2. Department of Water Resources
Chapter 2.7. Model Water Efficient Landscape Ordinance
23 CCR Div. 2 Ch. 2.7 App. C
Appendix C--Sample Certificate of Completion.
CERTIFICATE OF COMPLETION
This certificate is filled out by the project applicant upon completion of the landscape project.
PART 1. PROJECT INFORMATION SHEET
Date
Project Name
Name of Project Applicant
Telephone No.
Fax No.
Title
Email Address
Company
Street Address
City
State
Zip Code
Project Address and Location:
Street Address
Parcel, tract or lot number, if available.
City
Latitude/Longitude (optional)
State
Zip Code
Property Owner or his/her designee:
Name
Telephone No.
Fax No.
Title
Email Address
Company
Street Address
City
State
Zip Code
Property Owner
“I/we certify that I/we have received copies of all the documents within the Landscape Documentation Package and the Certificate of Completion and that it is our responsibility to see that the project is maintained in accordance with the Landscape and Irrigation Maintenance Schedule.”
 
Property Owner Signature
Date
Please answer the questions below:
1. Date the Landscape Documentation Package was submitted to the local agency__________
2. Date the Landscape Documentation Package was approved by the local agency__________
3. Date that a copy of the Water Efficient Landscape Worksheet (including the Water Budget Calculation) was submitted to the local water purveyor__________
PART 2. CERTIFICATION OF INSTALLATION ACCORDING TO THE LANDSCAPE DOCUMENTATION PACKAGE
“I/we certify that based upon periodic site observations, the work has been completed in accordance with the ordinance and that the landscape planting and irrigation installation conform with the criteria and specifications of the approved Landscape Documentation Package.”
Signature*
Date
Name (print)
Telephone No.
Fax No.
Title
Email Address
License No. or Certification No.
Company
Street Address
City
State
Zip Code
* Signer of the landscape design plan, signer of the irrigation plan, or a licensed landscape contractor.
PART 3. IRRIGATION SCHEDULING
Attach parameters for setting the irrigation schedule on controller per ordinance Section 492.10.
PART 4. SCHEDULE OF LANDSCAPE AND IRRIGATION MAINTENANCE
Attach schedule of Landscape and Irrigation Maintenance per ordinance Section 492.11.
PART 5. LANDSCAPE IRRIGATION AUDIT REPORT
Attach Landscape Irrigation Audit Report per ordinance Section 492.12.
PART 6. SOIL MANAGEMENT REPORT
Attach soil analysis report, if not previously submitted with the Landscape Documentation Package per ordinance Section 492.6.
Attach documentation verifying implementation of recommendations from soil analysis report per ordinance Section 492.6.

Credits

History
1. New Appendix C filed 9-10-2009; operative 9-10-2009 pursuant to Government Code section 11343.4 (Register 2009, No. 37).
2. Repealer and new Appendix C filed 9-15-2015; operative 9-15-2015. Exempt from OAL review and submitted to OAL for printing only pursuant to Governor's Executive Order No. B-29-15 (4-1-2015) (Register 2015, No. 38).
This database is current through 4/5/24 Register 2024, No. 14.
Cal. Admin. Code tit. 23, Div. 2 Ch. 2.7 App. C, 23 CA ADC Div. 2 Ch. 2.7 App. C
End of Document